2,762 results • Best match
Procurement and spreading of various sizes of metal in the substation yard
Up-gradation of 66 kV Substation Nilambur- Yard metalling of new 110 kV yard.
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SET, 200 KVA SUB STATION, 200 KVA DG SET, AIR CONDITIONING UNITS, STREET LIGHTS ETC AT OFFICE AND STAFF AND LABOUR QUARTERS OF ICRI, THE RESEARCH WING OF SPICES BOARD, MYLADUMPARA, IDUKKI INCLUDING SHIFT DUTY DURING 2022-23. SH. MAINTENANCE OF IEI AND FANS, AMC OF DG SET, SERVICING OF AC UNITS AND OPERATION OF PUMP SETS ETC
The work is to be carried out at newly formed yard at 110kV substation Kubanur. The major items of works involved are earth work excavation, reinforced cement concrete, cement plastering, and structural steel works for cable trench.
RCC Foundation for Transformer plinth,13 meter column and bay equipments,Loading and Unloading of materials,Erection of 110kV bay equipments
Construction of New Road at 33 kV Substation, Kalloorkkad
Extension of Control room at 110 kV Substation, Aruvikkara
Extension of Control room at 110 kV Substation, Varkala
Control Room extension at 110 kV Substation, Athani, Thrissur
Yard fencing and Yard metalling at 110kV Substation Parassala
MANUFACTURING, SUPPLYING, LAYING, TESTING AND COMMISSIONING 10.15km OF SINGLE CIRCUIT 33KV, 3X300SQMM XLPE UG CABLE FROM NEDUMPOYIL SUBSTATION TO THE PROPOSED 33KV SUBSTATION, KELAKAM
Painting of400kV Substation building Mini control room building work shop building near mini control room generator room security cabin etc at 400kV Substation Madakkathara
Up gradation of 33kV Substation Pariyaram to110kV-Construction of 3km 110kV DC line from Mudikanam to Pariyaram substation using AL-59 Wolf equivalent conductor.
Capital work of 110kV Substation Parassala - Providing Auxiliary mat for isolator operating locations and additional earthing for yard equipment at 110 kV Substation Parassala
Construction of cable trench and re arrangement of outgoing 11kVcables at 110kV Substation Piravom
Construction of compound wall, gate and security cabin at front side of Edarikode Substation
Dismantling roofing ceiling wall steel work Steel work for truss purlin GI sheet roofing Galvanised steel sheet Earthwork excavation RR and Laterate masonry Plastering filling earth CC flooring Painting renewing glass planes fixing rolling shutter
Earthwork excavation Supplying filling quarry muck Providing and laying concrete paver blocks Centering shuttering CC 1 2 4
Earth work in excavation PCC RCC Centering and shuttering Structural steel work Filling using Dept earth Providing and fixing aluminium work Laterite masonry Solid block masonry Providing and fixing pre laminated particle board Solid bloc
Demolishing CC Demolishing brick laterate Filling contractors earth Solid block masonry PCC Vitrified tiling Ceramic tiling Aluminium works for doors windows providing glazing for doors PVC door Painting Plastering Sanitary pipes and fittings
Supplying and filling Surface dressing of the ground Earth work in excavation RCC work Steel reinforcement for RCC work Plastering Finishing walls with Deluxe multi surface paint Centering and shuttering Scarifying metalled road surface Solid
Earth work excavation PCC RCC Steel reinforcement Centering Shuttering Filling dept and contractors earth Aluminium works for door and windows Solid block masonry Plastering Vitrified floor tiling Painting Interlocking Steel works etc
Earth work in excavation Random rubble masonry Solid block masonry Dry rubble without concrete Conveying departmental excavated earth to other departmental areas Finishing walls with Deluxe multi surface paint
Operation and Maintenance of 110 kV Substations and Power Distribution Systems at Technopark Phase-III and Technocity Campuses Thiruvananthapuram
SPECIAL REPAIR AND REPLACEMENT OF BER OCB PANEL WITH VCBs AT SUBSTATIONS AT INS DRONACHARYA UNDER GE FORT KOCHI
Laying 1 Km UG cable from Piravom substation to Nadukurish
110 kV GIS Substation at Malappuram- Construction of GIS building
Centering and shuttering PCC Steel work in built up tubular section Providing and fixing precoated galvanised iron profile sheets Finishing with Epoxy paint Providing and fixing PVC pipes etc.
