Fitting and erecting PSC,A type poles,providing Stays,sturt,flying,making DP structure,providing line AB switch pole muffing ,stringing HT and LT lines,Etc
This estimate is proposed for interlinking Mullassery feeder and Manalur feeders by constructing 11kV line between Korly and Venkitangu Village Transformers using A pole and ABC. The existing LT line and korly Transformer Structure will be rearrang
SHIFTING HT-LT LINES AND TRANSFORMER STRUCTURE FOR ROAD WIDENING KECHERY-AKKIKAVU BYPASS ROAD FOR KIIFB PROJECT IN FAVOUR OF THE ASSISTANT ENGINEER, PWD ROADS UNDER ELE.SECTION KECHERY.
shifting of HT LT lines and poles, Transformers from Puthiya puzhakara to Karanthad within 2m under deposit work. The work involves 11nos of A pole 11m for cut poles. Total line length HT LT 700m Shifting of line AB DP structure-1no. (Puthiyapuzhakar
LT reconductoring and LT line maintenance works of 4 Nos of Distribution Transformers under Civil Maintenance Section, Poringalkuthu - Labour Part
Shifting HT/LT line in f/o Executive Engineer KRFB-PMU Division PLKD/MPM, from Poovathani- Chethallur under ES Thazhecode
SHIFTING OF HT AND LT LINE AND POLES FROM PARAMBA TO CHERUPUZHA PALAM FOR HILL HIGHWAY, UNDER ELECTRICAL SECTION NALLOMPUZHA
DW for shifting HT and LT line for road widening under KIIFB Scheme Pottachal to Uppukuzhy at Electrical Section Varandarappilly
Constructing 2km new LT line and 2km conversion of 2wire OH line to 4wire OH line Pathinaramkandam under ES Murikkassery
Stringing of HT Line with Covered conductor 650mts Fitting and erecting one 100kVA Transformer 1 No Fitting and erecting HT Apole 26 Nos
STRINGING 600 M 11KV LINE USING 120 SQMM ABC AND INSTALLATION 100KVA TFR AT VEMBILLYKHADIBOARD FOR VI UNDER ELECTRICAL SECTION KIZHAKKAMBALAM
Fitting and erecting PSC,A type poles,providing stays,sturt,flying stays,coil earting making DP and erecting AB switches,polemuffing,stringing 11KV and LT lines etc.
ALLIED WORKS FOR STRINGING NEW FEEDER USING COVERED CONDUCTOR FROM 33KV SUBSTATION OACHIRA, TO AMRUTHA (AMRUTHA FEEDER ) UNDER ES OACHIRA
Retendering Supplying and Stringing LT ABC at Half Portion of Panamukkan and Villageunder Electrical Section Perinad under Electrical SubDivision Perinad
Retendering Supplying and Stringing LT ABC AT PANCHAYAT M G COLONY AND PULIYOORVANCHI UNDER ES MANAPPALLY UNDER ELECTRICAL SUBDIVISION OCHIRA
Deposit work estimate for shifting HT and LT Poles maintaining ground clearance from HT and LT lines due to increasing height of Pdhrm road KRFB under Electrical Section Thakazhy
Shifting HT and LT line along Mannoor-Vengola Road for road widening in favour of AE, PWD under Electrical Section Valayanchirangara
DEVELOPMENT OF INFRASTRUCTURE AT KASARAGOD CIRCLE UNDER RDSS SCHEME ON TURNKEY BASIS- RE CONDUCTORING OF LT LINE WITH ABC 95 SQ.MM
Constructing 800m HT line and inserting 100 kVA DTR at Painumoodu colony (CW-4588-202526-30) of Electrical Kulakkada of Electrical Division,Kottarakkara.
fITTING AND ERECTING psc ,a TYPE POLES,STRINGING 11kv LINES,LT LINE,PROVIDING STAYS,STURT,FLYING STAYS,PROVIDING AB SWITCHES,POLE MUFFING etc
Construction of foundation, Erection of yard structures and equipments, Earthing, Stringing line and bus and connecting equipments.
