Supplying and Drawing 11kV covered conductor from 33kV substation,parappur to Mavinchuvadu by dismantling ACSR conductor in connection with the construction of 33kV Parappur-Mullassery interlinking line.
Constructing 4.5Km 11KV HT LINE AND LAYING 150MTR UG CABLE FOR AN INDEPENDENT FEEDER FROM KARUVATTA SUBSTATION TO THAMALLACKAL ALONG NH under Ele.section, HARIPAD - Work code 552434112000113
TWSS- Urgent leak arresting and oil filtration of 2000KVA 11/3.3KV transformer No 2 and oil filtration of 2000KVA 11/3.3KV Transformer No1 at 86MLD substation - Aruvikkara
Custom Bid for Services - Deploying Electrical supervisor, Custom Bid for Services - Deploying Substation incharges, Custom Bid for Services - Deploying Electricians, Custom Bid for Services - Deploying Instrumentation Technician
Standardize and regularize the DG cable at MSB 3 to MSB 1 and MSB 4 to MSB 2 in the Substation No1 and 2 in the Campus
Laying of 4.75km (2 x 2.3) 11kV, 3 x 300 sq.mm XLPE armoured UG cable from 66kV Substation, Odakkali to Odakkali Star Junction under Electrical Section, Kuruppampady
Construction,testing and commissioning of 2.5 KM HT ABC feeder from 110 KV substation, Vaikom to Vadakkenada including pole erection on partial turn key basis under IPDS.
1 Electrification 2 160 KVA Unitised Outdoor Substation 3 SITC of 58.5 KVA DG Set 4 Electrical Fire Fighting Work 5 Electrical AC Work 6 SITC of UPS
Idamalayar HEP - Construction of Communication room in the Idamalayar PH in connection with the project Reliable Communication and Data Acquisition to all substation and above 110 kV level
Earth work in excavation of all kind of soil PCC RCC Centering shuttering Survey of the proposed cable route cable laying preparation of final cable route HDD Laying of 33kV XLPE UG cable DP an isolator erection stringing earthing mate
Earthwork excavation Dry Rubble without concrete providing weep holes Centering and shuttering PCC RCC Dry stone pitching
Supply of 110kV oil filled out door termination with composite insulator, supply of three phase link box with SVL, supply of three phase link box without SVL, cable laying and end termination works
demolishing brick work demolishing rcc providing GI sheets Steel work in builtup tubular section Pre coated galvanised steel sheet roof Painting with synthetic enmel paint
Road maintenance
road
Supply of 11 kV Load Break Switch panels
Supplying drawing testing and commisioning of 4 KM HT ABC of size 3x120 sqmm 1x95 sq mm on existing PSC/A Pole support for alternate supply to Konni area under Dyuthi Project at Section Konni of Electrical Sub Division Pathanamthitta on turnkey basis
3 year Operation and maintenance activities of solar plant at Kanjikkode
Providing paver blocks, steel work with GI, fly proof wire gauze to windows, providing plain GS sheet, post,strut , GI chain link fabric fencing, vinyl flooring, water proof cement paint, fire retardant paint, solid block masonry dismantling GIpipe
Metal spreading ,providing Chain link fencing and other allied works for the newly extended 110 kv yrad as a part of transgrid downstream work at 220 kv substation ,mylatty .
Supplying Hardware fittings suitable for AL59 conductor for the Construction of 11.18 km 110 kV Double Circuit line to proposed 110kV Substation Kuttikkol under Transmission Circle Kannur Manufacturers only
Erection of poles for Drawing 11kv ABC cable from KSRTC junction to Mrala, Substation to Anjapra, Nelcos to Arackkapara, and Parakkadavu to TV relay under Electrical Section No.I Thodupuzha
Cutting available trees in the ROW of 110kV line, removing and stacking outside the ROW
RETARRING, EDGE CONCRETING AND TARRING WORKS
Tree cutting along the line route, cutting of trunks and branches and stacking.
Erection and control wiring of 20MVA transformer
SUPPLYING, DRAWING TESTING AND COMMISSIONING, OF HT ABC, POLE ERRECTION
Transgrid 2.0 project - Erection of 10 nos 13 mtr A pole, Erection of 50W LED flood light and fabrication of flood light fixture fixing arrangement at 220kV GIS substation, Ettumanoor
Construction of toilet block in the substation compound , renovation of the control room toilet block with addition of a ladies toilet, chequerred precast cement concrete tile flooring of vehicle shed
Laying of 7 Km of 3x300sqmm XLPE UG cable Drawing of 3 nos 11kV feeders from 110 kV Infopark substation , Pallippuram to KSIDC Megafood park at Industrial Growth Centre, Pallippuram.
