Loading…
Loading…
3,386 results • Best match
REPAIR REPLACEMENT TO PIPELINES, PUMPSETS, PANELS, DEVELOPEMENT OF BOREWELLS, CLEANING OF TANKS AND EARTHING AT WATER SUPPLY INSTALLATIONS AT ITR TECH AREA, LCS AREA AND SITE A, B AND C AT ITR CHANDIPUR
Laying of 6 inch pipe line for alternative water supply arrangement to CHP tank for dust suppression at CHP plant as per the direction of engineer in charge, Lingaraj OCP, Lingaraj area, MCL
Supply of ISI Marked Centrifugally Cast (Spun) Ductile Iron (K-7) Socket and Spigot Pressure Pipes required for the work of Improvement of Water supply to Nayagarh Municipality (Distribution net work Zone-7)
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Rairangpur Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Malkangiri Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Koraput Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Bhanjanagar Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Phulbani Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Gajapati Division
Provision for Pump House and pump set with other arrangements at Snehapali and Brahmpura in connection with the work Improvement of water supply to Ward No 1 area under WATCO Section Brooks Hill
House Connection for Implementation of Drink from Tap with 24x7 Water Supply to Zone No-8(850KL) at Krushak Bazar Ward No-7,Ward No-1(P), 6(P) CMC, Cuttack under SUJAL
Shifting Utility Water Supply pipelines (Widening and Strengthening of Taladanda Canal Embankment road on Left sides (NH-16 Junction to Nayabazar Junction) from 3/520km to 5/063km Under WATCO Section, Nayabazar, Cuttack
Supply, Installation, testing and commissioning of the 11 /0.433KV, 315KVA copper wound, dry type Burnt Transformer on buy back basis at Chandrasekharpur, under WATCO Division-I, Bhubaneswar for Implementation of 24x7 water supply
Installation of Flow Meter, Flow Control Valve for Implementation of Drink from Tap with 24 x 7 water supply to Zone No.41 (227KL) at Khapuria Ward No. 50 CMC, Cuttack under SUJAL
Procurement of D.I K-9 Pipe for the work Construction of Intake Well and Laying of rising main Improvement of water supply to Kasinagar NAC under State-Plan for the year 2022-23.
Design Construction Testing and Commissioning of RCC UGR ESR Pump house and Installation of 250 KVA Sub-Station Pump sets at Ward No 11 of Jharsuguda Municipality for Universal coverage of water supply
Supply, Installation, testing and commissioning of the 33/3.3KV, 1250KVA copper wound, dry type Burnt Transformer on buy back basis at Kuakhai, under WATCO Division-I, Bhubaneswar for Implementation of 24x7 water supply
Provision for H.D.D. to cross the N.H.A.I Road for provision of Drink from Taps and 24x7 Water Supply to Ward No-01,02,03,20,21 and 22 of Jemadei and its adjoining areas of Khordha Town
Laying of Clear Water Rising Main Gap closing between production wells and Distribution lines in connection with the work Improvement of water supply to Ward No 1 area under WATCO Section Brooks Hill
Supply, Installation, Testing Wiring and Commissioning of salient type stand alone 200 KVA DG set for implementation of Drink from Tap with 24x7 water supply to Budheswary, Rasulgargh, Laxmisagar, Haladipadia area at Bhubaneswar
Supply, Installation, Testing and Commissioning of Chlorination system for provision of Drink from Taps and 24x7 Water Supply to Ward No-01,02,03,20,21 and 22 of Jemadei and its adjoining areas of Khordha Town
Provision of drinking water supply to left out habitations Betnoti Harizana Sahi Sathilo Part Bhagabati Part I II Bhagabati Village of RPWS to village Betnoti in Betnoti GP under Betnoti Block BASUDHA Programme
Provision for Design Construction Testing and Commissioning of the GSR including ancillary works at Dumerpada in connection with the work Improvement of water supply to Dumerpada and Dengsargi area under WATCO Section Bareipali
Laying of Clear Water Rising Main from Bhalipali chowk to Pardiapali Chowk under WATCO Section Bareipali in connection with the work Improvement of water supply to Bohidar Nuapali area under WATCO Section Bareipali
PROVIDING LAYING TESTING AND COMMISSIONING OF DI S/S (K-9) PIPES IN WATER DISTRIBUTION SYSTEM AND CONSTRUCTION OF 1.0 LAKH LTR CAPACITY RCC UGR FOR WATER SUPPLY TO ANGARAGADIA INDUSTRIAL ESTATE,BALASORE
Improvement of water supply to Kainsir area by Zoning of Distribution system under WATCO Section Modipada in connection with the work Improvement of WS to Kainsir and Singhpali area under WATCO Section Bareipali
