Loading…
Loading…
6,373 results • Best match
Solid block masonry plastering scrapping priming coat painting ceramic glazed wall and floor tiles false ceiling vitrified floor tiles aluminium partition works water supply works MS grill steel work for truss GI sheet roofing RCC 1 1 5 3
DEPOSIT-Improving water supply to coast guard-Laying 150mm DI pipe from Karuvelipady Pump house to Coast guard Ship support complex at Kalvathy Part 2 - PWD road restoraion estimate with Morth specification from Beach road jn to Fort Ko
DEPOSIT-CSME-Name of work- Deposit work-CSME- Providing water supply connection to Anta Builders amp Developers,Vivekanandah road and SFS Haveli Apartments at Haritha road, Vennala, by laying 90 mm, 75mm amp 63mm PVC pipe in Division no46
Laying of 90mm PVC for a length of 450m from Elders Forum Road to Giri Nagar 8th cross road for improving water supply in Giri Nagar 8th cross road and Kariumpurath road in Division 27 Old of Kochi Corporation
CSME Providing water supply connection to Sri Muhammedkutty alias Mammootty and Sulfath Ambelippadam lane 6 Vyttila from the existing 160 mm PVC pipe linein SA road through Ambelippadom road in div no 31 old 53 new of Kochi Corporation
This work is replacing the existing damaged PVC pipe of 210m in Sasthri road with a 75 mm PVC pipe. The work also includes changing of water supply/PH connections from the existing line to the newly laid line
Maintenance work
Maintenance works
Maintenance Work
RWSS to Arakunnam Renovation of water supply to Arakunnam Harijan Colony in Mulamthuruthy Panchayath Supply erection commissioning of 2 Nos of CF pumpset having discharge of 6 LPS against a total head of 75 m in the Arakunnam Pump House
Deposit work Coast Guard Improving water supply to Coast Guard supplying and erecting transformer 11KV and main HT panel 630KVA Dry type transformer HT metering cubical panel with CT PT HT TOD meter SSB 2 panel incomer 800A TPN isolator
DW.District Panchayath-improving water supply to Arikuchiira by laying 90 mm OD HDPE pipe (PE100. PN10) From Muthukupuram near Kondai Lip Resort to Arikuchira along Alumchira Kayal for a length of 1050 m and along Panchayath Thodu for a length of
This work is a composite work The provisions included in the work are painting Patch plasteringCC 1 2 4water proofing vitrified floor tile ceramic floor and wall tile water supply and sanitary fittings truss work GI Sheet rectification of ceil
This is a composite work and that includes the Construction of Toilet block It is a load bearing building R C C Roof Solid block masonry Vitrified tileflooring and necessary water supply sanitary and electrification etc included in this work
AMRUT Kochi Municipal Corporation Balance works Replacement of damaged pipe lines and water supply service connections at Fort Vypin area in Division no.1 of Kochi Municipal Corporation and replacement of old 100 HP Motor Pump set at Puthuvypu Pump
The work is a composite work which includes Two classrooms ofsize 610X 610 m one stair room a verandaha toilet block It is a framed structure The provision Given are all civil works including finishing works Sanitary water supply Electri
DW Urban Agglomeration Project Laying 110 mm PVC pipe for improving water supply at Mulavukad North End Lying 90 63 mm PVC Pipes at various wards in Mulavukad Panchayath Supply and erection and commissioning of clear water pump set at Panambukad
HSS lab block (G plus 2), Vertical expansion of HSS classroom block (1st and 2nd floor), Kitchen and Dining, Vertical expansion of HS block (1st and 2nd floor), RCC Retaining wall, Sump tank, Septic tank, external water supply, Electrical works
KIIFB Deposit of Hill High way RWSS to Parassala Relaying of water supply pipe line on the both sides of proposed Highway from Parassala post office Junction to Palukal CSI Church and Kannamoodu manure shop to Puliyoorsala jn Pipeline Work
OM Water Supply SchemesRWSS TO MYNAGAPPALLY PANCHAYATHReplacement of Old damaged75mm PVC Pipelinefrom south of Thondappuram Jn. to west Near Post no. MPY/KR/181/22/4 to Post no. MPY/KR/262/7/1 in Ward No.13- Pipeline Work
OLIVE BUILDERSSupplying and laying of 63mm PVC pipe for providing water supply arrangements to Olive O u r a n i a i n D i v - 3 6 - O L D N H 1 7 - Kunnumpuram Kochi corporation Pipeline Work
This work is for laying a 63mm PVC pipe along the bylane of the 12th crossroad near Raghava stores in Division 27 old of Kochi Corporation. This work consists of laying 63 mm PVC pipe, interconnection, changing Water Supply connections etc.