Proposed110kV Substation Kuttikkol- Supplying and Erection of Yard lights
DESIGN, DESIGN VERIFICATION, DETAIL ENGINEERING, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 750 V DC THIRD RAIL TRACTION ELECTRIFICATION AND AUXILIARY SUB STATIONS (ASS) AND ASSOCIATED SCADA SYSTEMS FOR PHASE -1 EXTENSION
TWSS Mace of Head works at Aruvikkara Overhauling and oil filtration of 500KVA Transformer No 1 2 of 11KV sub station, 72MLD plant at Aruvikkara
Constructing 16km dedicated feeder with HT ABC from 110KV Sub Station Mallappally to Amity Rock Products Chunkappara under Electrical Section Vaipur of Electrical Division Thiruvalla
Annual Plan-Construction of Protection Fence at KSEB Sub Station - Nettayil Road in Ward 03 of Thiruvarppu GP-TVP GP 822023-24- General Civil Work
Civil work for substation
Operation and Maintenance of 33kV and 11kV substations, 11kV Diesel Generator and LT DG sets in IISERTVM campus, Thiruvananthapuram
Operation and Maintenance of 33kV and 11kV substations, 11kV Diesel Generator and LT DG sets in IISERTVM campus, Thiruvananthapuram
Supply and drawing 10 km 33kV 99 mm2 8.3kA ACSR covered conductor from 110kV Substation, Edathua to proposed 33kV Substation, Kidangara
Supply of 40 Nos.3Overcurrent and E/F Relay with SEF protection facility for 11kV feeder panels at various Substations under Transmission Division Tirur
Earth work excavation in all kinds of soil and hard rock blasting prohibited PCC RCC Steel reinforcement with TMT bars Centering and shuttering works Filling available earth Plastering Painting Solid block masonry Steel works
Plastering Providing vitrified tile in floors skirting steps Providing ceramic glazed tiles in floors and walls Taking out wooden door shutter
Demolishing stone rubble masonry cement concrete brick work and RCC work Earthwork excavation Random rubble masonry PCC RCC Centering and shuttering Conveying the newly casted slabs filling earth Structural steel work Plastering works etc
demolishing rcc earthwork excavation laterite masonry plastering cement concrete supplying and fixing steel pipes frames sectioning supplying 6mm and 40 mm metal spreading 6mm and 40mm steel work
Earth work in excavation Random rubble masonry Solid block masonry Dry rubble without concrete Fencing with angle iron post Structural steel work RCC Steel reinforcement for RCC work Centering and shuttering Plastering painting
Clearing jungle Earthwork excavation Demolishing brick laterite stone rubble cement concrete Sectioning Loading transporting filling earth Supply and compaction of quarry muck Steel work PCC RCC steel reinforcement RR and solid block masonry Plasteri
Earth work in excavation PCC Centering and shuttering RCC Structural steel work Plastering Providing weep holes Filling available excavated earth etc
Capital Work of 220kV Substation, Kalamassery Concreting of existing road at north side of 220kV yard and road near storage plinth at 220kV Substation Kalamassery
Capital Work of 66kV Substation, Kattanam- Capacity addition work at 66kV Substation,Kattanam from 20MVA to 30MVA by installing an additional 66/11kV 10MVA Transformer
XIIIth Plan 2019-20 Ayyampuzha Grama Panchayath - Substation Thuruth Road Concreting (159/20)- Multiyear
Civil construction of new control room building for 110kV Substation, Ponnani
Road work with Paver block at Wadakkanchery