Loading…
Loading…
6,179 results • Best match
Providing Installing new deep tube well size 200mm id up to 150mtr. depth BGL with Hand Boring Method, Rising main, Pumping Machinery and CI Fitting inside Pump Chamber at water supply scheme Bassraon Block Raikot, District. Ludhiana
Providing and laying of Rising main for New OHSR at various Water Supply Scheme Bhagwanpura, Bhura Kona, Khalra, Farandipur, Pahuwind and Valtoha, Block Bhikhiwind/ Valtoha, Distt. Tarn Taran. Under JJM/Special Assistance to States 2023-24 Share
Providing and fixing of Dozing pump Chlorination at Tubewells Annual Mtc. Water Supply Scheme 256 Rishi Balmik Nagar, 129 Acre. Raj Guru Nagar, 475 Shaheed Bhagat Singh Nagar and 8.4 Acre Sant Ishar Singh Nagar at Ludhiana
Providing Installing new deep tube well size 200mm id up to 150mtr. depth BGL with Reverse Rotary Rig, Rising main, Pumping Machinery and C.I. Fitting at water supply scheme Jartauli, Block Pakhowal, District. Ludhiana Under Head 4215
Providing and Installing one no. New Tubewell of size 250mm I/d upto 350 mtr Depth with Reverse Rotary Rig in place of failed Tubewell for Water Supply Scheme Fatehpur and Sialba Block Majri, District SAS Nagar
AUGMENTATION OF WATER SUPPLY SCHEME VILLAGE PARBHAT SINGH WALA HITHAR (MH-PC) BLOCK JALALABAD DISTT. FAZILKA (UNDER PIDB) Tender for Prov. and Installing PVC Tube well, Construction of OHSR, Pump Chamber, Civil Work, Distribution System and etc.
Providing and Installing one no. New Tubewell of size 250x200mm I/d upto 300 mtr Depth with Reverse Rotary Rig in place of failed Tubewell for Water Supply Scheme Kansala Block Majri Distt. Sahibzada Ajit Singh Nagar.
Providing and Installing One No. New Tubewell of size 200 mm i/d straight upto 290 mtr depth with Reverse Rotary Rig in place of failed Tubewell for Water Supply Scheme Bhankharpur, Block Derabassi, District SAS Nagar
Providing and Installing new deep tube well size 200mm id up to 150mtr depth BGL with Reverse Rotary Rig Rising main Chlorinator and Pumping Machinery at water supply scheme Barmi Block Raikot District. Ludhiana (Under Head 4215)
Providing and Installing New Tubewell, Pumping Main, Pipeline for Distribution Main, HSC, Chlorinator and C.I fitting Inside Pump Chamber complete in all respects and other work contingent there to at water supply scheme Alamgir Block Ludhiana 1
Providing Tap Connections to consumers, Extension and Augmentation of Water Supply System at Fatehgarh Pajtur District Moga for Distribution Network under AMRUT 2.0 Scheme (Part-1)
Prov,Supplying,Laying,Jointing,Cutting and Testing of 100mm id to 200mm id DI K7 Water Supply Pipe lines, Construction of brick masonary SV and FH Haudies and 160mm od to 315mm od UPVC Pipes and 400mm id RCC NP3 Pipes at Raikot under MDF
Rough Cost Estimate Prov. Laying/Up-Gradation of Water Supply Line, Sewer line in Different Localities of Ward No. 59, Ldh.
ADDITION / ALTERATION / IMPROVEMENT OF EXTERNAL WATER SUPPLY PIPE LINES IN DOMESTIC AREA AT AF STATION PATHANKOT (PHASE-II).
Upgradation of 3inch GI Pipe Water Supply Line at old Sherpur Village, Sherpur Khurd, Ward No-22 in South Constituency.
Providing and Laying of Water Supply line in Shiv Enclave, Gawale Mohalla, officer colony, Green Avenue, Lamber Colony Zone 6A
P/F of missing links and repair of water supply lines in R.H.S of Kurali Landran Road at MC Kharar.
Replacement of water supply line and repair of more Operation and Maintenance works in the different wards of East Constituency.
