Loading…
Loading…
1,924 results • Best match
Regular maintenance of the lawns, hedge plants, Korean grass on West side of approach road leading to switchyard 1
Regular maintenance of the lawns, hedge plants, Korean grass on West side of approach road leading to Switchyard 1
Supply and application of Si coat 570 RTV silicon coating on 110 KV switchyard equipment insulator at HWP, Tuticorin.
Regular maintenance of the lawns, hedge plants, Korean grass on West side of approach road leading to switchyard 1
RATE CONTRACT FORErection, Maintenance and Dismantling of electrical networks (OH Line and UG Cable) including Sub-stations maintenance in Pallavaram Subdivision of Tambaram division for a period of six months.
Specification for engaging of experienced network service personal for maintaining hardware, software and VPN connectivity for all offices and Sub-stations under Annual Contract through K2 Agreement for the Nagappattinam EDC -04 Persons
TERM CONTRACT FOR ARTIFICERS WORKS IN MES INSTALLATIONS SUCH AS PUMP HOUSES, GENERATOR ROOMS, UG SUMPS AND SUB STATIONS FOR B/R WORKS IN ZONE B AND E AREA UNDER GE CHENNAI
Replacement of LT panel boards at the Substation of NIWE, Pallikaranai, Chennai Lifting of Transformers DG sets, Panel boards at Substation of NIWE Pallikaranai Chennai
Custom Bid for Services - Shifting of HT panels from MHD substation and erection at 1A4 Substation at BHEL Trichy Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
TTPS ES Circle EM III Maintenance of 360V UPS batteries 220V DC batteries 24V DC batteries in Unit IV and V 220 V DC batteries in Indoor Switchyard II and 48V DC CC batteries in Indoor Switchyard II for the period from 08.10.22 to 31.03.22
TTPS ES Circle EM III Maintenance of 360V UPS Batteries 220V DC Batteries 24V DC Batteries in Unit IV V 220V DC Batteries in Switchyard II and 48V DC CC Batteries in switchyard II for the period from 01 04 2026 to 31 03 2027
cleaning of equipments of PH and switchyard and carrying out all other works as per the instruction of Engineer in-charge at PUSHEPH in Kundah GC under works contract through outside agency for 7 months i.e 210 days
Replacement of 110 KV Busbar protection panel and Laying of 700 mtrs 8X2.5 Sq. mm armoured copper current transformer cable ,100mtrs 12 x 1.5 Sq.mm Feedback Cable at 110 KV Switch yard Valuthur Gas Turbine Power Station/Phase-I
NCTPS II Civil Maintenance Circle Civil Maintenance Division Regular maintenance of 400KV and 230KV switch yard outer areas by clearing the weed growth in metal spreading area cleaning the roads storm water drains clearing the jungles on vacant land
NCTPS II Civil Maintenance Circle Civil Maintenance Division Regular maintenance of 400KV and 230KV switch yard outer areas by clearing the weed growth in metal spreading area, cleaning the roads storm water drains clearing the jungles on vacant l
NCTPS I ES Circle EMI Division S Dn Time Bound programme for Routine Breakdown maintenance works of 230KV Indoor Switch yard Power Transformer Service Transformer and DG sets of Sub division I of EM I division at NCTPS I
MTPS I Mill Plant Unit I and II Clearing the Mill rejects from Unit I and II Mill Feeder area weighing in departmental weighbridge and Transporting to rejects yard G switch yard area coal yard by using contractors vehicle
NCTPS II Civil Maintenance Circle Civil Maintenance Division Sweeping the floors Cleaning the partitions doors windows removal of cobwebs at Switch yard control room, 230KV 400KV GIS Buildings for the period of One year from 01.04.2025 or from the
Inspection cleaning tightness checking of strung bus under hung bus bar insulators and wall through Bushing C T to make insulators healthy and to avoid carona discharge in 230 KV Indoor Switch yard II for the year 2020 21
Maintenance of 11kV Substation Equipment
Establishment of 11KV/433 v Substation at Kamarajar Port Limited
Retrofitting works at Substation buildings Phase 3 in Kalpkakkam Township.
