Loading…
Loading…
262 results • Best match
Handling and Transport on Lumpsum Basis - Dismantling of 5 MVA ICT & placing it at a separate place via dragging/other means necessary
Manpower Outsourcing Services - Minimum wage - Skilled; AS PER SCOPE OF WORK; Others
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; BRAND NEW; BRAND NEW; A/C; AS PROVIDED IN TENDER DOCUMENT
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Electrical System or Installation; As mentioned in scope of work
Providing of down streams 11 KV connectivity line of 5(Five) feeders with partially turnkey basis from newly constructed Satchand 132 KV Substation in the jurisdiction ESD-Satchand under Sabroom Electrical Division, South Tripura.
Construction of HT LT line including construction of 63 KVA Substation for providing three phase service connection at DTW scheme of DWS Jal Jiban Mission at different locations of Electrical Circle no I II Khowai
Segregation of 22 (Twenty two) nos DTW schemes transformer from others Domestic consumers by construction of HT/LT line including sub-stations within the jurisdiction of Electrical Division- Khowai.
Extension of HT/LT line including 16x63 KVA Substation for 16 nos. DTW (DWS) Scheme i/c Innovative Scheme within the jurisdiction of Sabroom and Satchand Electrical Sub-Division under Sabroom Electrical Division, Manubazar, South Tripura.
Supply, erection and commissioning of DTW Scheme (05 Nos) by extension of 11 KV / LT line , HT line through UG cable in/c construction of 05x63 KVA Substation for providing new service connection to DTW Scheme
As per Bid Document
Brick Soling road from junction point Guest House to Colony SwitchYard at TGBPP NEEPCO Ltd Monarchak
Supply, erection and commissioning of DTW Scheme (04 Nos) by extension of 11 KV / LT line , HT line through UG cable and AB Cable in/c construction of 4x63 KVA Substation for providing new service connection to DTW Scheme of DWS Department under Bis
FDR of road from Bye pass (Near Railway over bridge) to 400KV SubStation via Kathaltali GP, Madhuban GP and Ranirkhamar Bazar (L_5point95 Km) during the year24_25_SH Patch Carpeting and allied works portion from ByePass to Kathaltali Market (L_1KM)
Construction of HT LT line including construction of 63 KVA SubStation for providing three phase service connection at DTW scheme of DWS (Jal Jiban Mission) at Different locations of Electrical Circle Dhalai Unakoti and North under different Distric
Transmission line Surge arrestor
SH. Construction of 6.16KM 11KV line by ACSR weasel, 13.68KM LT AB cable line (1..Phase / 3.. Phase) along with construction of 09(nine)nos. 25KVA distribution substation for providing service connection (1..Phase) to 376 nos DA.JGUA households
Supply of different ratings Station type Lightning/ Surge Arrester for protection of 02 (two) nos. 11 kV, 21 MW Generator of Unit No. 4 and 5 and 66/132 kV Switch-yard equipments under Gas Thermal Power Station, Baramura.
Supply, erection and commissioning of DTW Scheme (37 Nos) by extension of 11 KV / LT line in/c construction of 1x63 KVA Substation for providing new service connection to DTW Scheme of DWS Department under Bishalgarh, Charilam, Jampuijala and Dukli
Supply, erection and commissioning of DTW Scheme 32(Thirty two) by extension of 11 KV / LT line in/c construction of 32x63 KVA Substation for providing 3ph new service connection to DTW Scheme of DWS Department under Boxanagar, Kathalia, Mohanbhog
Supply, erection and commissioning of 07(seven) Nos DTW Scheme under WR department by extension of 11 KV / LT line in/c construction of 07x63 KVA Substation for providing new service connection to DTW Scheme of WR Department under tED-Bishalgarh
Underground sump water supply internal road storm water drains street/security light distribution system DG set substation UG cables for BSF Sephenjuri under SHQ Panisagar FTR HQ Tripura SH: Providing inspection vehicle for office of the Chief Engineer,CPWD Agartala.
Custom Bid for Services - Operation and Maintenance of Airfield Ground Lighting System 11 KV Substation and other E and M installations in Operational Area at MBB Airport Agartala 2026 to 2028 Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
1.0 Extension of HT/LT lines including Substations for providing 3-ph 4-wire permanent service connections at different DWS schemes
Underground sump water supply internal roads storm water drain street/Security light Distribution system DG set Substation UG cables for sephenjuri campus under SHQ BSF panisagar under FTR HQ Tripura.SH: Providing inspection vehicle for office of the Executive Engineer TCD-I CPWD Ushabazar.
