Loading…
Loading…
2,890 results • Best match
Standardization for drawing HT ABC from 110 KV SS Kurumasserry
Laying of 11 kV 3C x 300 mm2 UG Cable by HDD method including supplying and pulling of 110 mm HDPE pipe duct with all accessories cost of all material ,labour, conveyance charges and submission of final profile drawing 1.236 km
DRAWING 4 KM HT 11 KV ABC
RESURFACING OF ROAD BY PREPERATION AND CONSOLIDATION OF SUBGRADE WOTH POWER ROAD ROLLER ,SPREDING WMM,PROVIDING TACKCOAT OVER PREMIXED BITUMINOUS CARPETING.
RE ROUTING PUZHAKKATTIRI FEEDER FROM VEGETATED AREA TO ROAD BY USING UG CABLE
ConstructionofVBKasaragod interior partition works and supplying and fixing of office furniture
Laying of 11kV UG cable for power evacuation arrangement at Peppara Power House
Proposed 110kV Switching Cum Substation, Panthalacode - Construction of Foundation of Yard Structures and Equipments, Cable Trench etc and related Works
Construction for Equipment Foundation for Transformer bay in connection with installation of 220/33kV 50MVA Transformer at 220kV Substation, Kaniyambetta
Part-2 Drawing Covered Conductor from Viyyur Substation to Chembissery Palam for Ayyanthole and Puzhakkal feeders under Electrical Section, Ayyanthole
Replacement of existing old Megawin make 11kV panel set with new Alind make 11kV panel set at 220kV Substation, Edamon
SITE LEVELLING,TRANSPORTATION OF EARTH AND CONSTRUCTION OF RETAINING WALL FOR THE UP GRADATION OF 66kV SUBSTATION GANDHINAGAR TO 110kV
Bay extension works at 110kV Substation, Paruthippara- Yard metalling, providing fencing and revetment construction around the newly constructed 110kV bays
Construction of new Electrical Subdivision Cum Electrical section building, Kattoor at 110 kV Substation premises Kattoor under Electrical Division Irinjalakuda.
Construction of 2.75 KM 11 KV Line from Kallara Substation to Anachamkuzhy DP under SI Scheme of Electrical Section Thalayazham.
1. Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 7.5 kilometer 2. Erecting DOUBLE POLE structure with AB SWITCH using A pole - 5 each 3.Construction of 11kV line using ACSR RACCOON using A pole -0.150 kilometer
Replacing OH line with covered conductor
Earthwork excavation compaction of earth Dry rubble masonry Random rubble masonry Providing weep holes PCC RCC Centering and shuttering Steel reinforcement Structural steel work Plastering Filling with contractors own earth Filling etc
Earthwork excavation Random rubble masonry PCC RCC Centering and shuttering filling earth Laterite masonry Aluminum work Plastering Painting sanitary works etc
Earth work excavation ,Providing specified grade RCC for foundation, side wall and cover slab, provision for centering, shuttering, steel reinforcement ,plastering works,Provision to strengthen the existing drainage providing PVC pipe with concrete
The provision included in the estimate are Painting Enamel painting truss work False ceiling work windows aluminium work Plumbing line repair FRP Doors etc
Modification of existing quarters building and meeting hall
Supply of 7 nos of Outdoor 11 kV Ring Main Unit CC (gcg), with Two Isolators motorised with Battery charger, earth switches and SCADA compatible, for the use at various Substations under Transmission Circle Trivandrum
Construction of 110kv substation Vazhoor Supply erection and commisioning of Highmast LED lighting system and tubular poles for yard lighting work
SHIFTING OF HT AND LT POLES FOR ROAD WIDENING FROM 33 KV SUBSTATION NILESHWAR TO CONVENT JUNCTION UNDER ELECTRICAL SECTION, NILESHWAR
Construction of access road to control room and arrangement for drain in from of control room at 33 kV Substation Thazhekode
Construction of new building for accommodating Electrical Sub Division and Section Offices, Kanjirapally at Kanjirapally Substation Compound, under Electrical Circle, Pala.
Supply , dismantling, Erection ,Installation , Testing and commissioning of 145 KV SF6 gas Circuit Breaker at our outdoor substation on turnkey basis
Construction of Retaining wall and yard metalling at 11 kV Yard behind 11 kV control room at 220 kV Substation, Pothencode
Bay Control Unit PCB Membrane Keypad (Q3), Substation Merging Unit PCB Membrane Keypad (Q3), Smart Digital IO PCB Membrane Keypad (Q3)
Constructing 3.85KM 3.5KM fresh line and 350M drawing on existing poles from 33KV Substation Manimala to Kadoorkadavu under Electrical Section Vaipur
Providing GI tubular structure for support for GI sheet roofing providing GI sheet roofing and its accessories, Fixing the all columns on the ground firmly by providing concrete, and painting all metallic parts with synthetic enamel paint
The important items included in the estimate are repairs to plasteing works on walls and ceiling
Construction of 33 kV DC line from Ongichira to Thumboor.
This estimate is proposed for drawing HT ABC from 110kV S/s, Guruvayur to Ardra palli road transformer to interlink the newly proposed Chowallur padi feeder with Guruvayur feeder.
Foundation, Equipment and Structure Erection, Control Wiring, Yard Metalling, Fencing and Yard Lighting
O/o Chief Executive Officer,Ground floor,Kinfra Common Facility Building, KEPIP, kakkanad
footpath concrete
Assembling 20MVA Telk and Atlanta Make transformers and Power Cable laying works
Erection of 110kv Current Transformer ,Potential transformer Circuit Breaker ,Isolator ,,13mtr column and 10 mtr beam yard structure for bus extension including laying of control cable with termination for above equipement
110kV Substation Adimaly - Construction of equipment and yard structure foundations, cable trench and erection of yard structures etc for new 110kV bays
Supplying,laying,termination,testing and commissioning of 132kV single core 630mm2 aluminium conductor XLPE insulated UG cable at 110kV GIS Substation Vennakkara
DRAWAL OF UG CABLE AT 110KV SUBSTATION VADAKARA TO NALOM VAYAL FOR 11KV CHORODE AND MUTTUNGAL FEEDER UNDER ELECTRICAL SECTION VADAKARA NORTH
PROVIDING DEDICATED 11 KV FEEDER FOR KWA FROM PALODE SUBSTATION TO ARUVIPURAM BY LAYING 3X300mm2 UG CABLE ( TOTAL 17.6km) under Ele.section, Kallara
Converting 11kV OH to UG Cable of Chempumukku and Vazhakkala feeder from Kakkanad Substation under Ele. Sec. Thrikkkara West. (Electrical Division, Thripunithura)
Replacing 110kV pneumatic CB of EMPN feeder and 66kV CB of KLEM no.2 feeder with new one at 220kV Substation, Edamon
Construction of 2.70 km of HT ABC line from 220 kV Punnapra Substation up to Superspeciality Block T D Medical College Vandanam
Drawing covered conductor through existing Keltron feeder from Poomala Substation to Keltron Cable AB and also dismantling ACSR conductor under Ele.section, Mulamkunnathukavu.
Civil Renovation works, furnishing, Internal Electrification, MEP, Lift System, DG set, Networking, HVAC, ELV Systems, Street Lighting, Substation and connected electrics etc.
Constructing 11 kV feeders for power evacuation from the newly constructed 110 KV substation, Muttom under ES Moolamattom on system Improvement basis