Loading…
Loading…
3,386 results • Best match
Prevention of Roof leakage of residential quarters public buildings in Steel Township, under the work of Various Civil, Electrical, Water Supply, Horticulture, Hospitality jobs required for Hockey World Cup 2023 and other jobs in Steel Township at Rourkela Odisha
Supply of labour for watch and ward to river embankment and canal system during khariff water supply period under Balikuda Irrigation Sub-Division for the year 2024-25
Sinking of production well and installation of higher capacity pump set for water supply to Akasguda at Koraput under State Plan, D.No.13-4215 for the year 2019-20
Providing and laying water supply pipe, over head tank with distribution arrangement for community center near Siva Mandhir of village Solada at Balram OCP under Hingula Area.(Re-Tender)
Supplying and laying of 90mm HDPE pipeline for rising main and distribution system for interconnection with existing distribution line etc. for water supply to various locations of UIHEP, Mukhiguda.
CONVERSION OF BARRACK INTO APM AND AFM OFFICE BY MAKING ALUMINIUM PARTITION AND MAKING OF A NEW TOILET BLOCK WITH PROPER SANITARY AND WATER SUPPLY SYSTEM AT KOCP,KA
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron (K-7)Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Ranapur NAC (Distribution)
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron (K-7) and K-9 Socket and Spigot Pressure Pipes required for the work of Water supply to Odagaon NAC
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron (K-7)Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Dasapalla NAC (Distribution).
Construction of UGR, laying of clear water rising main, installation of pump set and other allied works in connection with the work Augmentation of water supply to Tusura Town.
Shifting of water supply pipe line for Improvement and Up gradation of road from Kanak Manjari Chowk to Airport from Double Lane to Four Lane at Rourkela under Deposit
Provision for Pump House and pump set with other arrangements at Dhankauda area in connection with the work Improvement of water supply to Dhankaouda area under WATCO Section Bareipali
Repairing , replacement of pipe line for water supply system and repair of Internal Electrification work of 100 seated STGH and PSH building of kumbhirmundi Ashram School under Bahalda Block.
Laying of CWRM and distribution pipe line in connection to the improvement of water supply to Digapahandi NAC including 5 years Operation and maintenance under AMRUT 2.0 (SWAP-III)
Water Supply to R and R Colony Village Jamda of Additional Spillway Project Hirakud Dam Phase II Laying of clear water rising main distribution pipe line and house connection
Improvement of water supply to Chatrapur with construction of storage reservoir and network connection at Rikapalli, R.P line, upper Bus Stand and adjoining areas under State Plan 20-21
Implementation of 24x7 water supply to Prasanti Vihar KIIT DMA of BMC ward No-1, Bhubaneswar under SUJAL (Supply , installation, Testing, commissioning of Chlorination system, Automation and Instrumentation System)
Creation of spot source, construction of OGR and laying of pipe line including ancilary work for water supply to Gobindabereni in ward no-6 of newly created Hindol NAC.
PROVIDING SERVICES FOR OPERATION AND MAINTENANCE OF WATER SUPPLY AUTOMATION SYSTEM AND VARIOUS VALVES ETC AT DISTRIBUTION NETWORK AT JATIA HILL SERVICE RESERVOIRS AT INS CHILKA UNDER GE CHILKA
Improvement of source including procurement and Installation of 63 KVA D.G Set with ancilary work at Manipur Head works of Bhuban for improvement of water supply at Bhuban NAC
Annual Drinking water supply through tanker for Naik Sahi, Hensmul High School, Hensmul Rehabilitation site, Dera Harizan Sahi and Ragadi Sahi etc. for Ananta OC Project for 02 years
Construction of Compound Wall for provision of Drink from Taps and 24x7 Water Supply to Ward No-01,02,03,20,21 and 22 of Jemadei and its adjoining areas of Khordha Town
Installation of 20MLD (10 MLD Plus 10 MLD) water Treatment Plant at Dakhinapur Head work site for Improvement of Water Supply to Berhampur Town under AMRUT-2.0 (SWAP-III)
Construction of Check Dam over commissioned pipe water supply near village Sainipada in Sainipada GP of K.Nuagaon Block of Kandhamal district under A.D.P Scheme for the year 2022-23
EXECUTION OF RURAL P IPED WATER SUPPLY TO VILLAGE SANAKUMARI PH-01 OF KHANDA G.P UNDER UMARKOTE BLOCK IN THE DISTRICT OF NABARANGPUR INCLUDING 5 YEARS O and M.