Supply, Erection, Dismantling includng Civil works, Testing and Commissioning of 02 (two) nos. 72.5 KV, 2500A, 31.5 KA Outdoor SF6 Circuit Breaker for 66 KV Agartala Feeder and 66/132 KV, 30 MVA Auto Transformer at 66 KV Switch-Yard under GTPS, BRM
as per NIT
CO 02 nos Central morcha 04 Nos Corner Bunkers sentry post sarv Dharm Sthal Garage and POL store Electric substation Pump Room and Generator Shed and Dog kennel at BOP Labokantpara of 66 BN BSF under SHQ BSF Udaipur FTR HQ Tripura SH Electrical side
C/O 02NOS CENTRALMORCHA, 04 NOSCORNER BUNKER 02 NOS, 02 MEN BUNKER,SENTRY POST,SARVDHARMSTHAL,GARRAGE AND POL STORE ELECTRIC SUBSTATION, PUMP ROOM AND GENERATOR SHED AND DOG KENNEL AT BOP LATHIAPUR OF 55 BN (NOW 20 BN) BSF UNDER SHQ PSR(SH ELECTRICAL
as per NIT
As per Bid Document
Extension of 11 KV UG line incl construction of 11/0.433 KV 1X315 KVA RCC base mounted Distribution Sub stations for providing power supply to the Multistoried Complex namely Roodraksh Maatri and in the premises of Mr. Tanaji, 31 akhuara Road
as per NIT
As per tender document
Township Works Package-B for construction of Residential and Non-residential buildings including external infrastructural development in various substations of Tripura state associated with NER Power System Improvement Project
Repairing of foot track of various road and cable stayed RCC drain cover slabs inside the Plant area and 132KV Switchyard areas of TGBPS, NEEPCO Ltd, Monarchak, Tripura.
Clearing of Jungles, removing of vegetation at different locations surrounding Plant area, cable trenches, switchyard, office complex and quarter complex in 4 times during one year at GTPS, Baramura
CO underground sump water supply internal road storm water drain street security light distribution system electric connection feeder pillars substation UG cables DG sets with sheds etc.for Sephenjuri campus under SHQ BSF Panisagar Under FTR HQ SH: Providing inspection vehicle to the office of the Assistant Engineer TCSD-II TCD-I CPWD AGT 2 ND CALL.
As per Bid Document
Urgent Construction of RCC Retaining Wall at Charilam
Extension of 11 kV overhead UG line including substation for providing service connection at Babutilla Vidhyasagarpally Apanjan Club of AMRUT under ED II Bordowali
Construction of HTLT line along with 25 KVA distribution Substation for providing new service connection to Summit Digitel Infrastructure Pvt Ltd at Sushil ch Roy haripur shitaltali ESDAmtal
Substation Clamps/Connectors (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6449055 Dated : 21-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 137000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 22 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Finance Corporate Office Gurgaon, POWER GRID Corporation OF INDIA Limited, POWER GRID Corporation OF INDIA Limited, Ministry of Power (Dgm) Splitting 2/8
Bifurcation of existing transformers of DWS scheme by extension of HT LT line inc installation of 11X63 KVA Substation at Sandhi Sangha Ranir Khamar Pallan para Kismatkuri of ESD Amtali Kalitala Bazar Bagantilla Loknath Sani mandir Police para
Handling and Transport on Lumpsum Basis - Transport Service, Packing Loading and Transportation of rest of materials received for Extension works of 400 KV Surjamaninagar TSECL SS under NERSSXIV to be diverted to 400 KV Balipara Substation and Marian..
Supply, erection and commissioning of DTW Scheme (32Nos) by extension of 11 KV / LT line in/c construction of 1x63 KVA Substation for providing new service connection to DTW Scheme of DWS Department under Bishalgarh, Charilam, Jampuijala and Dukli
HT LT LINE MATERIALS
Supply, erection and commissioning of DTW Scheme (32 Nos) by extension of 11 KV / LT line , HT line through UG cable in/c construction of 1x63 KVA Substation for providing new service connection to DTW Scheme of DWS Department under Bisha
Engagement of 12 nos. Jr. Operator and 12 nos. Technical Assistant on temporary basis for the period from 15.10.2025 to 15.06.2026 for 03(three) nos. 33 11 KV Substation 1. Manughat, 2. Rupaichari and 3. Srinagar under ED-sabroom, South Trip
(SH - Consultancy service for soil investigation, preparation of details estimate, prepration of structural and working drawing and 3D views as the approved layout and digital /topographical survey.)