AS PER BOQ AND TENDER DOCUMENTS
Maintenance Work
Maintenance work
clearing grass, clearing the jungle including uprooting, labour engaged for cleaning the quarters premises, including clearing the biological waste such as the dead body of monkeys, dogs, cats or other animals and birds etc.
Maintenance work
AS PER BOQ AND TENDER DOCUMENT
area and providing 1310 FHTCs under KWA Scheme area -Pipeline Work
AS PER BOQ AND TENDER DOCUMENT
AS PER BOQ AND TENDER DOCUMENT
AS PER BOQ AND TENDER DOCUMENT
DW- Kochi Corporation-Improving water supply by laying 90 mm PVC pipe (6 Kg/sq.cm) for a length of 250 m and 75 mm PVC pipe for a length of 220 m at Sanakan road in div.15 (new) of Kochi Corporation
Providing water supply connection to Govt Technical High School Kulathoor including supply and fixing of water tank having a capacity of 750 litre (3 Nos) Double coat ISI marked supplying and laying for pipe of diameter 50mm for a length of 10m
The estimate for the pipe line extension and improving water supply in various wards or areas of Ottapalam municipality. The scope of this estimate contains the line extension with 75mm PVC, 90mm PVC, 65mm GI, 80mm GI pipes in Ward 24 to 36
DW2021 Kochi Corporation Extension of 450 mm DI pipe with 200 mm DI pipe to world bank tank for improving water supply to vennala area and making by pass arrangement for vyttila pumping main interconnecting 500 mm DI at Thammanam pump house
Deposit work-CSME- Providing water supply service connection to LATERRA, Vennala, Ambedkar road from existing 160mm PVC pipe line in Vennala HS road through Kitco garde road, BCG Road and Ambedker road in division No.33(old)42(new) of Cochin corporat
DW Improving water supply to Rail Nagar area by replacing the old and damaged 63 mm PVC pipe with new 63 mm HDPE pipe at Palathuruth Canal to Rail Nagar Div No 54 new part of Div No 31 old of Kochi corporation
BLOCK Pt. Improving water supply by laying 75mm 63mm PVC pipe 6 kg per cm2 and shifting connections from old pipe line to new pipeline in Ward 1 and 2 of Kadamakudy Panchayath 4cent Colony ward 1 and Chariyamthuruth Ward 2 Pipeline work
Cheranalloor Panchayath KCK Road Bylane Supplying and laying of new 90 mm PVC pipe 6kgpercm2 in KCK Road ward 10 and new 63 mm PVC Pipe 6kg percm2 in KCK Road Bylane ward 10 for improving water supply in Cheranalloor Panchayath Pipeline Work
DW CSME Kochi Corporation Providing water supply service connection to Ms Priya A S Building No 34 2518 E old 38 3528 C New managing Director Dream Flowers Housing Projects P Ltd Thampurattiparambu road by supplying and laying 63 mm PVC pip
Deposit work of Corporation Improving water supply to Edakochi Kannangat,Palamattom areas by replacing the 200mm HDPE at Pashnithodu bridge with 315mm HDPE pipe for a length of 150m and 350mm CI pipe at approach road with 350mm DI pipe for a length
DW Improving water supply to Kochi corporation Div 49 old 34 new replacing 90 mm PVC pipe for a length of 30 m and supplying and laying 63 mm PVC pipe for a length of 92 m at Makkaparambu and Mulakkayil lane
E Tender for proposed construction of branch office building at THODUPUZHA under KOTTAYAM DIVISION including piling builders work modernization upply of chairs water supply sanitary installation lift AC installation Down comer fire system solar PV plant and electrical installation and other ancillary works