SDRF-CPP-MRBC-Rectification and Renovation of traditional anas and canal system of Korayar river in Kozhinjampara panchayath-between Angarath system originating from Angarath check dam from karakarakkulam to KSEB substation.
Site Development, Indoor Stadium, Swimming pool, Natural Football Turf, Maple wood, Hostel Building, Sump, Pump Room, Filter tank, storage tank, filtration, Flood lighting, Sprinkler system, Fire Protection, Substation, Septic tank, Electrification
Drawing HT ABC duplicate feeder for 4.5 Km from Vaikom Substation to Nanadom via Nakkamthuruthu and for 0.4km from Lenin thuruthu to Kattikkunnu under Electrical Section, Chempu on TURN KEY basis
Transportation of 2Nos 120MVA Transformers main body from TELK Angamally to M/s.Megha Engineering and Infra Structures Ltd for their 400KV Substation of TSTRANSCO Tippapur Ellantakunta Mandal Sircilla District Telangana State
Cutting and clearing of jungle growth and Tree/ Branches in the right of way along the line route of 66kV Vandiperiyar- Kochupamba SC feeder including the LILO portion to 66kV Substation, Vandiperiyar
66 kV Vandiperiyar_Kochupampa SC feeder _ Cutting and clearing thick and thorny jungle growth along 66 kV Vandiperiyar _ Kochupampa SC feeder including the LILO portion to 66 kV Substation Vandiperiyar under LMS Moozhiyar
Renovation of 110kV Substation Kaloor Midterm proposal for Shifting of Control Panels and associated equipments to top floor of control room SCADA reinstating work of all panels in connection with flood mitigation
Supplying 11 kV ,630A LBS for 11 kV outgoing feeders for the work of upgradation of 33 kV Substation Pariyaram to 110 kV level under Transmission construction Section Taliparamba under Transmission Division Kannur
Dismantling 33 kV line from 110 KV Substation cherpu to Godown AB Peroorkkara including dismantling Lattice (25 Nos) and A type Pole (40 Nos) and dismantling 5.1 km Line at Kole paddy field
Construction and Commissioning of 100 MLD Water Treatment Plant at Peruvannamuzhi Floating Intake Structure Raw Water Pumpsets Raw Water Pumping Main Transformers Substation and Clear Water Transmission Main from WTP to Various Reservoirs
from 110 KV Substation Edayar to FACT Pathalam road near TCC shopping complex under Electrical Section Eloor and UG cable portion in front of FACT South gate portion 50 metres of Eloor feeder.
Earth work Excavation and construction of Foundation of LBS, cable trench, earthmat work Loading, unloading and placing of pre cast concrete cover slabs etc.
Pro No - 68-20
demolishing rcc brick stone rubble earthwork excavation quarry muck filling driving teak piles PCC rcc steel reinforcement plastering spreading
C/o Administrative Building for CRCK, NIEPMD including internal sanitary Installations, Water supply, Drainage, Internal roads, storm water drain, 2 Nos Septic tank, 2 Nos UG sump, Compound wall, Gate and Security cabin, Internal Electrical ... Unitized substation , ...
Construction of 15kM 110kV Piravom Koothattukulam DC feeder with ACSR Wolf conductor by LILO ing the existing 110kV Marady Koothattukulam feeder to 110kV Piravom Substation - Conducting detailed Soil investigation prior to prepare the estimate
JICA Assisted-Rehabilitation of Water Supply Scheme to TVPM Cityregion-Package-5-Commissioning of 11KV substation at Aruvikkara and Vellayambalam and Energization of the Electrical equipments installed at chemical houses,chlorine building,pump houses
Design, Manufacturing ,Testing and Supply of 6 Sets of Pantograph Isolator with structure for the use at 220kV Substation, Brahmapuram in connection with replacement of 220kV Ambalamughal -Brahmapuram overhead transmission line passing through BPCL
Erection of GI yard structures, erection of all bay equipment, stringing of 110kV Bus and earth wire, earthing of equipment and supporting works