Supply and erection of 11 kV HT line for provision of 11 kV/440 V power supply arrangement from Ruchi Soya factory (ESD- Bhabhua, Circle- Sasaram) at DGON/IMSD and DGON Station under CGM/DDU /DFCCIL Unit.
New construction work of 11 KV HT line and installation of 63 KV T/F from Katesar to Swami Adgadanand Ji Maharaj Ashram in, Development under Deposit Scheme in EDD-IInd, Mughalsarai, 330meter 3x120sqmm underground cabling work.
Replacement of over Head Line to underground LT/HT Line for the installation of street light on Semi-Turn-Key Basis at Chandrashekhar Azad park under Deposit Scheme- 2022-23 under the jurisdiction of EUDD-Mayohall, Prayagraj.
BREAKDOWN AND PREVENTIVE MAINT. OF HT/LT LINES OF PTPP COLONY PARICHHA
Transfer work of 33 KV/11 KV/LT lines under deposit scheme.
WORK OF ERECTION , STRINGING , EARTHING , LAYING OF 33 KV AUXILIARY BUS-BAR AND OTHER WORK AND SUPPLY OF ASSOCIATED CLAMPS , FITTING AND HARDWARE AT 132 KV S/S F.C.I. , GORAKHPUR UNDER ETD-I , GORAKHPUR
REPLACEMENT OF 33 KV TRIPLE FEEDER PANEL AT 132 KV S/S SIKANDARPUR, ERECTION OF 36 KV VCB AND STRINGING OF 33 KV TRANSFER BUS AT 132 KV S/S BALLIA UNDER ETD, BALLIA.
of (1) Construction of HT Line for giving 2KW commercial connection to Railway Crossing Gate No. 140Km 184/5-6 between Balrampur-Bhawaniyapur Kalan railway station, (2) replacement of LT Line conductor (weasel to AB cable) at District Court Campus
System Augmentation of New LT Line
Construction of 11 kv LT Line
Construction of 11 kv LT Line
Reconstruction of 11 kv LT line
Repairing and maintenance of LT Line
Repairing and maintenance of LT line
Repairing and maintenance of LT line
Repairing and maintenance of LT Line
REPAIR/ MAINT OF INTERNAL ELECTRIC WIRING, LIGHT FITTINGS / FIXTURES AND EXTERNAL ELECT SUPPLY/DISTRIBUTION SYSTEM OF LT LINE AND ALLIED WORKS DG SET IN SG UNIT AREA SARSAWA UNDER GE (AF) SARSAWA
Quantum of works involved in 11 KV and LT Line of Jhatpat Nivesh Mitra connection and other deposite work in area of EDSD Kundan Road under EDD Divison Magarwara Unnao against deposite work
The Work for Shifting of 11 KV/LT Line by MVDA Mathura at Newly Constructed Jan Suvidha Kendra Goverdhan Mathura on Semi Turnkey Basis under Deposit Scheme in the jurisdiction of EDD-IV, Goverdhan, Mathura
Construction of various type HT and LT line and sub-stations against sanctioned packages under deposit scheme in the area of New Campus Sub-Division, Under the jurisdiction of EDD-B.K.T., LESA, Trans Gomti. Lucknow.
REGARDING ERECTION OF POLE IN LONG SPAN, GUARDING OF LINE AND FIXING PVC SHEER ON STEEL POLE AND STREGHTENING OF 11 KV LT LINE AT KAWAR MARG IN UNDER THE AREA OF EDD-I MAWANA
For Providing ABC in Place of Base Conductor on LT Line for Releasing Individual connector through pre Paid meter to all official and residential Houses in Irrigation colony Varunapuram Chhittupur, Sigra, Varanasi under deposit Scheme.
Dismental of 11 KV and LT Line of Various Category PD Connection LMV-5 and LMV-6 and Other Category in the area of EDSD-I/II/III, Maliyana/Pallavpuram/Bhola Under EDD-III, Meerut
Repairing of existing LT line, S/F of LED street lights, Repair of existing 30m hight high mast, S/F of LED flood light and Internal Electrification in Office and Toilet Block at NMY Bilsi
Construction of various type HT and LT line and sub-stations against sanctioned packages under deposit scheme in the area of New Campus Sub-Division, Under the jurisdiction of EDD-B.K.T., LESA, Trans Gomti. Lucknow.
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION OF NEW 11 KV / LT LINE AND LT S/S FOR G/S TO DIFFERENT CONSUMERS AND DIFFERENT WORKS UNDER THE FULL DEPOSIT SCHEME UNDER THE EDD-I UNNAO.
For the Work of Cutting/Chopping of Tree Branches along HT/LT Line in the area of 33/11 KV Sub-Station for the Clearance of Lines During Mela Nauchandi-2024 Under EUDD-III, Meerut.
