Loading…
Loading…
4,483 results • Best match
Replecment of HT/LT line due to storm at 33/11 KV s/s Kundesar and Khairabari under EDD-II
Replacement of old and jarjar HT and LT Line conductor on G25 feeder and M 152 feeder under Gumti Division
33/11 KV S/st. Arniya, khurja junction, saneta Repair LT Line and Attend Break Down in SDO II Rural
Removal of conductor of HT LT line for passing Tazia on Muharram and re-sagging after muharram under EDSD Dalpatpur.
Replacement of pole, 11 kv LT line, Damaged pole for touching of vehicle area of sdo III under EDD-I
Shifting of 33, 11 and LT Line along Proposed Purvanchal Express way (Chanaige No 0.00 Km to 17.76 Km ) Lko
Repairing or Replacement of PCC pole for LT Line Damaged by Cyclone or Vehicle under the supervision of EUDD-Munshipulia
Construction of 400 KVA Transformer and LT Line at Osho Nagar, Kanpur Road under E.E., EUDD-Kanpur Road, LESA, Lucknow.
Repairing and Replacement of damaged Pole, LT Line and guarding of 11 KV line under the area of EUDD (Thakurganj)
Work of replacement, maintenance, repair of sudden power disruption in 33/11 LT/HT lines in the area of 33/11KV Sub-Stations under EDSD-IInd, Bhupauli under EDD-Sakaldiha.
Replacement of HT line and Construction new line for releasing 200 KVA Connection in the head Deposit Scheme Under EUDD-Bamrauli, Prayagraj.
For Installation of 11/0.4KV, 250KVA Transformer and Construction of HT Line at Anand Nagar Kandawa, Varanasi under Business Plan 2019-20.
Work of repairing and maintainance of HT Line in the area of 33/11 kv S/s Raya under EDSD- Raya, Mathura.
Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida
FOR REPAIRING OF ROUND S.T. POLES OF LT/HT LINE IN EUDSD-I/II/III, IN THE JURISDINCTION OF EUDD-I, MORADABAD
FOR REPAIRING OF ROUND S.T. POLES OF LT/HT LINE IN EUDSD-VII/VIII/IX, IN THE JURISDINCTION OF EUDD-III, MORADABAD
Required LT/HT line Work to Avoid electrical Accident during kanwad yatra in the area of SDO-I under EUDD-VII GZB
Required LT/HT line Work to Avoid electrical Accident during kanwad yatra in the area of SDO-II under EUDD-VII GZB
FULL DEPOSIT 2 KM LT NINE AND 2 HT LINE WHIT T/F NEW AND LINE SHITF ETC UNDER EDD II BARAUT
Work of constructing 02 Km LT line in Village Basdaliya under 33/11 kV power SS Naugarh, and construction 2.5 km LT line under SS Rehra and converting 21.67 km 2 phase line into 3 phase under SS Jogia. Under BP 2024-25 under EDD Siddharthanagar
Repairing of LT line, extension of LT line, S/F of LED street lights, S/F of main switch, change over switch, S/I of 15hp submersible pump and starter, Construction of 1 no. mini boring and S/F of 1HP Submersible Pump at NMY Gangoh.
CONSTRUCTION OF NEW 33KV 11KV LT LINE AND DISMANTLING SHIFTING OF EXISTING 33KV 11KV LT LINE T/F OF DIFFERENT CAPACITY INSTALLED AT BOTH SIDE OF THE ROAD FROM SHANKARPUR CHAURAHA TO NAWABGANJ DUE TO WIDENING OF ROAD BY PWD BRH AGAINST DS UNDER EDD II
FOUNDATION WORK, TOWER ERECTION AND STRINGING WORK INCLUDING DISMANTLING OF DAMAGED TOWER AT TL NO-23 OF 132 KV NEW TANDA(220KV)-GOSAISINGHPUR DC LINE UNDER ETD SULTANPUR
Periodic (Bi-Monthly/Quarterly) Routine Patrolling/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 132KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year w.e.f. 01.03.2020 to 28.02.2021
Periodic (Bi-Monthly/Quarterly) Routine Patrolling/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 220KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year w.e.f. 01.03.2020 to 28.02.2021
Various types Repairing and Maintenance work of HT/LT line and substation and other associated work area of GPRA Sub Division, emanating from 33/11 KV S/S GPRA, SAHARA, SHRISTY, INTEGRAL UNIVERSITY, Under the area of EDD-BKT, LESA, Trans Gomti, Luckn
Custom Bid for Services - 33 KV line strengthening work and LT line Strengthening work and other LT line associated work on Semi-Turnkey basis in Business Plan 2026-27 under the area of EDD, Kiraoli and Kheragarh Agra Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
LAYING AND STRINGING OF ZEBRA CONDUCTOR BETWEEN LILO POINT OF 220KV GORAKHPUR PG- BANSI LINE LILO AT 220KV SUBSTATION DULIHUPAR
erection of ABT Energy meter stringing of slack span on 220 KV Interconnector bay II at 220 KV substation Gonda
Stringing of transfer Bus and interconnection of Bus bar etc at 132 KV S S Bansi, Under ETD-II Basti
Design Engineering Manufacturing Testing Supply Stringing Installation Testing Commissioning etc. for Construction of 132 KV Transmission lines on ACSR Panther conductor (approx. 123.97 route Kms) of UPPTCL on Turn-key basis
ROUGH SURVEY FOR CONSTRUCTION OF 220KV D/C TRANSMISSION LINE AT GIDA AREA BY DISMANTLING OF 220KV BARAHUWA- TANDA AND 220KV BARAHUWA-PGCIL LINE UNDER ETD-II, GORAKHPUR
Development of Transmission Line (400kV) 80kM approx. as per General Technical Specifications for evacuation of Power generated from 1200 MW Solar Power park in District Jalaun, Uttar Pradesh.