Electrification of new building for Electrical substation in SS-11
Rate contract for Erection, maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Selaiyur Subdivision of Tambaram division for a period of six months
Rate contract for Erection, maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Tambaram Subdivision of Tambaram division for a period of six months
Rate contract for Erection, maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Medavakkam Subdivision of Tambaram division for a period of six months
Erection, Maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Kadapperi Sub division of Tambaram division for the period of Contract ending on 31.03.22
rate contract for Erection, Maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Tharamani Subdivision of Adyar division for a period of six months.
Rate contract for Erection, maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Pallavaram Subdivision of Tambaram division for a period of six months
Rate contract for Erection, Maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Pammal Subdivision of Tambaram division for a period of six months
Rate contract for Erection, Maintenance and Dismantling of electrical networks (OH Line and Cable) including Sub-stations maintenance in Kadapperi Subdivision of Tambaram division for a period of six months.
Construction of cable trench at 230 kv Villupuram Auto SS.
Disposal of scrap and condemned materials available at UEDC Udumalpet
Works for laying of various size of cables at various locations inside the cable trench including glanding and termination for 110 kv Capacitor Bank 1 and 2 and its allied equipments at 230 kv Auto ss Villupuram
works contract for laying of various size of cables at various locations inside the cable trench including glanding and termination for 230 kv Tiruvannamalai feeder and its allied equipments at 230 kv Auto SS villupuram.
works for laying of various size of control cables at various locations inside the cable trench including glanding and terminationfor 230 kv Cuddalore feeder and its allied Equipments at 230 kv Auto SS Villupuram.
Works contract for laying of various size of control cables at various locations inside the cable trench including glanding and termination of 230 kv Bus coupler and its allied equipments at 230 kv Auto SS villupuram.
works for laying of various size of cables at various locations inside the cabletrench glanding and termination for 110 kv Acharapakam2 ThayanurTirukoilur feeders and its allied equipments at 230kv Villupuram Auto SS
SUPPLY OF MAN POWER TO 230KV ARASUR SS
Maintenance of 360V UPS batteries 220V and 24V DC batteries in Unit IV and V 220 V DC batteries in Indoor Switchyard II and 48V DC CC batteries in Indoor Switchyard II for the period from the date of commencement of work upto 31 03 2022
Rate Contract for periodical servicing and refilling of fire extinguishers for 24 Nos.33 KV sub stations, Central Store, sub stores,Central Office buildings, other office buildings etc., in Vellore Elecy. Distn. Circle
TERM CONTRACT FOR ARTIFICERS WORKS IN MES INSTALLATIONS SUCH AS PUMP HOUSES GENERATOR ROOMS UG SUMPS AND SUB STATIONS FOR B and R WORKS IN ZONE B and E AREA UNDER GE CHENNAI
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance works to the Switchyard control building in NCTPS II
Clearing the Scrub Jungle in the Cable Tray West side and East side of Switchyard 2 Building in Unit 5
Clearing the Scrub Jungle in the Cable Tray West and East side of Switchyard 2 building in Unit 5 area
Extension of road arrangements from Tirupur 230 KV SS fencing to the end of Tirupur 110/11 KV Sub Station yard in Kumar Nagar EB Campus
Repair and Maintenance of the Andichettipalayam 110 /33/11KV Sub station by providing precast RCC cover slab for the cable trenches etc at Andichettipalayam in Karur
O and M of Electrical System in Main Power Station (MPS) and Construction Power Supply Substations (CPSS- 1,2,3,4) at FRFCF, Kalpakkam
Construction of RCC retaining wall to protect the proposed extension of the existing Switch Yard near Kodayar Power House I (Reach V) in view of the ongoing Renovation, Modernisation and uprating of the Kodayar PowerHouse I from 1x60MW to 1x70MW
Discharging and charging of 24V DC System Batteries 220V DC System Batteries and UPS System batteries of Unit IV and 220V DC Batteries at Switch Yard II Cleaning and Tightness Checking of charger panels during Unit IV overhauling for the year