Construction of various type HT/LT line and sub-stations against sanctioned packages under deposit scheme in the area of Vikas Nagar Sub-Division, Under the jurisdiction of EDD-Rahim Nagar, LESA, Trans Gomti. Lucknow.
Repairing of LT line, repairing of LED street lights, S F of LED street lights, S L of cable, Construction of 2 no. mini boring and S F of 1HP Submersible Pump at NMY Dataganj
WORK OF increasing capacity of TF, Installation of New TF, 11 KV/LT Line erection and strengthening of other work in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.
Extension of LT Line, S/F of Street LED Light and Its Related work and Internal Electrification in C type shop 5 No. and 12 X 40 Mtr. APF. 01 No. At NMY Biswa, Sitapur.
Work for shifting of 33, 11, LT line during road widening of Vijaipur to Dhata Marg and Dhata to Sonari Marg on semi turn key basis and its enerzisation under jurisdiction of EDD Khaga, Fatehpur
Proposed work for Maintenance and Replacement of Damaged 33 KV, 11KV and LT Line due to Daviya Aapda at various place in the area of EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
WORK FOR 33 11 KV SUBSTATION KUTBA TO EXISTING 11 KV AND LT LINE REPAIR LINE DAMAGE POLE REQIRED NEW POLE TO LONG SPAN AND SHIFTING AND LINE MAINTENANCE UNDER JILA VIDHUT VIKAS NIDHI YOJNA
Construction of various type HT/LT line and sub-stations against sanctioned packages under deposit scheme in the area of Engg. College Sub-Division, Under the jurisdiction of EDD-Rahim Nagar, LESA, Trans Gomti. Lucknow.
For Annual Maintenance/Service of Computers and Printers Installation Work in the Office of EUDD-11 KV and LT Line South, Meerut for the Period of 01-04-2026 to 31-03-2027 (12 Months).
For Annual Maintenance/Service of Computers and Printers Installation Work in the Office of EUDD-11 KV and LT Line North, Meerut for the Period of 01-04-2026 to 31-03-2027 (12 Months).
Carrying out various works for Maintenance and Replacement of Damaged 33KV, 11KV, LT Line due to Daviya Aapda at various places in the area of EUDD I, Mathura under the jurisdiction of SE, EUDC, Mathura
Supply of Decentralized materials Works for shiffting and dismantling of 11 KV LT line 11 KVA DTR passing over the premieses of Primary Middle Composite School under EDD Chunar Mirzapur under Deposit Scheme 2026 27
Construction of 11 KV LT line and installation of transformers of different capacities including construction of under Deposit Scheme Nivesh Mitra Portal Jhatpat Portal MP MLA Fund under Electricity Distribution Division Chunar Mirzapur 2025 26
For Shifting of 33 KV , 11 KV and LT Line for widening of Road From Ganna Mill to Rutampur Baroli, Bilari By Adhishasi Abhiyanta, Lok Nirman Khad-1, Lok Nirman Vibhag , Moradabad under Deposit Scheme
Basti Zone forConstruction of new 33/11 KV Sub-Station, Construction of new 33KV, 11KV and LT Line, renovation and other electrification works in Basti District in Uttar Pradesh under Integrated Power Development Scheme (IPDS)
Tender for Resagging of Loose Ht/Lt Line Conductor,Strenghtening Of Loose And Tilted Stay And Repairing and grouting of damaged,rusted st/pcc pole in the area of Sub-Division,Chinhut under EUDD-Chinhut
Construction of 11 KV, 33 KV and LT line for shifting of exsiting 11 KV, 33 KV and LT lineand existing transformer from Motiram Adda Chauraha, Jhangaha to Barahi, Bohabhaar Road upt0 Bohabhaar Village, Gorakhpur
Construction of 11 kv u/g lines, installation of distribution t/f /CSS and supply and erection of 11 kv RMU and laying of required LT lines for giving supply to proposed tent houses for Global Investor Summit-2023 at Sector-10, Awadh Vihar Yojana lko
Construction of Electrical Infrastruture for 11 KV supply to Mr. Hameed Khan S O Mr. Late Abdul Salam having sanctioned load 80 KW at 114 107 66,67,68 1, Naya Gaon west and Shifting of LT lines and poles for requirement of Smart City projest at kaise
replacement of jar jar wire replacement of damaged Insulators and Cross Arms in 11 KV and LT lines feeding to 44 JB STW Village Sangli fed from 11 KV feeder Senga Sengli emanating from 33 11 KV Sub Station Pipala and Providing of pole support in lo
Work of replacement of damaged conductors of 220 KV Transmission lines at different locations under ETD I, Lucknow
Work of annual patrolling, emergency patrolling and maintenance etc. at VARIOUS 400 Transmission lines under ETD I, Lucknow
DESIGN, MANUFACTURE, TESTING AND SUPPLY OF 3500 KM ACSR PANTHER FOR 132 KV TRANSMISSION LINES IN UTTAR PRADESH