Loading…
Loading…
3,290 results • Best match
Carriage of stubs and cleat for construction of 220 and 132 KV Transmission lines emanating from 220 KV GIS Bhadohi under ETD-IV Varanasi.
Backfilling work and stone pitching workfor two years at several towers of EHV transmission lines under jurisdiction of TLM office of POWERGRID at Prayagraj
WORK OF PATROLLING OF VARIOUS 132 KV TRANSMISSION LINES THROUGH ARTIFICIAL INTELEGENCE (AI) BASED VISUAL AND THERMOVISION DRONE (LIDAR SURVEY) UNDER ETD-I , GORAKHPUR
Replacement of Porcelain Disc Insulator with Long Rod Polymer Insulator at Shaktinagar, Mirzapur, Varanasi and Gorakhpur TLM in Various Transmission Lines under NR-III
Work of shifting HT/LT lines passing above primary/upper primary schools under Electricity Distribution Section-Shikarpur, Bulandshahr
Work of Maintenance of HT/LT lines in the area of EDSD Mahoba Town under EDD I Mahoba
Work of shifting of HT/LT lines passing over the Primary and Upper Primary School under EDD-Phoolpur
Work of Construction and Maintenance of 11 kv Lines LT Lines damage due to natural Disastar and cyclone
Repairing and Maintenance of 11 KV/LT Lines of 33/11KV S/S-Pachahra under EDD-Mant, Mathura
Repairing and Maintenance work of LT Lines of 33/11 KV Sub-Stations Laxminagar under EDD-III, Mathura
Erection of LT Lines and Sub-Station in Ganga Nagar and Palhari under Sugam Yojana under EUDD, Banda
Work of shifting of HT/LT lines passing over the Primary and Upper Primary School under EDD-Kaptanganj
Work of Maintenance of HT/LT lines in the area of EDSD Mahoba Town under EDD I Mahoba
The work of emergency maintainance and repairing of 11 KV/LT Lines due to damaged under EDD, Atarra
work of maintenance/repair of minor faults in ST/LT lines at all Substation under EDD-Saidpur, Ghazipur
work of maintenance/repair of minor faults in ST/LT lines at all Substation under EDD-Zamania, Ghazipur
work of maintenance/repair of minor faults in ST/LT lines at all Substation under EDD-Jangipur, Ghazipur
Work for Construction of LT Lines and System Strengthening under jurisdiction of EDC Fatehpur under system strengthening head
For Strengthening and Maintenance of HT/LT Lines Under 33/11 Sub-station Madhvapuram Under EUDD-V, Meerut.
Work of shifting of HT/LT lines passing over the Primary and Upper Primary School under EDD-Sathiaon
Repairing and Maintenance of 11 KV/LT Lines of 33/11KV S/S-Khayra under EDD-Mant, Mathura
Work of Maintenance of HT/LT lines in the area of EDSD Mahoba Town under EDD I Mahoba
Work of Maintenance of HT/LT lines in the area of EDSD Panwadi Town under EDD Kulpahad Mahoba
Repairing and Maintenance of LT Lines Of 33/11KV S/S in EDSD-Raya under EDD-III, Mathura.
Proposed work for Maintenance and Replacement of Damaged 11KV/LT Line at various places emanating from 33/11 KV S/s Under EDSD-Baldev, Mathura in the jurisdiction of E.D.D.-Ist, Mathura
Construction of new LT Line under MNSY 2024-25 in the jurisdiction of edd bhadohi
Work of LT Line Strengthening and Bifurcation of 11 KV Line under Business Plan 2026-27 in the Area of EUDD-11 KV and LT Line, South-Madhavpuram, Meerut.
Repairing and Maintenance of HT/LT Lines and other associated work for Natural Calamities (Daiviya Aapda) at different 33/11 KV substations in Town and Rural Area under EDD-Lalganj Pratapgarh.
Repairing and Maintenance of HT/LT Lines and other associated work for Natural Calamities (Daiviya Aapda) at different 33/11 KV substations in Town and Rural Area under EDD-Raniganj Pratapgarh
Repairing and Maintenance of HT/LT Lines and other associated work for Natural Calamities (Daiviya Aapda) at different 33/11 KV substations in Town and Rural Area under EDD-I Pratapgarh
Erection and Dismantle of HT overhead transmission line as and when required for 06 months at Krishnashila Project.
Erection and dismantle of HT overhead transmission line as and when required during Monsoon 2021 at Krishnashila Project.
Erection and dismantle of LT overhead transmission line as and when required during monsoon 2020 at Krishnashila Project.
Erection and Dismantle of LT overhead transmission line as and when required for 730 days at Krishnashila Project.
Erection and dismantle of HT overhead transmission line as and when required for 365 days at Krishnashila Project.
SITC of 11/.4 kv transmission line at BIRDPUR NO 14 TW NO 3 WSS District SIDDHARTH NAGAR
Erection and Dismantle of LT overhead transmission line as and when required for 730 days at Krishnashila Project.
MODIFICATION/HEIGHT RAISING OF 132KV NAUBASTA-GHATAMPUR TRANSMISSION LINE FOR METRO RAIL AT KANPUR, UNDER ETD-II KANPUR.
SITC of 11/.4 kv transmission line at BIRDPUR NO 14 TW NO 2 WSS District SIDDHARTH NAGAR
WORK OF Fabrication/Fixing of Missing Tower Members of 220 KV Mahoba-Parichha Transmission line Under ETD Hamirpur
Construction of well foundation in Ganga River on location No. 22/1 for Unnao-Phoolbagh (Kanpur) Transmission Line.
Construction of well foundation in Ganga River on location No. 22/2 for Unnao-Phoolbagh Kanpur Transmission Line.
Erection and dismantle of HT overhead transmission line as and when required for one year at Krishnashila Project.
Erection and dismantle of HT overhead transmission line as and when required during monsoon 2020 at Krishnashila Project.
SITC of 11/.4 kv transmission line at FATEHPUR ZONE A TW NO 3 UNDER UIDSSMT District Gorakhpur
Erection and Dismantle of LT overhead transmission line as and when required for 730 days at Krishnashila Project.
Supply of Leakage Current Partial Discharge Detector Kit for Transmission line in NER of POWERGRID (Specification. No.: NCN0321)
Annual Emergency maintenance 33/11 KV HT/LT line for regularr supply
The Work for LT line electrification of Sarsvati Nagar Colony, Paramanandpur, Varanasi
REPAIRING OF INTERNAL ELECTRIFICATION OF DIFFRENT BUILDINGS LT LINE APF TOILET ETC