Provision for laying of pipe line by Horizontal Directional Drilling method from Ashoknagar to Bapujinagar for implementation of Drink from Tap with 24x7 water supply to Bapujinagar area, Bhubaneswar
Provision towards laying of 100mm, 150mm and 200mm dia water supply pipe line in Sai temple and adjoining area and Janata Maidan in Ward No.-12 of BMC, Bhubaneswar
Supply, Installation, testing and commissioning of the 82.5KVA DG Set with AMF Panel at DG installation pumping stations under WATCO Division-I, Bhubaneswar for Implementation of 24x7 water supply
Improvement of water supply to Polosara NAC including laying of dedicated pipe line from Forest Range Office to Langaleswar Pump House in Polosara NAC under State Plan 20-21
Floor Improvement and New Painting with Sinking of One Tube Well with Water Supply System for ISO to 100 Seated STGH of Manida SSD High School under Rasgobindpur Block
Design Drawing Construction Testing and Commissioning of 2.0 lakh Ltr Capacity GSR 2nos with ancillary work at Singlepada and Womens College Kantabanji NAC for Universal Coverage of water supply.
Water supply, sewerage disposal and sanitary installation of staff Quarter flat type (2 block of 4 quarter x 2 storied) for PH Division, Angul under State Plan (BASUDHA) Angul
Regular maintenance of water supply pipe line and plumbing work including miscellaneous works as and when required at Hingula OCP under Hingula Area. (For a period of 730 days).
M/R to all Distributaries,Minors and Sub minors of P.Canal in between RD 15.300 Km to RD 33.182 Km during Kharif water supply for the year 2025-26
Drinking water supply through water tanker to different villages of BRJN Municipality under IB Valley Area for the year 2021 during summer season for 75 days under CSR Head.
Design and Installation of Water supply system at Kurmitar residential colony on turnkey basis in the district of Sungargarh along with one year operation and maintenance of the system.
Day to day maintenance of Water Supply and Sanitary works of all Non-Residential Buildings at Mine site of Ananta OCP under Jagannath Area for period of two years.
Construction of Tourist Infrastructure Facilities comprising of Building, Interior, Electrical, Plumbing, Water Supply, Horticulture and Landscaping Works etc. at Anantashayan Vishnu Temple - Dhenkanal and Kapileshwar Mahadev Temple Hatuari, Odisha
Supply, Installation, testing and commissioning of the 82.5KVA DG Set with AMF Panel at DG installation pumping stations under WATCO Division-I, Bhubaneswar for Implementation of 24x7 water supply
Supply, Fitting, Fixing and Commissioning of 3.3KV Grade Soft Starter for HT 250 KW Motors at 6 MGD Water Treatment Plant, Palasuni, Bhubaneswar for improvement of 24x7 water supply
Provision for Replacement of old damaged MS pipe by DI pipe for strengthening of water supply distribution net work including reconnection of House Connection at Tapobana Lane basti, Bhubaneswar
Provision for Pump House and transformer with other arrangements at Kainsir in connection with the work Improvement of water supply to Kainsir and Singhpali area under WATCO Section Bareipali
Procurement of 100mm to 600mm dia size D.I pipes in connection with the work- Improvement of water supply to Chatrapur NAC and Phulbani Municipality under AMRUT 2.0 (SWAP-I)
Supply of ISI Marked Centrifugally Cast (Spun) Ductile Iron (K-7) and Socket and Spigot Pressure Pipes required for the work of Improvement of water supply to Pipili NAC
Supply of ISI Marked Centrifugally Cast (Spun) Ductile Iron (K-7) and Socket and Spigot Pressure Pipes required for the work of Improvement of water supply to Nimapada NAC
Installation of pump set, PLC compatible incoming and out going control panel, DG set for Implementation of Drink from Tap and 24x7 water supply to Kharavelanagar, BBSR-under SUJAL
Improvement of water supply and source development at Amlipali and Kapasila road in Padampur NAC including construction of production well and its ancillary work for the year 2020-21
Construction of R.C.C Supporting Pillar and Laying of 1000 mm dia MS Pipe Clear Water Rising Main at Kathajodi Site for Improvement of Water Supply System to Cuttack City
Construction of ESR and laying of Distribution system Including Automation work to Different Zones for 24X7 water supply to Jharsuguda Municipality Including O and M period of 5 Years