OUTSOURCING OF SERVICES FOR WATER SUPPLY INSTALLATIONS AT SITE A JUNCTION PUMP HOUSE NO 11 AND 15 NEW PUMP HOUSE AND PUMP HOUSE NO 12 AND PUMP HOUSE NO 13 AT ITR CHANDIPUR
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Berhampur Division
Laying clear water rising main from 19 MLD WTP to different zones of of Jharsuguda Municipality for Universal coverage of water supply including automation of 3 nos zonal pumping stations under DMF funds
Providing power supply to 3ph 40KW PWW load to the PHD pump house at Dibya Jiban Sangha Nimapara in connection of the work Improvement of water supply to Nimapara NAC under State Plan
Supply, Installation, testing and commissioning of the 33KV/3.3KV/0.433KV, 1250/1500KVA copper wound, oil cooled on buy back basis at Palasuni under WATCO Division-I, Bhubaneswar for Implementation of 24x7 water supply
Installation of Flow meter flow control valve for Implementation of Drink from Tap with 24 x 7 water supply to Pratapnagari Ward No.58 and 56 (P) (DMA-III) CMC, Cuttack under SUJAL
Repair and renovation to toilets, water supply line, Plant boundary wall and Provision of paver block along with concrete drain at Ferro Chrome Plant OMC at JK Road in the district of Jajpur
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Rayagada Division
Supply of ISI marked D.I. Pipes (DI-K-7 and K-9) for the work - Augmentation of water supply system for Athamallik NAC including all other ancilary works under AMRUT 2.0 (SWAP-II)
Repair and Renovation of 03 nos. Qtrs in 01 block and Repair and Renovation of water supply Pipe line upto cow sheds and boring of tube well near OHT at CCBF,chiplima,Sambalpur
Provision for Pump House and pump set with other arrangements at Bohidarnuapali under WATCO Section Bareiapali in connection with the work Improvement of water supply to Bohidar Nuapali area under WATCO Section Bareipali
M/R to Kendrapara canal and systems under Barbodia Irrigation Section and F.C Section-I of Kendupatna Irrigation Sub Division for the year 2025-26 (Engagement of casual labour for Kharif water supply)
House Connection for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-11 at Gorakabar (700KL) Ward No. 8(P), 9(P), 16(P) CMC, Cuttack under SUJAL
Provision of House Connection for Implementation of Drink from Tap with 24x7 Water Supply to Zone No-7(500KL) at Sector -7(P) at CDA Ward No- 5(P) CMC, Cuttack under SUJAL
M/R to Kendrapara canal and systems under Barbodia Irrigation Section and F.C Section-I of Kendupatna Irrigation Sub Division (Engagement of casual labour for Kharif water supply) for the year 2026-27
Provision for construction of UGR, Positive Suction Pump House, Installation of Pumping Machineries including laying of feeder main and distribution main for water supply arrangement to OBC and Minority Hostel at Gothapatana, Bhubaneswar
Procurement of DI K-7 Pipe for coverage of uncovered areas and missing links for conversion of source from ground water to surface water in connection with water supply to Cuttack Municipal Corporation
Construction of 50 MLD Capacity Intake well, 20 MLD WTP with Raw Water and Clear water Rising Main for 24x7 Water Supply to Jharsuguda Municipality including O and M period of 5 years
Solar PV integrated dual pump based water supply system through off-grid mode including laying of distribution pipelines and providing (FHTC) along with comprehensive Maintenance for five (5) years in Malkangiri District
Fabrication of 01 Nos. 100 drum float, 02 nos. of 12 drum float and 04 nos. of 60 drum float for mine de watering and raw water supply at B(W)OCP, Mahalaxmi Area
Day to day water supply and sanitary maintenance work of CGM Office, 132 KV and 33 KV Substation, Central Store and other NRBs at Area Unit , Jagannath Area for a period of two years.
Providing water supply, electric supply and sewerage system for existing 02 nos toilet of Kote-Magazine barrack (Now use for Mahila Barrack) at BSF Campus Khurda of 02 BN BSF under SHQ BSF Chennai.
Operation n Electrical maintenance of various installation and infrastructure in Kulda Project including Project Manager office,Excavation workshop, Distribution substation,water supply system n all Road weighbridges and 1X250KVA DG sets at KOCP BA
Restoration of Road after laying of water supply pipe line OFC cable and sewer line at gangadharpali electrical division office to RP Line gate 16 and 17 in Rourkela for the year 2023-24