Loading…
Loading…
723 results • Best match
ADDITION ALTERATION OF ENTRANCE AREA OF CGDHQ-4, PROVISION OF 03 IN NOS WATER COOLER FOR GALLEY, IN LIVING DINING HALL AND VARUNA HALL AT CGDHQ-4, PROVISION OF WALL MOUNTED FANS IN OFFICERS GYMNASIUM AT CGRA RAMESWARAM
PROVISION OF SECURITY LIGHT AROUND 7.6 ACRE LAND WATER SUPPLY TO GUARD ROOM AT PALLURUTHY, PROVISION OF WATER COOLER WITH INBUILT PURIFIER IN SINGLE LIVING OFFICERS ACCN COOLING APPLIANCES FOR TELEPHONE EXCHANGE AT DHQ 4, PROVISION OF GEYSER AT
PROVN OF ACS FOR NCN SERVER ROOM, MWDC, CLOIS ROOM AND DUTY OFFICERS ROOM AT NOIC KRL AT NAVAL BASE KOCHI, SPECIAL REPAIRS FOR REPLACEMENT OF BER COOLING APPLICANCES WATER COOLER AND REFRIGERATOR AT INS GARUDA NAVAL BASE, KOCHI
SS Rectangular Mesh Box, Split AC 1 point 5 Ton with stabilizer, Thermal Receipt Printer, Heavy Duty Paper Shredder Machine, Water Dispensers
Purchase of 3 Seat cast iron chair,water dispenser,wheelchair and led tv
Induction Heater (Q3), Coffee Dispensing Machine (Q3), hot or cold water dispenser (Q3)
SPLIT AIR CONDITIONER, Stabilizer For AC, Video Conferencing Camera, Speaker Phone, Water Purifier
Aquaguard Reverse Osmosis based Water Treatment System above 50, Aquaguard Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above100 LPH and upto 250 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
Aquaguard Reverse Osmosis based Water Treatment System above 50, Aquaguard Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above100 LPH and upto 250 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
Aquaguard Reverse Osmosis based Water Treatment System above 50, Aquaguard Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above100 LPH and upto 250 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
Aquaguard Reverse Osmosis based Water Treatment System above 50, Aquaguard Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above100 LPH and upto 250 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
Aquaguard Reverse Osmosis based Water Treatment System above 50, Aquaguard Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above100 LPH and upto 250 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
Aquaguard Reverse Osmosis based Water Treatment System above 50, Aquaguard Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
Supply, installation and commissioning of Water Cooler with Purifier (Q3)
PROCUREMENT SUPPLY INSTALLATION, TESTING COMMISSIONING OF RO+ UV+ UF WATER PURIFIER (20 LITRE STORAGE
BEST WATER DOCTOR Reverse Osmosis based Water Treatment System, BEST WATER DOCTOR Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction ... Contained Water Cooler "
BEST WATER DOCTOR Reverse Osmosis based Water Treatment System, BEST WATER DOCTOR Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction ... Contained Water Cooler "
ORIX AQUA Reverse Osmosis based Water Treatment System above 50, ORIX AQUA Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of ... Contained Water Cooler "
BEST WATER DOCTOR Reverse Osmosis based Water Treatment System, BEST WATER DOCTOR Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction ... Contained Water Cooler "
Provisions are includedPVC medium well screen pipes,e threaded mild steel cap,Bail plug,PVC pipes in various size, gun metal gate valve, long body bib cock,cement concrete,12 mm cement plaster
30x30ft camboflauge net, action camera, Voltas Water dispenser, dispenser bottle, pedestal fan, semiauto washing machine 14 kg
Corrugated sheet laying, Water purifier fixing , Providing Waste disposal , Earthwork, PCC, Solid block,Plastering, Painting , Tiling etc..
Potable water purification system Potable Water Purification System ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis based water purifier ... based water purifier Ultraviolet ... of RO system Conforming ...
Water Purifier 10 Litres, Borosil Glass Set, Thermo Steel Water Flask 1 Litre, Full Plate Set, Pedestal fan
BIOGAS PLANT, 10 LITRE TABLE TOP WATER PURIFIER, FULLY AUTOMATIC WASTE REPROCESSOR, 20 LITRE STEEL CONTAINER, INCINERATOR 50 KG
supply and fix of voltage stabilizer, Supply, installation and commissioning of water cooler with purifier
Digital X-Ray Machine 300MA, 3-Seater Steel Chair, A SCAN Machine, Auto Refractometer, Water Cooler
As per tender documents
PWD Rest House Perumbavoor
General Electrical Work
This estimate includes ramp and new flag post, painting compound walls, repair of doors and windows, providing water purifier, providing washing machines
Reconditioning / retubing of 2 nos of 240 kW Air Water Coolers( Statot Cooler) of Generating units at Sabarigiri Hydro Electric Project, Moozhiyar
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6459804 Dated : 16-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6668758 Dated : 11-09-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 7 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Facility Management Services - LumpSum Based - ICDS KOZHIKODE RURAL; SUPPLY AND INSTALLATION OF SMART TV, PA SYSTEM & WATER PURIFIERS TO VARIOUS ANGANAWADIS; Consumables to be provided by service provider (inclusive in contract cost)
Hot/Cold Water Dispenser (V2) (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6476838 Dated : 21-07-2025 Bid Document 1/7 Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6762438 Dated : 08-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Hot/Cold Water Dispenser (V2) (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6750104 Dated : 03-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split AC 1 Ton with stabilizer, 05 Seater Leather Sofa Set, Branded LED TV 65 inch, Branded LED TV 55 inch, Branded Commercial Water purifier
Hot/Cold Water Dispenser (V2) (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6624477 Dated : 29-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
item rate
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days Bid Number : GEM/2025/B/6382078 Dated : 25-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6258595 Dated : 06-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Computer Table wooden, Water Dispenser with Hot comma cold and Normal, Bar oblique Counter Chair, Red Cushion Ornate Chair, Visitor Leatherette Cushion Chair, Chair Dining Without Arms
earth work excavation for ground water tank,PCC RCC M20 concrete for base slab side wall and cover slab of water tank steel reinforcement work Centering shuttering supply and fixing 75mm 65mm pvc pipes Supply supply and fixing CI cover
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6431508 Dated : 09-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6618530 Dated : 29-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6485261 Dated : 30-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting