Loading…
Loading…
3,386 results • Best match
Improvement to balance portion of water supply system, drainage system & provision of water storage tanks etc at railway colonies of Palasa, Mandasa Road, Sompeta & Ichchapuram in Khurda Road Division.
Renovation of Executive flat complex, Sec 4, boundary wall & development of Park under the work of Various Civil, Electrical, Water Supply, Horticulture, Hospitality jobs required for Hockey World Cup 2023 and other jobs in Steel Township at Rourkela Odisha
Desilting in Right Main canal from RD 70mtr to RD 8135.00mtr and maintain in proper condition for Rabi Irrigation throughout its Water supply period of Rajua Diversion Weir Project
Construction of 1000 Capacity Boys Hostel (G plus 6) at NIT, Rourkela (Odisha). SH- Construction of Temporary Office building for CPWD at NIT, Rourkela (Odisha) including Internal water supply, Sanitary Installations and Electrical Installation etc. ... including water supply , ...
Supply and laying of water supply pipe line from main source to reserve chamber point for Upper Jagar of GIOM in the district of Kendujhar. (Under CSR Scheme). (Re-Tender)
Construction of Paver Block Road From 1- Kudopali water supply road, 2- dandeipali village road, 3- Siba pradhan house to Bhagirathi Khadia house at Themra W.No.39 under SMC Sambalpur.
Annual drinking water supply through water for Naik sahi,Hensmul High school, Heensmul Rehabilitation site, Dera harizan sahi and Ragadi Sahi etc. of Ananta OCP,JA for 02(two) years.
Repair and Replacement of overhead tank of 76 quarters at Sector-2 and 48 quarters at Barabati along with water supply line of Daitari township in the district of Keonjhar.
REPAIR REPLACEMENT OF INTERNAL WATER SUPPLY SUNKEN TREATMENT ROOF TREATMENT AND REPAIR MAINTENANCE OF CORRODED GI CI PIPE LINES TO DI PIPE LINE INCLUDED CONNECTED ITEMS UNDER GE I GOS
Drinking water supply through water tanker to different villages of BRJN Municipality Area under IB Valley Area for the year 2022 during summer season for 75 days (under CSR head)
Running and Maintenance work of plumbing and water supply only labour in Office building Guest house Security barrack and inside premises at MCL Bhubaneswar for a period of two years
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron K-9 Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Nayagarh Municipality (Rising main)
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron (K-9) Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Dasapalla NAC (Rising main)
Implementation of 24 x 7 water supply-under Sujala at VSS Nagar in Ward No.11 and 17(Part), BMC, Bhubaneswar for the work repair and replacement of House Connection
Laying of clear water distribution pipe line, Construction of GSR, pump houses and pumping machineries for Zone-1, in connection to the work Improvement of Water Supply to Titilagarh Town
Laying of 100mm and 150mm dia water supply pipeline in Kalarahanga Market, Kela Sahi and Injana Road and its adjoining uncovered areas Kalarahanga in Ward No-02 of BMC, Bhubaneswar
A/R to P. Canal from RD 32.082 Km to 36.850 Km and its off taking Disty. canals of this reach for Khariff water supply for the year 2024-25
Supply, Installation, Testing Wiring and Commissioning of salient type stand alone DG set of different capacity for head works, WTP, GSR site for Implementation of water supply to Dasapalla NAC
Laying of 150mm and 100mm dia Water Supply pipeline in Patia Hospital Road and Mahavahu Lane, Ashrivad Plaza, opposite side of Patia CHC in Ward No-3 of BMC, Bhubaneswar
Provision for external and internal electrification work supply and installation of pump sets and construction of boundary wall in connection with Improvement of water supply to Brajrajnagar Town Phase II
Laying of clear water distribution pipe line in uncovered areas of different Wards 13 15 16 and 17 of Belpahar Municipality for Universal coverage of water supply under DMF funds
Network Improvement for Implementation of Drink from Tap with 24x7 water supply to zone No-35 (227KL) at Badambadi ward No-44(P) and 45(P) CMC, Cuttack under SUJAL
Procurement of Pump for replacement of old pump including embankment protection Improvement of approach Road Provision of compound wall for Sagada KB Palla WTP for water supply to Bhawanipatna town
Provision for Pump House and Pump set with other arrangements at Dumerpada in connection with the work Improvement of water supply to Dumerpada and Dengsargi area under WATCO Section Bareipali
Day to day maintenance works of existing water supply and sanitary works for a period of 120 days at Jagannath Colony and Balanda colony of Jagannath OCP under Jagannath Area.