Annual repair and maintenance of water supply, sewer, replacement of Cover Frame and Construction of M.H. Chambers in W.No.30,31,32,43,44,45,46
Annual Maintenance of Water Supply and Sewerage System at Jaitu town for a period of 12 Months (01.04.2025 to 31.03.2026)
MAINTENANCE AND OPERATION OF CERTAIN WATER SUPPLY INSTALLATIONS OF D-IB ZONE UNDER AGE EM-II OF GE (N) MAMUN
Rough Cost Estimate Prov, Laying/Up-Gradation of Water Supply Line, Sewer line in Different Localities of Ward No. 61
Providing and Laying 4 id DIK-7 water supply line at Arjan Nagar St.no.4, 8 , 10 (Ward No.42).
Repairs replacement improvement of external water supply distribution network in technical area at Mil Stn Dappar under GE (P) Dappar
Providing/Laying of 6inch i/d DIK-7 water supply line at Labour Colony near Govt. School Ward No. 41
O and M of Water Supply System at Payal Town Distt Ludhiana for the period of 12Months 01.04.2025 to 31.03.2026.
Providing and laying of 4inch and 6inch dia DIK7 Water Supply line in various areas ward no. 22 (South Constituency).
Providing and Laying of 6 inch DIK7 water supply line at main Tibba Road Dump Site in W. No. 17
P/l 8inch id sewer line and 2inch id G.I Water supply line in village Dhanddhari in ward no-30 .
REPAIR AND RENOVATION OF OFFICE BUILDING FOR WATER SUPPLY AND SANITATION CIRCLE SITUATED AT GURDASPUR UNDER HEAD 27 MINOR WORKS
Maintenance of Water Supply and Sewerage Line in different Streets of New Amritsar and Mall Mandi Scheme for One Year
Prov and Laying of 4inch DIK7 Water Supply Line St. No. 19-B, Punjab Mata Nagar in W. No. 70.
Repair and Maintenance of water supply and sewerage system in the Five Sectors of Amritsar city under G-20 Summit.
Connecting missing link of 4 inch PVC water supply line and 2 inch G.I. Scouring point in Ward No.12,13
Annual repair and maintenance of water supply, sewer, replacement of Cover Frame and Construction of M.H. Chambers in W.No.37,39,40,41,65
TENDER FOR PROVIDING STORM SEWER, SEWERAGE AND WATER SUPPLY AT SABJI MANDI KHANNA, MARKET COMMITTEE KHANNA DISTRICT LUDHIANA LDH2021-06
CONSTRUCTION OF OFFICE BUILDING FOR SUPERINTENDING ENGINEER WATER SUPPLY AND SANITATION CIRCLE AT MAIN WATER WORKS COMPLEX SRI MUKTSAR SAHIB
Repair of water supply line and sewer, Const. of M.H. Chambers, Raising of M.H. Cover Frames in Ward No.76
DNIT for Augmentation of Water Supply System at Pathankot installation of 6 Nos Tube Wells under AMRUT 2 0 Scheme
Prov. and Laying of 4 inch dia PVC pipe for smooth water supply missing link at Bhagtanwala, Ward No.69
Replacement of water supply line and repair of more Operation and Maintenance works in the different wards of South Constituency.
Operation and Maintenence of Water Supply and Sewerage Scheme at Banga for the year 2024-2025 w.e.f. 01.04.2024 to 31.03.2025
Annual repair and maintenance of water supply, sewer, replacement of Cover Frame and Construction of M.H. Chambers in W.No.62,64
Annual contract for maintenance of water supply and sewer lines falling under wards 1 to 3, 71, 79 and 80
Replacement of water supply line and repair of more operation and maintenance works in the different wards of North Constituency.
Annual repair and maintenance of water supply, sewer, replacement of Cover Frame and Construction of M.H. Chambers in W.No.20,21,24,27,28,29,47
Providing and Laying of 4inch dia DIK-7 water supply line at Prabhat nagar st.no.10 Ward no.45 new
Const. of M.H. Chambers, Raising of M.H. Cover Frames and 4 inch PVC water supply line in Ward No.84
Prov. and Laying of water supply line, 8 inch sewer and Const. of M.H. Chamber in area of W.No.2
Providing and Laying of DI K 7 Water Supply line in Ladowali road Opposite KCL College Ward 19 Zone 5