Installation of a New 100 KVA DTR at Thengumvila by stringing HT covered conductor, Sooranad Under ESD Sasthamcotta On Turnkey Basis
Stringing new 11 kV feeder from Melattur S/S to Pandikkad town by using ABC through existing poles under ES Pandikkad
Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. (113.95 km) at specified distance from the lines on AMC basis under Ele. Section , Kumily
Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. (114 km) at specified distance from the lines on AMC basis under Ele. Section , Peruvanthanam
Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. (148.33 km) at specified distance from the lines on AMC basis under Ele. Section , Vandiperiyar
GENERAL-Replacement of damaged street lights and Cutting and clearing touchings and over hangings on the over head LT lines inside government leprosy hospital compound Koratty work General Electrical Work
Supplying, Stringing, Testing and Commissioning of 810 m 11 KV ABC from Kinfra 4 pole to Rubber Park through existing 11 KV OH line route in turnkey basis
Clearing touchings on LT line (Rural/Remote) of Town feeder and Arippa feeder for one year under Electrical section Kulathupuzha in AMC
SOP TO SRI SHIBY PD KOZHUKKULLY CONVERSION OF 722 MTR LT LINE TO HT-LT and INSTALLATION OF 100 KVA DTR UNDER ELECTRICAL SECTION NADATHARA
Stringing ABC 25 sq.mm. for Street Main at various locations of 16-Wards of Azhikode GP under DW basis under ES Azhikode
Stringing 1.7 KM 11KV line for interlinking Kuruthancode and Chempanagode and erecting one 100KVA Transformer at Kairali Nagar under Electrical Section, Ottasekharamangalam
HT structure work for stringing new 11 KV feeder by using ABC from Melattur SS to Pandikkad Town under Electrical section Pandikkad
Stringing ABC 25 sq.mm. for Street Main at various locations of 23-Wards of Azhikode GP under DW basis under ES Azhikode
VI /SI WORK AT PONNAMKANI,MATHAIKADA,JOSEKDA -2019-20-Constructing 1km HT line, installing 100kVA Transformer and conversion of 1km LT line under Electrical Section, Thookupalam.
Rerouting HT line from Perumtharathala cross country to Kallarthala- Chakari area using ABC Under Electrical Section, Kunnathukal of Electrical Division, Neyyattinkara under Electrical Circle, Kattakada
Erecting 100 kVA transformer at Vakkath Road Laying 450 mtr UG Cable and construction of 85 mtr LT line under Ele Sec Vennala
Shifting of HT/LT line from Lakshmi mill Junction to Olari(OLI38-OLI) in favour of AE,PWD Roads under Electrical Section Ayyanthole
Shifting of HT/LT lines and accessories from Kainatty to Madakkimala to the side of the road which includes dismantling and re errecting poles/ DP structures / Transformers / Stays / Struts / Fly Stays as per the schedule attached
KIIFB - UWSS to Adoor and adj.pt. Replacement of 400mm AC Transmission line and Distribution main by using 400mm DI K9 pipe from TP at Chiranickal to Parakodu junction in Adoor municipality.
JJM - Vettikavala Panchayath - Part II - Supplying and laying distribution network in Zone IV B, Providing 3000 nos FHTCs, Laying 200mm DI Transmission line, Construction and Commissioning of 3LL GLSR at Eranoor
Target 2025-26 - Fabrication of 16mm dia Stay Rod for LT lines 50000 Nos ,3.15m Channel cross arm 200Nos,LT stay clamps 764Nos and HT Stay Clamp 4860 Nos at MF1 Angamaly
220/110kV Transformer 2 Bay Construction - Ambalathara -Second Phase -Equipment erection, bus stringing, Earth shield , Equipment earthing and Control Cable Laying And termination
Stringing of 2 km HT ABC and laying of 70 mtr UG Cable from Toll Junction to Krishnapilla Junction under Electrical Section, Chempu
110kV Substation, Adimaly-Erection of equipments, panels, bus stringing, cable laying, termination etc in connection with the construction of 2 Nos. 110kV bays
CONSTRUCTIING 1.3 KM HT LINE FROM KOTTAMKOICKAL JN TO A AND A JN FOR JOINING CHEPPAD FEEDER under Ele. Section, CHEPPAD - Work code - 5530-202324-84
PM Constructing 300m HT line Installation of 1No 100KVA Transformer and GI Sheet roofing of Pumphouse building of LI Scheme Moothikayam in MoorkanadPanchayath Malappuram Dt-Retender
Shifting HT LT line on Anchal-Punalur road due to road widening KIIFB Part II from Archana to Ambalammukku under Electrical Sec-tion Anchal
Erection of equipments, Transformer, Bus stringing, cable laying etc in connection with the 3rd phase renovation and capacity enhancement of 110kV AIS Substation Perumbavoor
Erection of equipments, Transformer, Bus stringing, cable laying etc in connection with the 2nd phase renovation and capacity enhancement of 110kV AIS Substation Perumbavoor