Loading…
Loading…
6,369 results • Best match
Ernakulam District Panchayath- ARWSS to Manjalloor- Constructing a sump cum pump house and Providing water supply facilities to 30 Acre Area in Manjalloor Panchayath - Part I
DW Improving water supply to Kochi corperation Div 49 old at Njaneswara lane by supplying and laying 63mm PVC pipes and Parayail road 110mm PVC pipes
CSME Providing water supply to Sree Madhavam by laying 63mm PVC pipe in Govt High School road Changampuzha in Kochi corporation Div 34 old 38 New
Construction of Men hostel building including construction of retaining wall, UG Sump, pump house, electrical, water supply and sanitary installation works and firefighting works, elevator system.
DEPOSIT-Repair and Radiology Department Dental college-Providing storage spaces and shelves, water supply and plumbing works in dark room, conversion of current staff room into
DEPOSIT Kalamassery municipality Providing water supply arrangements to ward 17 Ponvelippadam bylane road of Anakkulam road kangarappady in relation with for the irrigation pipe line work
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SET, SUB STATION, DG SET, WET RISER, FIRE FIGHTING SYSTEM, AUTOMATIC FIRE ALARM SYSTEM, AC UNITS, STREET LIGHTS ETC AT OFFICE BUILDING AND QEL LAB BUILDING, SPICES BOARD, KOCHI DURING 2024-25. SH. MAINTENANCE OF IEI AND FANS, OPERATION OF PUMP SET, DG SET, WET RISER SYSTEM, AMC OF DG SET, SPLIT AC UNITS, SERVICING OD SUB STATION EQPT, TRANSFORMER OIL FILTERATION ETC.
Construction of Zoological Park at Puthur,Thrissur,Kerala, Phase III part 1. SW: C/o Enclosures of Giraffe, Zebra, Eland & Ostrich Exhibit, Hippopotamus, Raptors, Grassland Birds, Jackal Exhibit, Common amenities and Common roads for tram services ... internal water supply , ...
Students Activity Centre cum Health Centre at IIITK Pala, Kottayam including Internal water supply, Sanitary installation and Drainage, E & M Works like Internal Electrical Installation, Solar Water Heating, Automatic fire Alarm system, Fire fighting with wet riser system, Audio System, solar Photovoltaic power system and lift. SH: Providing manpower services to the O/o ADG, Kochi, CE,TVM & EE & SM (C) -I and attached Subdivision offices at IIIT Pala Project Division, CPWD, Pala, Kottayam.
AS PER BOQ AND TENDER DOCUMENTS
Restoration work
Please refer Tender document
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
DEPOSIT-Improving water supply to coast guard-Laying 150mm DI pipe from Karuvelippady pump house to coast guard ship support complex at Kalvathy -Part II - Road work
KLIBF 2024-Urgent arrangements of water supply and other allied civil works in connection with 3rd edition of Kerala Legislature International Book festival 2024- General Civil Work
Deposit work-RWSS to Kulathummal-Water supply line extension toKalingavilakam SC colony, Thoongapara , Vadkkevazhapalli and kanala chittilkadu SC colony and Vazhapallikonam SC colony under Maranalloor Grama Panchayath
aluminium work for sliding glass for covering grill portion,partition work with PVC kitchen cabinet foam, providing ramp,interlock tiles,painting,water supply and sanitary arrangements etc.
DEPOSIT CSME Supplying and laying of 63mm PVC pipe for providing water supply arrangements for Noel apartment near St James Thattaampady road in Cheranelloor Panchayath Pipeline Work
DEPOSIT Kochi Corporation Stadium Janatha Link road Bylane Improving water supply by laying 75mm PVC pipe in Div 35 old new 39 of Kochi Corporation Pipeline Work
dismantling tile work, providing floor and wall tiles, solid block masonry, plastering, painting walls and grills, water supply and sanitary fittings, PVC pipes, PVC door shutter etc
DEPOSIT Thrikkakara municipality Ward 9 Thrikkakara Municipality Improvement of Water supply by extending Supply and Laying pipe lines at Parlimoola road in ward no 9 Pipeline Work
DEPOSIT OF BLOCK panchayat fund CWSS to Kalippara ( RWSS toPoozhikkunnu)water supply Line extension from newly laid PerumarathinvilaManchadi line to Anganvadi line with 63 mm mmPVCpipe line
DW CSME Providing water supply arrangements for Ms Veegaland Exotica by supplying and laying 63mm PVC pipe in Subhash Nagar in Division 49 old of Kochi Corporation
jungle clearing, demolishing brick work and old plastering, dismantling doors and windows, providing brickwork and plastering, provision for electrical, water supply and sanitary arrangements, colour washing etc
DEPOSIT WSS TKK DW 2022 in ward no 8 DW Providing water supply distribution line at Ponvannmoola road Panaikalodithazham road A K G bye road Pipeline Work
KLC section 2Running Contract Urgent maintenance and repairs of sanitary water supply and petty repairs in Hon Secretary quarters Hon Deputy Speaker quarters and Hon Speaker quarters
Deposit work Piravom Municipality Line extension interconnection and up-gradation of water supply distribution network at Nedumala Shappumpadi Thachamala road reach of ward 3 in Piravom Municipality.
