Laying 2.2 km 11kV Under Ground cable throug NH road from 110kV Adimaly Substation to Adimaly Town Mosque under Electrical Section Chithirapuram.
Establishment of Referral Analytical and Diagnostic Laboratory for supporting livestock farming and diagnosis of Zoonotic diseases at COVAS, Mannuthy, Trichur for Kerala Veterinary and Animal Science University (KVASU),Kerala. SH: Construction of ... Electrical substation building ...
Construction of 11 kV UG Cable from Marady S/S to Muvattupuzha
Laying of 11 kV 3C x 300 sq mm UG Cable by HDD method including supplying and pulling of 125 mm HDPE pipe duct with all accessories, cost of all materials ,labour, conveyance charges and submission of final profile drawing -6.1 km
SIDE WALL
Construction of earthmat, laying and connecting GI strips to structures, construction of cable trenches, fabrication and fixing of cable trays, construction of drainage and retaining wall.
Fabrication of frame for Chain link mesh . Welding,erecting Chain link mesh size 50x50mm with 4mm GI wire to the Fabricated rectangular frame. Construction of fencing curb wall. Erecting departmentally supplied fencing, stub/post.
Drawing ABC cable of 5.65 kms
Drawing covered conductor through existing Pullu and Panthode double circuit feeder from Substation to Kanjani centre by dismantling ACSR conductor under Ele.section, Kandassankadavu.
Selection of consultant for providing Architectual and Engineering services for the construction of Backup Load Dispatch Centre at 220kV substation premises Pothencode Thiruvananthapuram
CONSTRUCTING HT ABC FOR A NEW FEEDER FROM KATTANAM SUBSTATION TO KOPPRPPURA (P 1) ABC under Electrical section Kayamkulam East Work code 553134111900266
Construction of Security Compound Wall and filling up of land transferred for bay extension at 110 kV Substation, Kazhakuttom for Technopark Phase III
Jungle clearance from loc 1 to 14 Loc 29 to 58 of 66kV Kochupampa-Vandiperiyar and SC feeder from ManjumalaTap to Peerumedu Substation
Providing GI sheet roofing over existing roof of IB (guest house) including necessary civil maintenance of IB building inside 220kV Substation, Mylatty compound.
Construction of new office building for accomodating Electrical Sub Division and Section Office Veliyam at the 33KV Substation compound at Pooyapally,Kollam Dist
Resurfacing the road with pre-mix bituminous surfacing and Providing gate and interlocking cement concrete at entrance of yard
SOP TO THE DIRECTOR ZOOLOGICAL PARK PUTHUR PART II-DRAWING 1.65 KM HT ABC ON TURNKEY BASIS under Electrical Section Puthur
CONSTRUCTION OF A NEW BUILDING FOR ELECTRICAL SECTION OFFICE AT AGALI
STRINGING HT ABC
-TC Section Koothumunda- Erection of 110kV Equipments, Bus bar stringing and Earthing in conection with the upgradation of 66kV substation kuthumunda to 110kV level .
Construction of new building for accommodating Electrical Sub Division and Section Offices, Ramapuram at Ramapuram Substation Compound, under Electrical Circle, Pala, Kottavam Dist, Kerala.
Upgradation of 66 KV Substation Kuthumunda to 110 KV. - Construction of control cable, power cable trenches and construction of cover slab covering cable trenches
JAL JEEVAN MISSION -KASARAGOD DISTRICT -KINANOOR KARINTHALAM PANCHAYATH - CONSTRUCTION OF INTAKE WELL CUM PUMP HOUSE, SUBSTATION BUILDING, RETAINING WALL AND RAW WATER PUMPING MAIN
CONSTRUCTION OF NEW 11 kV FEEDER (2.95 KM OH AND 0.15 KM UGC) FROM 110 kV SUBSTATION VAIKOM TO MANAKUNNAM UNDER ELECTRICAL SECTION , THALAYOLAPARAMBU
Construction of 110kV Substation Panthalacode-Earth cutting and levelling for yard and road formation,construction of security compound wall,retaining wall and allied works.
Construction of 110 kV Substation Thiruvaly. Erection of HT and Control Panel, HT and Control Cable laying and allied termination works including DP erection
Providing temporary 110/11kV supply arrangement at proposed land for 220kV GIS substation Vengallur-Erection of Yard equipment, Installation of control and relay panels
Constructing 11 kV feeder by using HT ABC from 220 kV substation Poovanthuruthuto CM Division Pallom- Drawing of HT ABC, under Electrical Section, Pallom
Concrete work , DR work
33KV UG cable laying with HDD method
LAYING HT ABC CABLE, UG CABLE, HT LINE CONSTRUCTION ETC.,
erection of grider power equipment including structure of 33Kv bus isolator CB CT LA PT Bus coupler isolator Earthing of this equipment using GI strip and providing riser and auxiliary mat using 25mm MS rod CR panel erection con
Construction of power cable trench from new control room to new 11kV DP Yard for laying 11kV and 33kV power cables at 110kV substation Kunnamangalam.
Disposal of excess earth to be cut and removed from the site of proposed 110 kV Substation, Panthalacode for yard formation under Transmission Circle, Thiruvananthapuram
INSERTING POLES FOR DRAWING HT ABC FOR A NEW FEEDER FROM KATTANAM SUBSTATION TO KOPRAPPURA STRENGTHENING PART under Electrical section Kayamkulam East Work code 553134111900283
Site levelling and construction of compound wall In the proposed site for the construction of new unmanned substation at wind farm area at NIDA, Kanjikode
Cutting and clearing thick thorny and light jungle growth along 66kV Vandiperiyar Kochupampa SC feeder including LILO portion to 66kV Substation Vandipperiyar under LMS Moozhiyar
Errection of poles for drawing 11KV ABC from 33KV Substation RannyPerunad to Athikayam on DDUGJY Scheme in Electrical Section Ranny-Perunad under Electrical Division Pathanamthitta
Construction of 2 nos of 66/33KV 20MVA transformer bays at Pallivasal power house for the energisation of 33KV Substaion Marayoor
road work
General Electrical Work
DEPOSIT-(24-25) - WSS to Mananthavadi, Edavakka and Naloornadu villages-Pipeline extenstion to Substation Vadakke and Kuruvikkattu area in Mananthavady(M)(Prj No 251)-Pipeline Work
Strengthening of KSEB infrastructure in connection with the work of drawing dedicated feeder using HT ABC from 110 kV Substation Cherpu to Karottumury (Palakkadavu) Pump house.
Construction of yard structure and equipment foundations in the proposed site for the new unmanned 110/22kV AI substation at Wind Farm area in NIDA Kanjikode
Additional pole insertion and allied works in connection with drawl of 13.75Km HT ABC from Koyilandy Substation to Harbour under ES Koyilandy North under ED Vatakara
Drawing 4.5 km 11 kV ABC through existing 11 kV line from 66 kV Substation Kuruvilangad to Kanakkancherry after inserting H.T poles under Electrical section Peruva
Selection of Renewable Power Generators through tariff based bidding for setting up of 0.5 MW to 2 MW (AC) aggregating to total 40 MW capacity on the land of farmers falling within a radius of 5 KM from the substations of KSEBL
Replacement of existing ODC panel with new panel in control room including laying of HT UG cables and associated works
Laying earth mat
Road works