The Work for Shifting of 33 KV, 11 KV and LT line in Phase-1 from Pillar No-P-18 to Pillar No-P-01 for Construction of proposed New Fly Over of UEDD-VIII, Varanasi
The Work for Shifting of 33 KV, 11 KV and LT line in Phase-3 from Pillar No-P-40 to Pillar No-P-32 for Construction of proposed New Fly Over of UEDD-VIII, Varanasi
Work of shifting of high tension wires and LT lines passing over primary and govt. higher primary schools, secondary and higher secondary schools within the areas of EDSD-Chandauli,Jivnathpur,Saiyadraja under the Deposit Scheme.
Work of converting LT Line from Vessel to LT ABC in the scheme of Nagaer Nikay 2024-25 office of the EDD-2 Azamgarh
Electricity distribution division-Ist, Sub-Divisional officer under Chandauli, Electricity distribution Sub-Division-IInd, the work of removing/maintenance/repair of 33/11/LT lines coming under Jeevnathpur area.
The work of repair and replacement of damaged electric poles and lines of 11 KV/LT lines damaged by storm (divine disaster) in the area of EUDD-III, Muzaffarnagar
For the Work Re-Construction of 33/11KV and LT Lines Damage Due To Heavy Wind (Daiviya Apda) in the area of EUDSD-XII, Ganga Nagar, EUDD-IV, Meerut.
Shifting work of 11 KV, LT lines and transformers in village Udayadih-Prithviganj road under Electricity Distribution Division, Pratapgarh on semi turnkey basis including loading and unloading of material.
The work of repair and replacement of damaged electric poles and lines of 11 KV/LT lines damaged by storm (divine disaster) in the area of EUDD-I, Muzaffarnagar.
For Maintenance of LT Lines with Strengthening of Poles, Replacement of Jumphers and Laying of LT ABC etc., Before Nauchandi Mela-2022, Under Electricity Urban Distribution Division-III, Meerut.
For Maintenance of 11 KV/LT Lines Including Replacement of Damaged Poles, Repairing, Welding, Strengthening of Poles and Providing Extra Supports etc, Under Electricity Urban Distribution Division-III, Meerut
For Maintenance of 11 KV/LT Lines Including Replacement of Damaged Poles, Repairing, Welding, Strengthening of Poles and Providing Extra Supports etc, Under Electricity Urban Distribution Division-III, Meerut
The work of erection of 11 KV HT/LT Lines and installation of additional DT at 11/0.4 KV Sub-Stations under Business Plan 2023-24 under EDD, Atarra
For Guarding of 11 KV/LT Lines, Providing/Binding of Polythene Sheets and Cutting of Tree Branches etc., Before Nauchandi Mela-2022, Under Electricity Urban Distribution Division-III, Meerut.
Electricity distribution division-IInd, Sub-Divisional officer under Mughalsarai, Electricity distribution Sub-Division-Ist, the work of removing/maintenance/repair of 33/11/LT lines coming under Chandhasi area.
Electrical Distribution Division-IInd Mughalsarai under Electrical Distribution Sub-Division-I, Chandhasi and Padao area , Work of removing accidental power interruption, maintenance, repair of 33 11 LT lines coming.
Electricity distribution division-Ist, Sub-Divisional officer under Chandauli, Electricity distribution Sub-Division-IIIrd, the work of removing/maintenance/repair of 33/11/LT lines coming under Chakiya area.