WSS to Aikkaranadu,Mazhuvannoor and Kunnathunadu panchayaths-Improvement of water supply to mannoor irapuram road-Laying 160 mm ,110 mm PVC along mannoor irapuram Road-Phase 2
Construction of Shopping Complex Phase I at Seethathode Pathanamthitta Civil Works and Land development Water Supply and Sanitary installations Septic Tank Fire water tank Sump Package I
Jal Jeevan MissionJJM-Jal Jeevan Mission -2020-21-Vellarada Panchayath-water Supply line extension and providing FHTC of vellarada Panchayath-Panchayath road restoration of Tar and concrete works-
Mace of RWSS to Valiyakulam, Poozhikkunnu, Virali Uchakada - Rectification of leakages in various pipe line aligned works for one year RC 2022- 23 under Water Supply Section Parassala.
MLA-SDF-WORKS-IMPROVING WATER SUPPLY TO LANGA RESIDENCE AND ADJOINING AREA SUPPLYING AND LAYING 110MM PVC FROM THURUVALLAM JN TO LANGA UNDER WW SECTION VANDITHADAM-Pipeline Work
Improvement of Water Supply to Vadakkekara and Chittattukara Replacing damaged 400 mm premo pipe with 400 mm DI K9 pipe from Municipal Junction North Paravoor to Neendoor jn1510m
State Plan State plan 2024 2025 Drinking water Drought mitigation and Emergency Works RWSS to Okkal Providing valves for regulating water supply in Okkal Panchayath General Civil Work
MLA SDF - Improving water supply by laying 63 mm PVC pipe for a length of 350 m at Kattathara Krishnan road in division 18(new) of Kochi Corporation..
vitrified floor tiles, scrapping, prime coat, wall painting, synthetic enamel paint, false ceiling, man mazdoor, water supply and sanitary fittings, aluminium work for doors, windows, pre laminated particle
Items like PCC , RCC, solid blocks masonry, plastering, painting works, plumbing works , Tile flooring. pressed steel doors and windows, water supply items etc. are included in the estimate
This estimate includes Ramps for all buildings one in each floor and one in common necessary plumbing and water supply items etc Also provisions given for urgent main
Jal Jeevan Mission Water Supply to Keezhmadu Panchayath Supply , laying 250 mm DI, 160 mm and 90 mm PVC Pipe and providing FHTCs in Edayappuram Road Reach II
Items included in this estimate are earth work excavation for laying pipes, supplying and laying of 90mm and 75mm dia HDPE water supply pipes PE 100 PN 16
Relaying pipe line under Pokkulangara bridge and providing water supply to Mannath colony and flood affected area by relaying 90 mm PVC pipe line in Engandiyur grama Panchayath
AMRUT-2.0-Improving water supply at Ponnurunni area in Kochi Corporation division no.53(new) and 31(old) by laying 160mm PVC pipe along Ponnurunni Kunjan Bava road
Deposit work of Thiruvananthapuram Corporation- Project no-S0548/22-Improving water supply by laying 75mm pvc pipe in the entrance of Ulloor Gardence (Paaravila Lane) in Ulloor Ward
CSME- Extension of 90mm pvc pipe line from Naipunya collage to east for providing water supply connection to Sri A.V Xavier, Arasar kadavil,CMC-2 in Cherthala municipality.
DEPOSIT-Kochi-Corp-Improving Water Supply in Mariyakutty John Road by laying 160 mm PVC pipe from Power house road,Div-42 (old) of Kochi Corporation-Pipeline Work
Hardening Unit (Primary and Secondary) Irrigation System for Hardening Unit Compound wall Laying of paver blocks Entrance gate and Security cabin Provision for open well and water supply
State Plan 2025 2026 RWSS to Paingottor pipe line replacement of existing damaged GI pipe of Providing water supply arrangement at various ward of paingotoor panchayath Pipeline Work
oviding FHTCs-Pipeline work
provisions Given in the estimate are Removing blockages from sewer manhole of depth 60cmand120cm removing blocks from bathroom trap water closetetc