Loading…
Loading…
8,704 results • Best match
IOH Kit for Rotex Magnet valve Model No.31133 to Part No.11ZP10SB01005 consisting of 21 Items as per the Annexure. Firm's offer: Make/Brand; ROTEX
Three way magnet valve to Rotex Part No. SR-3008C NW 10 with manifold pipe bracket suitable to operate on 72 V DC. Firm's offer: ROTEX
AIR VENT VALVE (DRG.NO.LG63266 ALT 'NIL' ITEM 3), as per Drawing: M/S. HANS H.VOSS TULPENWEG OR M/S. CALEFI OR M/S. WATTS INDUSTRIES ITALY.
Valve Flat for Auxilary Compressor of Locos. As per M/s. ELGI's Drg. No. 000 310 43A or KPA Drg. No. CX.3M4.1850 B, Item-1.
Valve check 1-1/4 inch to DLW Drawing No.40066424 Alt.a (or) Latest and DLW Part No.17390278 for the maintenance of HHP Diesel Locomotives.
Cleaning of silt and barnacles in valve chamber still basin discharge well and repair work of wall and side slopes in leading channel in Ash Dyke
FAVFH5152 - Machining of Yokes for FH Valves
Air conditioning, refrigerating cooling tower accessories Valves
supply of Intervalve Poonawalla make butterfly valves.
Steel Tubes, Tubulars and Other Steel Fittings as per IS 1239 (Part 2 - Steel Pipe Fittings) (Q3), Steel Pipes for Water and Sewage as per IS 3589 (Q3), Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 (Q3), Commercial CPVC Pipe Fittings (Q3), Unplasticized PVC Pipes for Potable Water Supplies as per IS 4985 (Q3)
Custom Bid for Services - CPCLV25194 Carrying out Valve servicing jobs during upcoming M&I Shutdown/Unit Shutdown jobs at CPCL, Manali Similar Category Repair and Overhauling Service Operation And Maintenance Of Other Machines And Plants
Wiper Pump 300 GPD, Magnet Valve Assembly, Gangway Sidewall Retaining Rope, SHOE BRAKE Long Travel for EOT Crane 20 By 5 ton, SHOE BRAKE Cross Travel for EOT Crane 20 by 5 ton, SHOE BRAKE Auxiliary Hoist for EOT Crane 20 by 5 ton, SHOE BRAKE Main Hoist for EOT Crane 20 by 5 ton, SHOE BRAKE Cross Travel for EOT Crane 5 ton, SHOE BRAKE Long Travel for EOT Crane 5 ton, SHOE BRAKE Hoist for EOT Crane 5 ton, SHOE BRAKE Long Travel for EOT Crane 3.2 Ton, SHOE BRAKE Cross Travel for EOT Crane 3.2 Ton, SHOE BRAKE Hoist for EOT Crane 3.2 Ton
Part of cleaning and tightness checking works of Junction boxes and Push button boxes related to Turbine side valves in plant area of Unit I, II, III for the period from 08.04.19 to 30.09.19.
All the relevant rules and regulations applicable on buyback items shall be strictly followed by the vendor Supply Of 1530AH (2V Cell Voltage) Valve Regulated Lead Acid Batteries With Stackable Modules & MS S, Supply Of 1250AH (2V Cell Voltage) Valve Regulated Lead Acid Batteries With Stackable Modules & MS S
TTPS Mech II TM II Unit IV V KWU Turbine Break down maintenance works in condenser HPBP valve LPT diaphragm in Unit IV V for the period of work on or after 08 10 2018 and upto 31 03 2019
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines column pipes and accessories of cooling water pumps discharge butterfly valves 25 5 ton EOT crane and chlorination plant available in CWPH II
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment, furnace oil pipes line, light oil pipe lines, steam pipe lines and various types of valves for the period from 08.04.2021 to 30.09.2021
TTPS Mech II AHP Unit IV V Overhauling and replacement of valves spool piece rubber expansion bellow flushing apparatus jetting nozzle etc in Unit IV V ECO APH BAH and chimney hoppers during annual overhaul 2022 2023
MTPS TM Unit I Removal of insulation and providing re insulation to pipe lines and valves Deaerator main flange gland steam cooler low pressure heater and its accessories and disposal of waste insulation materials in Unit I
MTPS I M I Circle CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre system of GTs UATs MOTs COTs and DOTs of Unit I to IV and ST I and II etc
MTPS TM Unit II Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Vent condenser Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment furnace oil pipes line light oil pipe lines steam pipe lines and various types of valves for the period from 08.04.2020 to 30.09.2020
TTPS Mech II TM I Overhaul 2021 22 Unit III Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves during overhaul for the year 2021 22
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines column pipes and accessories of cooling water pumps discharge butterfly valves, 25 5 ton EOT crane and chlorination plant available in CWPH II
TTPS Mech II AHP Unit IV Attending break down maintenance of APH and ECO hopper equipments sea water pipe line and valves in unit IV from the date of commencement of work and upto 31 03 2022
