Loading…
Loading…
15,059 results • Best match
Supply of Fresh Transformer Oil in Drum
Repairing of Potentional Transformer under ETD, Bahraich
Supply of Fresh Transformer Oil in Tanker
Supply of FRESH TRANSFORMER OIL(In drums)
Supply of Fresh Transformer Oil in Tankers
Supply of Fresh Transformer oil (in Drum)
Soap solution for transformer tank leakage test
Single frequency Transformer bridge Tan delta equipment
Transformer Winding Resistance Meter (Q3) (3 (3 ))
Transformer Oil as per IS 335 (Q4)
Transformer Oil as per IS: 335 (Q4) ()
Automatic oil cooled AUTO TRANSFORMER STARTER pane
SOAP SOLUTION FOR TRANSFORMER TANK LEAKAGE TEST
Transformer Turn Ratio Meter (Q3) (3 (3 ))
SET OF TRANSFORMER FIXING BOLTS WITH NUTS.
Transformer Oil as per IS: 335 (Q4)
Transformer Oil as per IS: 335 (Q4)
Procurement of 01 no. 500MVA Auto Transformer.
Construction of line indtallation of transformer etc
Change of Damaged/Burnt Transformer under Barhaj
Change of Damaged/Burnt Transformer Under Gauribazar
Replacement of damage transformer (250KVA to 630KVA)
Replacement of damage transformer (250KVA to 630KVA)
Dismantling of uneconomical Transformer of different capacity
Dismantling of uneconomical Transformer of different capacity
Transformer Increasing Capacity and Construction of Plinth
REPLACEMENT OF MEDIUM TRANSFORMER UNDER EDC FTP
Installation of Transformer and construction of Line
Dismantling of uneconomical Transformer of different capacity
Dismantling of uneconomical Transformer of different capacity
Installation of Transformer and construction of Line
Dismantling of uneconomical Transformer of different capacity
INCREASING OF TRANSFORMER IN EDD III FATEHPUR
Sub Station- Chakarghatta 5MVA Transformer work etc.
Dismantling of uneconomical Transformer of different capacity
INCREASING OF TRANSFORMER IN EDD II FTP
250 KVA Copper Wound Level-2 Transformer
400 KVA Copper Wound Level-2 Transformer
Supply of 1800 KL Fresh Transformer Oil
PREVENTING LEAKAGE OF OIL FROM VARIOUS TRANSFORMER
PREVENTING LEAKAGE OF OIL FROM VARIOUS TRANSFORMER
PREVENTING LEAKAGE OF OIL FROM VARIOUS TRANSFORMER
PREVENTING LEAKAGE OF OIL FROM VARIOUS TRANSFORMER
PREVENTING LEAKAGE OF OIL FROM VARIOUS TRANSFORMER
Repalement of Damage Transformer under EDD Hamirpur
Repalecement of Damage Transformer under EDD Hamirpur
for Reclamation of Burnt Carbonized dirty Transformer Oil at different Transformer repairing Workshop under Electy Workshop Division, Prayagraj.
Supply and Installation LT Protection work for Tailless Unit 400/630 KVA DTr under EDC Mahoba (Bup_Plan-2024-25) on Semi-Turnkey Basis
Shifting, Installation, Erection and Commissioning of 40MVA Transformer and Loading, Unloading and Transportation of 40MVA Transformer at 132KV S/S Oyel under ETD Lakhimpur