Loading…
Loading…
2,877 results • Best match
FOOT PATH CONSTRUCTION
Retarring and drain
RE CONDUCTORING WITH ABC
Re-conductoring with LT ABC
CIVIL WORK
ANNUAL PLAN - 2023 -24
Shifting relocating the existing electrical poles and lines at the north side of Vada canal from YMCA to Time square for the construction of new Dist court bridge
Electric work
As per tender documents
Side protection and tarring
Mavelikara Thekkekkara gp 2022-23.Vataparampil mukku Idakadavu Transformer junction road punarudharanam pr no.123.
RE-ROUTING OF 11KV LINE FROM SCHOOL TRANSFORMER TO NADHOM -2KM RACCOON under Ele.section, Thalayolaparampu.
Constructing 11kV line Edanad school to edanad temple and Pattettu transformer under Ele section Ramapuram
Installation of Transformer, HT Panel, LT Panels, Laying of LT, HT cables and Building Electrification
Drawing 4.95km HT ABC to 10Transformers and installing 100kVA transformer at Murikoli under ES Erattupetta
Supply of Test kit (Karl Fisher Test Kit) for measuring moisture content in transformer oil
Supply of DPC Aluminium Conductors and Strips for repair of transformer at TMR Division Angamaly
CONTROL PCB ED-99-13B WITH 110V OUTPUT, WELDING TRANSFORMER 42V, SAW CONTROLLER 110 PENDENT
HT and LT line construction Transformer errection, Line Reconductoring at various locations under ES, Neendoor
REPLACING OH WITH ABC OF ELANAD FEEDER FROM SUBSTATION TO MELAMKOL TRANSFORMER UNDER ES CHELAKKARA
Construction of 11kv - 1km, Installing 1 No 100kVA transformer, Construction of LT Sph line - 2km
Clearing touchings under ES Udayamperoor
Installation of 2 nos 110/33 kv, 16 MVA transformers at the proposed 110kV Sub station Thiruvaly - yard equipment foundation and erection for 110KV Substation
Constructing 5.75 KM 11 KV line, Installing 13 numbers 100 KVA transformers and Installing 10 numbers AB swiches under Electrical Section, Vaikom under IPDS scheme.
Re alignment of poles, lines and transformers as a part of road widening work of Muttungal-Nadapuram-Pakranthalam road under ES Muttungal under ED Vatakara
11KV Line From Manayathadam to Kaithapara 4 KM using PSC pole with Racoon conductor, Constructing 11 KV Transformer DP using PSC pole and installing 100 KVA Transformer, Constructing 4KM single phase 2 wire line at Kaithapara area
11KV Line From Makkuvally to Manayathadam 4 KM using PSC pole with Racoon conductor, Constructing 11 KV Transformer DP using PSC pole and installing 100 KVA Transformer, Constructing 3.5KM single phase 2 wire line at Manayathadam area
1.Replacing / Insertion of HT PSC pole in HT line - 15 nO. 2.Standardization of 11kV line by Reconductoring-2.1KM 3.Standardization of DTR station-1 nO 4.Replacing / Insertion of A pole in HT line-8 NO
Picking, collecting and stacking Earthwork excavation supply and filling quarry muck PCC Centering and shuttering RCC lifting loading and proper placing of precast RCC slabs filling earth fixing foundation bolts plastering Dismantling and stacking
Drain
Demolishing stone rubble Picking collecting metal Earth work excavation Filling quarry muck PCC 1 3 6 Centering shuttering work RCC Steel reinforcement Filling earth Spreading 40 mm metal Structural steel work
RETARRING
Civil WORK
Electrical Works
Picking collecting and stacking Earth work excavation Supplying and filling quarry muck PCC Centering and shuttering RCC Lifting loading and proper placing of precast RCC slabs Filling available excavated earth Plastering Structural steel work S
Construction of foundation of yard structures and equipments, erection of yard structures and equipments, dismantling of 66kV bus, , stringing earth wire, providing interconnections, Providing earth mat, equipment earthing
Electrical works
Drawing 1100 Mtrs of 3x300sqmm 11kv XLPE UG Cable through 125MMHDPE pipe including supply of HDPE pipe
Road work
Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured .7KM And Dismantling 11kV line complete .8km
K K Chlla School Canal road Re -tarrring from Transformer to Mani house at Kozhinjampara GP
Bringing down motor,Motor and pump alignment,charges for overhauling,supplying transformer oil,pump oil etc.
Charges for lift down motor,Charges for press slip-ring,Supplying transformer oil,Pump oil,etc.
Annual Plan-MAVELIKARA THEKKEKKARA GRAMA PANCHAYATH 2023-24.EDAKADAVIL TRANSFORMER JN CULVERT PUNARUDHARANAM WARD 16.-PR230.
Charges for lift down motor,Dismantling pipe,bend,Supplying Transformer oil,pump oil,coupling bolt etc
Interlinking 11 KV line from Puthillath Transformer to Meprangattu temple using covered conductor under Ele.section, Vadanapilly.
construction of 2km HT line from Ullayam to adamattom and install transformer at ullayam vazhoor section
Parakkode Block Panchayath 2021-22 Tharayilpadi transformer padi road concrete ,ward 10 in Pallikkal Grama Panchayath
Construction of MAC road and gate at 110kV Substation Parassala for erecting 12.5MVA 110/11kV Transformer
Construction of HT and LT lines installation of transformer and related works under Electrical section Moolamattom