Loading…
Loading…
687 results • Best match
Supply of LT line spacer under North Malabar Region of KSEBL
shifting 35 HT and LT poles and insertion PSC poles 5 Nos and Insertion LT poles 6 Nos Erecting 3 No A poles and providing 10 Nos coil earth and 10 Nos of pipe earthing and shiting DP structure and one DPstructue with 100KVA transformer
constructing 1.8km ht line at aalakalpady and install one transformer under pallikathode section
Clearing touching on HT lines - cutting tree branches, bamboo clusters, cocunut cudjans etc.as specified by dept. under ES Kallara under AMC
Shifting of Poles and Transfomes.
CONSTRUCTION OF 2.600 M HT LINE , ERECTION OF 100 KVA DTR AND ALLIED WORKS
Construction of 1.61 KM 11 KV line using PSC/A Pole, Erection of 1 No. 100 KVA DTR, Construction of LT line, Conversion of LT line and Installation of AB Switches
Stringing 31.5 km street main at different places under pandikkad grama panchayath
HT and LT ABC stringing at various locations under Thrikkakara west section.
Stringing LT ABC, Dismantling existing line, Insertion of poles and allied works
CONSTRUCTION OF 11 KV LINE OH
Clearing Touchings and overhangings on LT lines along Keezhavoor to Pothencode no.2 Transformer area (AMC) under Electrical section,Pothencode
Reconductoring LT OH 5 wire line with LT three phase ABC 10km Conversion of LT 2 wire OH line to 3 phase ABC 3.5km
1. Replacing / Insertion of HT PSC pole in HT line- 90 Nos. 2.Replacing / Insertion of A pole in HT line-9 Nos. 3. Muffing for A pole- 9 Nos. 4. Providing HT stay -99 Nos.
RECONDUCTERING 2.5KM HT LINE FROM AYYAPPANTHODU TO VENGAD THERU USING ACSR RACCON UNDER ES VENGAD
Rerouting 1.5kM HT line Elappunkal jn to Kalachanda for eliminating cross country under ES Paika
OUTSOURCING OF MAIN REC. STA INC PUMP HOUSE AND DG SET AT NAE , REP/MAINT OF CEILING FAN, EXH FAN, ELE SUPLY, SWITCH, TUBE LIGHT, GEYSER AND REP TO SPLIT AC AND REP TO BOUNDARY WALL LGT FTG ,STREET LIGHT, LT LINE, EARTHING, TRANS AND MISC REP AT NAE
Stringing 13.75 KM LT ABC 3x70 1x50 1x16 sq mm on Turnkey basis
DS Kanakakunnu-Njarakavala with 100KVA Transformer under ES Murikkassery stringing raccoon 1700 M
Urban Agglomeration UA 20 21 Karakulam Panchayath Providing Transmission Line DI pipe Kepco to Kallayam part 3/4 Pipeline Work
Existing HT/LT line is to be shifted for widening of the said road
CONSTRUCTION OF 11KV OH LINE,LT LINE RECONDUCTORING, PROVIDING BUCKET CRADLING AND ALLIED WORKS
1.Replacing / Insertion of HT PSC pole in HT line - 15 nO. 2.Standardization of 11kV line by Reconductoring-2.1KM 3.Standardization of DTR station-1 nO 4.Replacing / Insertion of A pole in HT line-8 NO
construction of 2km HT line from Ullayam to adamattom and install transformer at ullayam vazhoor section
Touching clearance under ES Thrikkakara
Interlinking Kunjettankada to Mulakaramedu with1 DTR under ES Kattappana STRINGING 2 KM11KV OH RACOON
Stringing of one km 11kV Double Circuit line with ACSR Raccoon and allied works
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) and allied works
Stringing of 11 kV Aerial bunched cable and installing 100KVA tfr and allied works
Strutural steel work,Fabrication,industrial work,PVC pipe work,Loading and transporting of departmentaly issued material and equipments,Erection yard structure,coloumn and beam,110KV bus bar work110KV equipment erection,and allied work, etc.
reconductoring with lt abc
Construction of 11kV line- 450 METER
1. Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 4 kilometer
Constructing new 11kV feeder from Varkala substation to Enarvila by laying 0.4km 11kV XLPE UG Cable , stringing 1.3km 11kV Covered Conductor and stringing 0.6km 11kV ACSR Raccoon CW-4534-202526-19 for Electrical Section Palachira
Shifting of HT and LT line and Poles Transformers DP structure AB switches providing earth
Shifting of HT and LT posts, ABswitches, Stays and HT and LT lines, Providing Earthing, strut pole, insertion of HT and LT posts
Stringing of 1.4Km 3 PH 11kV line with XLPE Insulated ACSR Raccoon and allied works
r SHIFTING OF HT/LT LINES AND STRUCTURES FROM KARUMATRA TO PANAMPILLY (PEECHI-VAZHANI TOURISM CORRIDOR) IN F/O KIIFB UNDER ELECTRICAL SECTION, PUNNAMPARAMBU
Construction of 11 kv -1300 mtr, installation of 100 kva tr
UTILITY SHIFTING FOR ROAD WIDENING BY KIIFB
Clearing touchings under ES Udayamperoor
Inserting 220kV S type tower at proposed 110kv substation site Vazhoor and stringing for LILO arrangement
Fitting and erecting of HT A type pole 67 Nos Stringing 11kV covered conductor 3.9 km
LT ABC Stringing,Erecting pole,Dismantling existing ACSR rabbit conductor under eyyakuzhy and kuruvikkad Transformer area.
Stringing of 1.1 kV ABC of size 70sqmm with bare/insulated Messenger through existing poles 5120m
Clearing touchings on LT lines in AMC basis on 11 KV CH Bypass, Court road, Municipality, Pandikkad, Payyanad, cherukulam and kuttippara feeders During 2026-27
Developing and standardising HT Line infrastructure for drawing 11kv ABC to provide dedicated 11kv feeder to KSE Ltd Irinjalakuda .
reconductoring with LT ABC AT CANTANMENT TRANSFORMER
Laying 6 kM HT ABC from Choondy KWA to Ramamangalam Pump house in favour of KWA under ES Thiruvaniyoor
CONSTRUCTION OF 11 KV LINE 2330 METER