Drinking water supply through water tanker to different villages of Brajrajnagar Municipality Area under IB Valley Area for the year 2023 during summer season for 75 days (under CSR head)
Laying of pipe line for water supply to uncovered area of Ananda Nagar, Swasti bihar, Danda road, Kainthapolia, Kalpana Das lane, Banamaliprasad , Anadabazar and Chandia sahi , Kunjakanta of Dhenkanal Municipality
Day to day Maintenance of water supply and sanitary works of all Non-residential Buildings at Mines site of Ananta OCP under Jagannath Area for a period of 730 days.
Supply of ISI Marked DI K7 Pipes for different Pipe Water Supply Projects under State Plan BASUDHA 2020_21 in Balangir Municipality Tusura NAC Titilagarh Municipality Kantabanji NAC and Patnagarh NAC
Laying of CWRM distribution of pipe line and other ancillary works for augmentation of water supply to Purusottampur NAC under AMRUT 2.0 (SWAP-III)including 5years operation and maintenance cost.
Special repair to water supply, sanitary installation and sewerage disposal system of the Administrative building of Directorate of REGIONAL INSTITUTE OF PLANNING, APPLIED ECONOMICS AND STATISTICS, ODISHA, BHUBANESWAR. (Administrative Building)
Laying of clear water distribution pipe line, Construction of GSR, pump houses and pumping machineries for Zone-2 in connection to the work Improvement of Water Supply to Titilagarh Town
Provision for Design Construction Testing and Commissioning of the GSR including ancillary works BohidarNuapali in connection with the work Improvement of water supply to BohidarNuapali area under WATCO Section Bareipali
Improvement of Water Supply to provide safe and clean drinking water conforming to Drink from Tap Quality to Vyasanagar, Keonjhar, Anandapur, Joda, Champua and Barbil on EPC Contract (Package-I)
Construction of Paver Block Road From 1- Kudopali water supply road, 2- dandeipali village road, 3- Siba pradhan house to Bhagirathi Khadia house at Themra W.No.39 under SMC Sambalpur.
REPAIR REPLACEMENT TO PIPELINES PUMPSETS PANELS DEVELOPMENT OF BOREWELLS CLEANING OF TANKS AND EARTHING AT WATER SUPPLY INSTALLATIONS AT LC AREA AND SITE A B AND C AT ITR CHANDIPUR
Replacement of drinking water supply pipe line inside HEMM work shop, DG room, Conference hall, Time office, Safety office, Canteen at different location Hingula OCP Under Hingula Area.(Re-Tender)
Sinking of production well, construction of OGR and Extension of water supply to uncovered area at Banamali Prasad, Acharya Bihar and adjoining area in ward No -9 of Dhenkanal Municipality
Drinking water supply through water tanker to different villages of BRJN Municipality Area under IB Valley Area for the year 2020 during summer season for 75 days(under CSR head).
REPAIR AND MAINTENANCE OF INTERNAL ELECTRIFICATION AND EXTERNAL ELECTRIFICATION WATER SUPPLY DG SETS AND COOLING APPLIANCE PUMP MOTORS AND CONNECTED WORKS AT CGRA COMPLEX AND OTM ACCN AT ICGS GOPALPUR
C/o MT Garages, Workshop, Office Block i/c toilet with peripheral development including internal water supply, sanitary installation, external Serivices, internal electrical installations at 202 CoBRA, Sunabeda, Koraput, Odisha.
Providing water supply, repairing and coloring of Raghuji temple, fencing, installation of temporary toilet, renovation of Gupta Ganga and moorum spreading on peripheral road on occasion of Vyasa Mahostav 2019
Running and Maintenance work of plumbing and water supply only labour in Office building Guest house Security barrack and entire premises at MCL Bhubaneswar for a period of two years
Laying of clear water distribution pipe line in uncovered areas of different Wards 13 14 and 17 P of Belpahar Municipality for Universal coverage of water supply under DMF funds
Construction of MBR, laying of CW feeder main Distribution line and other ancillary works in connection to the improvement of water supply to Kodala NAC under AMRUT 2.0 (SWAP-III)
Fixing of MS pipe line for interconnection to Loading and Distribution Line Dhankauda area in connection with the work Improvement of water supply to Dhankaouda area under WATCO Section Bareipali
Design, Drawing, Construction, Testing and commissioning of 4.0 lakh ltr capacity GSR and sinking of production well at Ashrampada ward no. 14, Kantabanji NAC for Universal coverage of water supply.
Road cutting through Horizontal Directional Drilling method for Implementation of Drink from Tap and 24x7 water supply to Niccopark area, Unit-IX Road zone area, Madhusudan Nagar and Kapileswar, BBSR
Procurement of DI pipe for the work Construction of ESR and other ancillary works in connection with work augmentation of water supply system along with ancillary works for Balangir town.
M/R to all Distributaries, Minors and Sub minors of P. Canal in between RD 15.300 Km to RD 33.182 Km during Kharif water supply for the year 2026-27