Loading…
Loading…
687 results • Best match
Shifting Electrical utilities of length 8.22km for Muringoor Ezhattumugham road under ES Meloor
Stringing of 11 kV Aerial bunched cable existing poles 2000mts Fitting and erecting one HT DP using A type pole 3 Nos Insertion and Renewal of existing damaged,old 11kV PSC
Clearing touchings ht lt lines (150km)
Cost of raising Misc.Plantation in 1 Ha at Muringamala under CA Scheme (Forest Land diverted for Upgradation of 11 KV Transmission Line) in Choolannur Section of Alathur Range during 2024-25 and 2025-26
Deposit Work Government Funded- Realignment of HT and LT Lines using HT UG Cable and LT ABC in Connection with Padanilam and Chunakkara Temple Festivals under Nooranad and Charummoodu Electrical Sections Under Electrical Division Mavelikara
SHIFTING OF HT AND LT LINES AND POLES ALONG UKKINADKA-NELLIKATTA ROAD IN CONNECTION WITH UPGRADATION OF KALLADKA-PERLA-CHERKALA ROAD IN FAVOUR OF THE ASSISTANT ENGINEER,PWD ROAD SECTION BADIADKA UNDER NELE. SECTION, BADIADKA.
Construction of new HT line using 120sqmm HT ABC, transformer DP, dismantling and transferring LT lines for Constructing Transformer DP structure at 5 locations and construction of HT ABC at Ambalaparambu under Electrical Section Mala
Re-construction of compound wall damaged due to natural calamity and stringing of barbed wire for the entire length of compound wall at 110kV substation Adimaly
Construction of additional bays for evacuating power from Chathankottunada Stage 2 SHEP Erection and earthing of equipments, Stringing of busbar and lightening shield.at 110kV Substation Kuttiadi
Construction of new HT line using 120sqmm HT ABC, transformer DP, erecting transformer dismantling and transferring LT lines for Constructing HT ABC Line and Installing 100 KVA Transformer at MILMA Road Kuzhur under Electrical Section Kuzhur.
HT reconductoring at various locations viz. Mazhuvancherry,Readymade to Edanattupady,SNDP Jn. to Homeo Research under Eie.Sn.,Kurichy
AMC Touchings on LT Lines ES Kodakara
Deposit work of KINFRA Supplying and laying, joining, testing and commissioning of 150 mm DI transmission line from OHSR at Ullumalakunnu to sump at KINFRA Park near Sainik school Kazhakuttom Extra Items and Road restoration work
Stringing of HT ABC 150 sq.mm through Existing poles from Chettedom to Pathanad, Plackalpadi Reliance ,SBI and upliftment of 6 nos of Transformers at ES Pathanadu under Electrical Division Changanssery.
Punargeham Project - Installing Testing and commissioning of 4 nos 250 kVA transformer and 4 nos CTC RMU and constructing LT lines using ABC for providing LT Service Connection to 400 flats at Muttathara, under Electrical Section, Sreevaraham.
Supplying and stringing 17.5 km LT ABC 1x25 1x25 sqmm for street main on existing PSC pole on TURNKEY basis at various sections of Electrical Division Punalur
This work includes dismantling the existing line, earth work excavation, providing pile foundation, stub setting, concreting, erection of super structure, stringing of ACSR Dog conductor, earthing etc
Enhancing the safety clearance of HT/LT line along Pallimukku-Karavoor Alimukku road under work deposit scheme by KRFB in continuation with utility shifting under Electrical Section Piravanthoor
SHIFTING OF HT LINE AND POLES FOR FACILITATE THE ROAD WIDENING OF MEDICAL COLLEGE FROM MURINGAMAGALAM VATTAMON ROAD AS PER THE REQUEST OF AE PWD ROAD SECTION KONNI (Work code RW-4602-202425-196)
Construction of 5 Km HT Covered Conductor from Perumbankuthu to MHEP Power House site and installing 500KVA Transformer under ES,Chithirapuram. PART-1 (Excluding stringing of Covered conductor)
Constructing 11kv line from Vattappara-Mulayarachal using covered conductor under ES Oyoor and drawing 0.3 km HT line using covered conductor and installing 1 transformer at vilavoor Charukadu under ES Kundara
Distribution Transmission Target 2024-25 Fabrication of 19316 Nos 16mm dia stay rods for LT lines 3m channel cross arms 2391Nos 3.15m channel cross arm 600 Nos and 4 line channel cross arm 13552 Nos at MF1 Angamaly Phase3
Estimate for the cost of stringing 450 M HT ABC,erecting 100KVA pole mounted DTR for LT power requirement to New Forest Station Building,Aranyabhavan Forest Complex Parampuzha Kottayam
Foundation Construction, Erection and Stringing of DC NB 60 Tower Plus 9M extension, for proposed 110KV Feeders 1NKPN and 1PNAV in connection with the construction of 110KV Substation Panthalacode.
