2,890 results • Best match
Earthwork excavation PCC RCC 1 1.5 3 Centering shuttering Steel reinforcement Laterite Masonry Brick work Plastering Structural steel work Filling placing of cover slab
Design, Manufacture, Supply, Installation, Testing and Commissioning of 110 V, 120 A FCFCBC charger suitable for 110 V, 400 Ah PLANTE type Lead acid battery including transportation charges, insurance and all accessories related to battery charger
Four feeders. The 1st 400m of 4 cables to be laid in single open trench. BSNL, Vayanthode, Keezhedath feeders are then laid using HDD for 1010m, 1890m and 1200m respectively. College feeder to be terminated on existing DP. New DPs for other feeders.
Refer tender details
Emergency electrical Maintenance works
Pole Insertion for drawing HT ABC from Punnayoorkulam Substation to Thengilapally area under Electrical section Changaramkulam section
Design , Manufacture and supply of 110 kV Horizontal double break springless motorized line isolators for CIAL substation
Laying, testing and commissioning of 3.15km 11kV XLPE UG cable from Vydyuthibhavanam Substation to Overbridge BOC Road
Constructing New room for Assistant Engineer and providing truss work at Control room at 66KV substation, Triveni.
Supply of cable for providing spare arrangement for 315 MVA third bank transformer at 400kV Substation,Madakkathara.
Drawing covered conductor through existing Palazhy feeder from Substation by dismantling ACSR conductor under Ele. Section, Kandassankadavu.
Drawing HT ABC from Rayonpuram substation to Kariyeli and to Vattakattupady under IPDS under Electrical section Perumbavoor
Construction of IT Building (Phase-2) in SEZ at KINFRA Film and Video Park, Kazhkuttom including Internal Electrical Installations, External Services, Roads, Rain water Harvesting, UG Sump, OH Tank, Drains, Pump Room, Substation, DG Set, FireFighting System, Automatic Fire Alarm System, Lift, HVAC, Grid Interactive Solar PV power Generation System etc. SH. Providing Office Assistance. Subwork/Packages: Single
Detailed profile survey,preparation of tower schedule,Tower spotting, stone laying,grass clearance etc
Road protection work
Stringing of 11 kV Aerial bunched cable 6500mts Fitting and erecting one HT DP using A type pole 2 Nos Renewal of HT PSC pole with A pole and Fitting and errecting DP 2Nos
Insertion /Errection of Poles in existing HT/LT lines for drawing ABC from Charis to Perumattom 4 Pole
.The work includes Surface dressing of the ground including removing vegetation and inequalities, Supplying and stacking hard blue granite broken stone 6 mm and 40mm at site, Spreading including transportation.
Network switch
LAYING OF 11 KV XLPE UG CABLE OF SIZE 3X300 SQ.MM
Earth work in excavation . Laterite rubble masonry foundation and basement. Plastering with cement mortar on top of the masonry.Providing beep holes by using 63 mm PVC pipe for better drainage of water.
It is proposed to carry out the urgent repairs for the broken plumbing and sanitary pipes and fittings repair works to the existing doors and windows etc as and when required
Supplying one Tata Sumo/Qualis/Tavera/Equivalent vehicle with driver for the jointly use of Switchyard Maintenance Sub Division and SGE Sub Division at Sabarigiri HEP, Moozhiyar for one year
Water proofing work for the RCC roof top of control room building of 66kV GIS Substation LA Complex
Upgradation of 66 kV Substation,Nenmara to 110 kV -- Erection of yard equipments, Transformers and Laying of Powercables
Procurement of 11 KV 7 PANEL SWITCH BOARD with SF6/ Vacuum circuit breaker for Reservoir pump house substation
O and M work Painting of 220kV yard fencing and lower yard retaining wall at 220kv substation Edamon
Supply of Hard ware fittings for the construction of 4 Nos 110kV feeder bays at 110kV Substation Vaikom
Retender of Payyannur BP Flood relief 2020-21 improvement works to Kankole Substation Road in Kankol Alappadamba GP
Standardisation of 110kV Bus and feeder bays Site levelling and construction of retaining wall at 110kV Substation Kizhissery
Water proofing work for the RCC roof top of control room building of 66kV GIS Substation, Power house.
IPDS work for drawing 5 Kms HT ABC from Trikkakara Substation to Edappaly Toll, under Electrical Section, Thevakkal.
11kV 3x300sqmm XLPE UG cable laying by HDD method
IHEP Upkeep and Maintenance of Moolamattom Colony Jungle clearance at Moolamattom colony, Switchyard, PH entrance, Tailrace channel area for the year 2024-25 Phase II (from January 2025 to March 2025)
IHEP-Upkeep and Maintenance of Moolamattom Colony- Jungle clearance at Moolamattom colony, Switchyard, PH entrance, Tailrace channel area for the year 2024-25- Ist phase (from June 2024 to August 2024)
Repalcement of deterirated barbed wire fencing and Y angles over the compound wall surrounding the 220 kv substation ,mylatty
Yard metaling and fencing at newly constructed Manathavady bay in connection with the Up-gradation of 220kV substation Kaniyambetta
Works includes the laying of LT cables from substation LT panel to PoPs locations, associated electrical and Civil works
Providing 110 kV supply to Indian Railway from 110 kV Substation Melattur Site development for 110 kV feeder bays
construction of a rubble retaining wall at the side of the entrance road of 220kV substation(gate 2) Edamon
110 kV Substation Thycattusery Supplying ,laying and Termination of 0.72 kM (3x.24km) 110 KV ,1x630 mm2 XLPE CABLE
Upgradation of 66kV Substation Kuthumunda to 110kV Standard- Lower yard fencing, Remetalling, Yard metalling and Fencing of 11kV Yard
1.Construction of 11kV line using ACSR RACCOON using A pole- 0.1 km 2.Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 4.5 km
Replacement of 11 KV UG Cable and Provision of 11 KV RMU
Construction of BCC room
Construction of 11kV line using ACSR RACCOON using A pole - 1.7 km
The work includes Earth work excavation for foundations, and for laying earth strips. Providing specified grade RCC for foundations including provision for centering, shuttering, steel reinforcement and plastering and backfilling.
CIVIL MAINTENACE WORKS INCLUDING PAINTING
Earthwork excavation Supply and filling quarry muck PCC Centering and shuttering RCC steel reinforcement lifting and loading RCC slabs filling earth fixing foundation bolts plastering structural steel work
1.Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured-7.7 km , 2. Erecting DOUBLE POLE structure with AB SWITCH using A pole - 3 Nos. 3. Construction of 11kV line using ACSR RACCOON using A pole - 1.1 km