Loading…
Loading…
2,752 results • Best match
Fan Belt, Assy Tie Rod End, 4x4 Cable Assy, Suspension Bushing, Air Pipe line Steel and Rubber, Air Dryer Kit, Fuel Pipe, Gear Lever Rep Kit, Air Pipe Line T Type TC, Oil Seal Inner, Kit for Air Compressor, Oil Seal Hub Outer, Horn 24 V, Halogen Lamp 24V 75 70W, Fuse 20A Yellow
STAINING PIPE, IDLER SPROCKET ASSY, FEED PUMP, FUEL PIPE LINE TO TANK, STRAINING TIE ROD END, SIDE MIRROR, BRAKE SHOE, FLOOR MATING, NUT BOLT
Door Pannel Cover, Door Inner Catch Cover, Clutch Mater Assy, Sleeve Cylinder Assy, Mudguard Flap, Air Filter, Fuel Pipe Line, KM Cable, Spark Plug
Oil Pump Assy 11 KVA, Over Flow Pipe 19 Inch, Fuel Pipe Line 19 Inch, Push Rod Tube, Volt Meter BOQ Title BOQ BID
REPAIR REPLACEMENT OF EXTERNAL WATER SUPPLY INCLUDING DI CI GI PIPE LINE PUMPS AND MOTOR AND ALLIED WORKS AT BARAMULLA UNDER GE 969 EWS
PLEASE REFER TO BOQ
PLEASE REFER TO BOQ
AS PER NIT
As described in Bill of Quantities
Refer to nomenclature
Refer to BOQ
Refer to bOQ
Refer to BoQ
Refer to BOQ
Providing, Fitting, Installation, Testing and Commissioning of 05 cusec x 15 meter head raw water, split casing pumping unit with star delta starter, cables, suction and delivery pipeline with control valves along with allied works at LIS Nikowa
Extension / Augmentation of water supply facilities at Wayil Udder new Basti (Khan Mohalla) near Haider Maidan plant by way of L/F of 25/20mm dia pipeline from Haider Maidan plant for WSS Wayil Udder Gutlibagh (UT CAPEX)
Repair and Maintenance of different pumping stations, construction of pump foundations in the pump rooms for installation of New pumps and change of suction lines, delivery lines, and change of Gate valves and NRVs interfacing with existing pipeline
Laying and fitting of 100, 80mm dia GI pipeline to connect water supply line of Zeethyar and Syed Colony to 50000 Gallon S.R at Crude Filter site and construction of washout, intake for S.R Water Treatment Plant Nishat.
Reinforcement of already existing Manual Oxygen Manifold system at Sheeshnag/ Panchtarni/ Base Camp Lower Holy Cave/ Upper Holy Cave by way of SITC of additional Oxygen Points/Pipeline etc along with transportation empty/filled D type Oxygen Cyl
Suspeion bush set MG, Coolant pipe ALS, Steering vane pump ALS, Wheel stud ALS, Fan belt 1363mm 2.5 ton, Main fuel pipe line 2.5 ton
Banjo Washer, Seat Switch, Cyl Head Gasket, Assy U Joint, Hand Brake Cable, Support Tube Pipe Line, Air Pressure Pipe, Field Coil 24v, Accelerator cable
Regulator SR 60 24V, Oil Seal, Shifting Rod 4th 5th Gear, Pipe Line, Tie Rod Assy, Wheel Drum, Door Lock LH, Instrument Pannel, Oil Cooler
AIR COMPRESSOR 5 HP 500LB DOUBLE PISTON, PNEUMATIC GUN 1 INCH HEAVY DUTY WITH SOCKET, FILTER REGULATOR LUBRICATOR, PNEUMATIC GUN WITH SOCKET, PNEUMATIC PIPE LINE
Repair of Synthetic flooring size 20x27 feet, Pneumatic gun for heavy veh, Pneumatic gun for Lt veh, Pneumatic pipe line, Air gun, Adapters and Assy
As refer BOQ
Please refer BOQ
please refer BOQ
please refer BOQ
PLEASE REFER TO BOQ
Same
PLEASE REFER TO BOQ
Replacement of Existing Damaged MS Tank by way of Installation of Make-up Water Storage Tanks with MS Platform , Cross Bracing ,MS Ladder and Pipeline System of Chiller Plant of Capacity 225TRx03 nos. at Government Super Specaility Hospital Jamm
BENJO UNION 7K, FAN BELT 7K, FUEL FLEXIBLE PIPE LARGE 7K, FUEL PIPE LINE RETURN 7K, RUBBER HOSE 7K, AIR FILTER 7K, OVER FLOW PIPE 7K
Fuel Pump Assy, Thermostate Assy, Pump Adopter, Ignition Rod with Plug, Sequence Controller, Photocell, Fuel Pipe Line, Fuel Filter Assy, Bty Female Thermal Connector, MSN Connector
Thermostat Valve 2.5 Ton, Door Glass Channel ALS, Cabin Lifting Pump RAM Assy ALS, Fuel Flexible Pipe ALS, Fuel Pipe Line, Power Window Glass Lifting Machine
Oil Filter, Hydraulic Filter, Upper and lower Hose, Fuel Filter, Fuel Pipe Line 1, Rear Indicator Assy, Rear View Mirror, Battery, Front upper body lock hub
Digital Generator Controller Meter, Fuel Pipe Line, Spark Plug, Valve Cap, Oil Filter, Fuel Filter Element, Oil seal, Water Temperature, Indicator Assy, Self Solenoid, Packing Set
SPL REPAIRS/REPLACEMENT OF GI DISTRIBUTION PIPE LINE INCL CONNECTED WORK AT AREA OF FIELD REGT GRN INCL OTHER UNITS AT POONCH UNDER GE 881 EWS
Refer to BOQ
Refer to BOQ