Supplying and Drawing of LT ABC at Electrical Section, Pallimukku under Electrical Sub Division, Pallimukku
Supplying and Drawing of LT ABC at Electrical Section, Ayathil under Electrical Sub Division, Pallimukku
State Plan 2023 24 Replacing old AC Transmission line from Chala GL tank to Chinmaya College bus stop with 250 mm DI pipe and at Chala temple road with 160 mm PVC pipe Pipe line replacement work Pipeline Work
State Plan 2023 24 Replacing old AC Transmission line from Chala GL tank to Chinmaya College bus stop with 250 mm DI pipe and at Chala temple road with 160 mm PVC pipe Pipe line replacement work Pipeline Work
Erection of yard structures, stringing buses, erection of equipments including power transformers and connecting of equipments earthing to earth mat risers of both 110KV and 33KV yard
SHIFTING HT/LT LINES AND POLES , DTR STRUCTURE, ETC
Estimate for the cost of stringing 450 M HT ABC,erecting 100KVA pole mounted DTR for LT power requirement to New Forest Station Building,Aranyabhavan Forest Complex Parampuzha Kottayam-23-24
Reconductoring 11 KV line from Rationkada to Palakuzhy using covered conductor and stringing new 11 kV -work code (CW-4582-202526-58)under Electrical Section Ezhukone of Electrical Division Kundara
AS PER BOQ AND TENDER DOCUMENTS
Constructing HT line from Purappillykavu Jn to Naranathu Trf and then to Golden Eye AB and Rerouting HT OH line from Thattampadi Jn to Edanilam Colony using Covered Conductor under Ele Section Mannam
Foundation Construction, Erection and Stringing of DC NB 30 Tower Plus 6M extension, for proposed 110KV Pothencode - Panthalacode Feeder 1 and 2 in connection with the construction of 110KV SS Panthalacode.
Shifting of HT and LT line Transformers DP structures Excavation of pits for poles and stays fitting and erecting of poles stringing ACSR conductors HT and LTmFitting of AB switches providing stays DPs and earthing
Supply and stringing 6.6km of covered conductor (Equivalent to ACSR DOG) in already erected 14m A poles and Lattice towers. ( 33kV single circuit line from 110kV Substation Kodungallur to 33kV Substation Methala )
Constructing 2.5kms of 11kV OH line from Thottumkara to Ranigiri and Shifting Panchaathpadi, Challavayal and Ranigiri transformers to load centers Under Electrical Section, Moolamattom
Supply of 1.1kV Aerial Bunched Cable with accessories and Reconductoring 4Kms of LT overhead line with ABC
Construction of 13.5kM 33kV Single Circuit interlinking line between 33kV Substations, Vadanappally and Blangad along the existing HT/LT line route and construction of 33kV Bay at Vadanappilly substation for alternate feeding arrangements
Supply of 1.1kV Aerial Bunched Cable with accessories and Constructing 18.041 Km of LT OH line with ABC on existing PSC pole and dismantling of existing LT line on TURNKEY basis under ED,Kanhangad
constructing 1.5km ht line and install transformer
LT Touchings on AMC Basis
Reconductoring using LT ABC under Vembayam No 1 Transformer area
Revised estimate for shifting HT line and poles from Sevana Hospital to Nila hospital for road widening from Mele Pattambi junction to ROB Pattambi in favor of the Executive Engineer, KRFB, PMU, Palakkad under Electrical Section, Pattambi
Shifting HT, LT line and Transformers.
HT LINE Reconductoring-800 MTR, Changing damaged HT poles using A pole- 28 Nos, Providing HT LINE AB SWITCH- 1 no
Work of 110kV double bus stringing including supply of single tension hardware for single Kundah bolted type suitable for departmental 90kN polymer insulator at the new 110kV yard at 110kV Substation Kanjikode for Capacity enhancement capital work
Stringing 9.4 Km 11 KV Aerial Bunched Cable, 3x120 sq. mm 1x95 sq. mm (Insulated messsenger) under the existing HT line from 220 KV Malaparamba substation to the compound of MILMA unit at Moorkanad , Changing Existing PSC poles, Erecting A pole
Stringing of 11 kV Line 1.45 KM Stringing of 3 ph 5 wire 0.580 KM Stringing of 1 ph 3 wire 0.63 KM Erection of 250 kVA DTR 1 No