Loading…
Loading…
3,386 results • Best match
Provision for Shifting of Water Supply and Sewerage disposal utilities including construction of 300user Septic Tank for construction of Road widening and community Infrastructure area adjacent to ISBT, Baramunda, Bhubaneswar
Procurement of 100 mm to 300 mm D.I size pipes in connection with the work - Improvement of water supply to Digapahandi NAC and Baliguda NAC under AMRUT 2.0(SWAP-III)
Provision of IBPS including Piping arrangement for Water supply to Ratanpur Gorlapada isolated Habitation in ward No-12 under Dharamgarh Ulb.- under Special Central Assistance for the FY 2022-23
Pipe Water Supply
Desilting in Left Main canal from RD 0.0 mtr to RD 7250.00mtr and maintain in proper condition for Rabi Irrigation throughout its Water supply period of Rajua Diversion Weir Project
Renovation of Main Hall of Rourkela Club under the work of Various Civil, Electrical, Water Supply, Horticulture, Hospitality jobs required for Hockey World Cup 2023 and other jobs related to safety welfare of employees required enhancing quality of life in Steel Township at Rourkela Odisha
Bed Clearance on Kakharuni Minor, Kharianta Minor, Baipada Minor, Amber Minor, Similia Minor, Disty.no.2 Disty.no.2 (A) Disty.no.2 B and Minjauni Minor of G.E.Canal for Khariff water supply.
Water supply to newly developed Tareni Nagar (Ward No-22), Sarasahi, Station Bazar and adjoining area of ward No-21 of Dhenkanal Municipality under State Plan for the year 2020-21.
Creation of spot source, Construction of OGR and ancillary work for water supply to newly created area at Chandiasahi and East Kunjakanta, Sriram Nagar in Ward no-03 of Dhenkanal Municipality.
ENGAGEMENT OF FITTER, HELPER TO FITTER, PLUMBER, HELPER TO PLUMBER, ELECTRICIAN, NIGHT WATCHMAN AND PUMP HELPER TO THE WATER SUPPLY SYSTEM, UIDC, AT KHATIGUDA FOR TWELVE CALENDAR MONTHS THROUGH SERVICE PROVIDER
Laying of pipe line including storage and ancillary work for water supply to uncovered area of Kumurda and adjoining area of Bhuban NAC under State Plan for the year 2019-20.
Augmentation of water supply at different locations like Naba Mishra Colony, Badadanda Sahi Block Colony,Surya Nagar, Sarathi Vihar and Biradarpada Areas of Talcher Municipality under Central Assistance Scheme 2022-23
Repairing of lower and middle settling tank, repairing of 03 nos. of pump house and construction of approach road to pump house no. 03 of water supply system of BHEP, Balimela
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron K-9 Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Ranapur NAC (For rising main)
Supply of ISI Marked Centrifugally Cast(Spun) Ductile Iron (K-7) and K-9 Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Khandapada NAC
Procurement of Programme logic controller (PLC) panel, Flow Meter, Control Valve, Altitue valve, Chlorine Analyzer etc for with 24x7 water supply to different 8nos of DFT zones under WATCO-II, BBSR
Procurement of Programme logic controller (PLC) panel, Flow Meter, Control Valve, Altitue valve, Chlorine Analyzer etc for 24x7 water supply to different 20 nos of DFT zones under WATCO-II,BBSR
Laying of CWRM pipe line in connection with Sharing of drinking water from RWSS for water supply to Digapahandi NAC under State Plan BASUDHA for the year 2023-24/2024-25
Special repair to water supply, sanitary installation and sewerage disposal system of the Administrative building of Directorate of REGIONAL INSTITUTE OF PLANNING, APPLIED ECONOMICS AND STATISTICS, ODISHA, BHUBANESWAR (Old Hostel Building)
Construction of Chlorination Room and Toilet Room including Yard lighting and site development work for Implementation of 24 x 7 water supply to Jagatpur Ward No.49 , CMC Cuttack - under SUJAL.
Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Socket and Spigot Pipes required for the Work Development of additional infrastructures for achieving universal coverage of water supply to Rairakhol NAC
Roof Leakage Treatment, Renovation of Toilet and Water Supply , Reconstruction of Compound Wall with Campus Beautification for ISO to 200 Seated (Twin) STBH Nalagaza Govt. (SSD) High School under Rasgobindapur Block
Installation of Flow Meter, Flow Control Valve for Implementation of Drink from Tap with 24 x 7 water supply to Ward No. 56(P) CMC, Cuttack under SUJAL. (DMA-I) Pratapnagari
Procurement of 200mm, 250mm, 500mm dia DI K-7, K-9 pipe in connection with the work Reach-2-Augmentation of water supply system along with ancillary works for Balangir town
Supply Erection Testing and Commissioning of barge mounted pump sets at Chadarama in connection with the project Improvement of Water Supply to Belpahar and Brajrajnagar Municipality with Hirakud Reservoir as source
Sinking of production wells, construction of storage reservoir with pumping arrangements and laying of pipeline in uncovered areas for improvement of water supply to Buguda NAC under State Plan 20-21
Installation of Flow Meter, Flow Control Valve for Implementation of Drink from Tap with 24 x 7 water supply to Gopalpur Ward No. 57, CMC, Cuttack under SUJAL. (Pratapnagari-DMA-II)
Provision for shifting of 150mm water supply pipe line from Nuagan sqr. to Gothapatana near ROTI for Improvement of road (4-lanning) from Nuagan to Kateni, under WATCO Section Ghatikia, Bhubaneswar
Provision for laying of 110mm dia HDPE pipe in additional area Ward No 6,7,9,10,11,12, 14 at Nuapada NACin connection with the work Improvement of Water Supply to Nuapda Khariar Road NAC
REPAIR MAINT OF WATER SUPPLY PUMP SETS CLEANING OF OVERHEAD TANK RESERVOIRS AND UG SUMPS AND CERTAIN INTERNAL ELECTRIFICATION WORKS AT ACCNS OF EMU AND PXE UNDER AGE EM I CHANDIPUR
Providing, laying, testing and commissioning of D.I. (K-9) pipe in newly developed uncovered roads of Ramdaspur Industrial Estate for Water Supply to new units at Arilo, Govindapur Mouza, Baranga, Cuttack.
Infrastructure Strengthening (rest shed building/Extension of PHC Building/ dead body room/water supply /compound wall/construction of approach road and drainage) building at Brahmangaon PHC under OMBADC for 2019-20.
REPAIRS MAINT TO INTERNAL WATER SUPPLY PIPE LINE, DOORS WINDOWS SEWAGE LINE DRAIN MANHOLES CLEANING WATER TANKS AND CERTAIN MISC WORK TO CERTAIN BLDGS AT KALINGA DWAR UNDER GE I GOS
Provision of 11KV dedicated feeder for power supply to Bharamarpalli pump house in connection with the work Improvement of water supply system of ward No. 10,11 and 12 of Binika NAC.
Laying of Clear water rising main pipeline and distribution pipeline including5years operation and maintenance in connection with the work-Improvement of Water Supply to Ganjam NAC under AMRUT 2.0 (SWAP-II)
Construction of 1 00 lakh litre capacity RCC UGR including replacement of old distribution Pipeline near Kalyan Mandap pump house for improvement of water supply to Shakti Nagar area, Bargarh Municipality
Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Socket and Spigot Pipes required for the Work Development of additional infrastructures for achieving universal coverage of water supply to Attabira NAC
Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Socket and Spigot Pipes required for the Work Development of additional infrastructures for achieving universal coverage of water supply to Kuchinda NAC
Supply, Installation, Testing and Commissioning of the 11/0.433KV, 3 phase, 50HZ, 100KVA copper wound, oil cooled Transformer at Chandrasekharpur under WATCO Division-I, Bhubaneswar for Implementation of 24x7 water supply
Supply of ISI Marked DI K-7 and K-9 pipes for different pipe water supply projects under Special Central assistance 2022-23 in Balangir Municipality, Tusura NAC and Patnagarh NAC.
Provision for Design Construction Testing and Commissioning of the GSR including ancillary works at Gadmunda in connection with the work Improvement of water supply to Gadmunda area under WATCO Section Bareipali
Supply Installation Testing and Commissioning of Centrifugal Pump sets at Intake Pump House on Bargarh main canal for water supply to Biomass Ethanol Plant of Bharat Petroleum Corporation Ltd BPCL Bargarh
Provision for Pump House and Pump Set with other arrangements at Mundoghat and Potapali in connection with work Improvement of water supply to Mundoghat and Potapali area under WATCO Section, Brookshill
Installation of pump set, PLC compatible incoming and out going control panel, DG set for Implementation of Drink from Tap and 24 x 7 water supply to satyanagar, BBSR-under SUJAL
House connection for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-5 at Bidanasi Ward no-1 (P) AND ,2(P) CMC, Cuttack under SUJAL
Construction of Additional 100000 ltrs capacity over head tank and pipe laying for water supply to village Tankidadar and Bandhapada habitation of village under Nuapada Block in the District of Nuapada.
Replacement of damage spares and supply , fixing new spares with machining 2 pump to input suction pipe with Valve at Mine No. 2 Raw water supply to Adarshnagar Colony at LOCP
Execution of roads and drains, external internal sewerage, water supply system, electrification, interior works including false ceiling, HVAC and other allied works for Construction of State Forest Academy at Bhubaneswar, Odisha
Regular maintenance of water supply pipe line, Plumbing works and minor repair of buildings works as and when required at Balram OCP under Hingula Area (For a Period of 02 Years).
Repair and renovation of water supply line to field in 80mm GI pipe with necessary chamber from gate no. 3 towards boundary wall near parking shed in CCBF campus, CCBF, Chiplima.