TTPS Mech II AHP Unit IV V Breakdown Overhauling of Ash Water pump, filteration plant valves etc in units IV V for the period of work on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II AHP Unit IV V Breakdown Overhauling of Ash Water pump filteration plant valves etc in units IV V for the period of work on or after 08 10 2020 and upto 31 03 2021
Repair/maint/replacement of external water supply installations maintenance of electrical pump/motor GI/CI pipe lines valves and other allied works CGRA Meenambakkam Thalakancherry and ICGAS Air Station and other areas under GE (I) (CG) Chennai
Attending leakages in Various size of Valves, pipelines and equipment in Condensate System, CPU and its Regeneration, Feed water system, Extraction system, Drip system, HP , LP Heaters, DM makeup system and Chemical dozing system, ACW Cooling wat
TTPS MechII AHP UnitI II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines column pipes and accessories of cooling water pumps discharge butterfly valves 25/5 ton EOT crane and chlorination plant available in CWPH II
TTPS Mech II AHP Unit V Attending break down maintenance of APH and ECO hopper equipments sea water pipe line and valves in unit V from the date of commencement of work and upto 31 03 2022
MTPS I BM Pressure parts Unit III Boiler Statutory inspection 2020 21 Water washing of boiler Ist and IInd pass area Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
MTPS TM Unit I Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Vent condenser Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment, furnace oil pipes line, light oil pipe lines, steam pipe lines and various types of valves for the period from 08.10.18 to 31.03.19
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines, column pipes and accessories of cooling water pumps, discharge butterfly valves, 25/5 ton EOT crane and chlorination plant available in CWPH II
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment, furnace oil pipes line, light oil pipe lines, steam pipe lines and various types of valves for the period from 08.04.18 to 30.09.18
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment furnace oil pipes line light oil pipe lines steam pipe lines and various types of valves for the period from 08.10.19 to 31.03.20
TTPS Mech II TM I Unit II Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves in Unit II during overhaul for the year 2019 20
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment, furnace oil pipes line, light oil pipe lines, steam pipe lines and various types of valves for the period from 08.04.19 to 30.09.19.
Break down maintenance works in condenser, HPBP valve, LPT diaphragm and attending high pressure steam pipe lines punctures in Unit IV and V for the period from the date on or after 08.04.18 and upto 30.09.18
NCTPS I SE MI Circle AOH COH 26 27 TM Dn Unit I II III Overhauling of motor driven angle drain valves MAL and seal leak steam line MAW valves with actuator hand operated isolation valves in seal and leak steam line AS CRH valves at deaerator flo
Operation of pump and valves for supply of construction water to Ennore SEZ STPP site from Ennore SEZ STPP pump room located in the NCTPS II premises for the period of Five Months from the date of commencement including attending leakages/damages
Custom Bid for Services - CPCLY26208 - Carrying out valve Servicing Jobs during M&I Shutdown at Refinery-3, utilities & offsites and Co-Gen PRDS at CPCL Manali (CRUDE, SRU & UTILITIES) Similar Category Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
VALVE BODY-A216 GR. WCB(920243870000 - 12000100190/05 - TDC: 0: 412/26) (Q3), BASE-A216-WCB- 9030(920245680000 - 2V903011020R/09 - TDC: 0: 412/26) (Q3), BASE-A216-WCB-9042(920245870000 - 1V904211066R/08 - TDC: 0: 412/26) (Q3), BASE-A216-WCB- 7040(920246340000 - 1V704010152R/04 - TDC: 0: 412/26) (Q3), BONNET-A216-WCB-9032(920381280000 - 2V903211013R/01 - TDC: 0: 412/26) (Q3)
TTPS MII BM Unit IV Cleaning and Painting of Safety valve silencers Vent pipes Coutant bottom enclosure structures in boiler during overhaul for the year 2023 2024
DECATHLON Hand Held Pump (Hand Pump) with Type B (Suitable for, DECATHLON Hand Held Pump (Hand Pump) with Type B (Suitable for the Schrader tube valve) Connector
TTPS Mech II TM II Reconditioning of RC Valve stem and seat ring in Boiler Feed Pump system of Unit IV V for the year 2024 25
TTPS ES Circle MRT I Annual Overhauling of turbine side valve actuator electrical portion limit switch torque switch assemblies in Unit II for the year 2025 26