Loading…
Loading…
2,524 results • Best match
Renovation of Globe make 5 Ton EOT Cranes at CWPH HP II North South Re-invite
Repair and Overhauling of 180 HP BHEL make LT motor at RWPH, HPWW I, Set No. 03
Procurement of spares for Advance make oil resistance starters installed at Filter House, HP-I.
Earthing of electric panels of 08 Nos tubewells at DDA flats Loknayak Puram, Bakkarwala.
SITC of LT Panel 415 volts at Pkt. B1 and D BPS at Loknayakpuram Bakkarwala.
Annual maintenance Contract for day to day electrical maintenance at staff quarters, Varun Niketan. Re Invited
Modification of 500 mm dia. Sluice Valves Back Wash Valves installed at South Filter House, HP I.
Deployment of staff for Operation and Minor maintenance at B.P.S. Bawana, inside Bawana W.T.P.
Renovation of compact battery charger system for main HT panel board installed at CWPH HP I
Procurement of Complete Centre Mechanism for clarifiers existing at Filter House, HP I.
Refilling of fire extinguisher of various capacity at CWPH HP I. ReInvited
Procurement of floor fill compound for repair of traction wheel path of clarifiers at Filter House, HPI. ReInvited
Renovation of 11 KV Jyoti make HT panel installed at CWPH HP-II.
Modification of Back wash sluice valves of filter beds installed at Filter House HP1
Supply of mechanical items for various Tubewells installed at Loknayak Puram, Bakkarwala.
Renovation of Jyoti makes VCBs of Pump Set. No. 13, 14 and 15 at CWPH HP I
Shifting of 1200 mm dia. Kirari main near Helipad Road, Rohini Sector 31.
Repairing and Renovation of Limitorque Make actuators installed at Filter House North and South at HPWW-II.
Procurement of electrical items for CWPH HP I. Re Invited
Improvement of de-watering system by replacement of existing de-watering pump sets with other allied works at RWPH Bawana.
SITC of Semi automatic coarse Bar Screen for the Raw Water Pump House Bawana.
Renovation of Rolling Shutter Gates and Channel Shutter Gates at Delhi Cantonment BPS.
Procurement of complete coupling and coupling tyre for pump sets installed at Khyala and Naraina BPS.
Renovation of starters of Advance make for back wash motor Pump Sets at North Filter House HP 1.
Procurement of Miscellaneous item for day to day maintenance at CWPH, HP I.
SITC of water level indicator at South Pump House, CWPH, HP I.
Procurement of LED Lights, electric fans and air circulators for various installations and offices under AE E and M II subdivision at HPWW, Phase I.
Lowering and lifting of Submersible Pump sets of various Tube Wells at DDA Flats Loknayakpuram, Bakkarwala.
Replacement of 11 KV HT Pilca Cable from BSES Meter Cubicle to Sagarpur HT Incoming Feeder Panel at Delhi Cantonment BPS.
Renovation of Domain make Power Factor management system at Naraina BPS.
Electrification of renovated laboratory of HP I at South Filter House.
Renovation Strengthening of Protection of Electrical system at CWPH at HPWW, Phase I.
Supply, Installation, Testing commissioning etc, of IOT based central monitoring system for all SPSs.
Improvement of power factor of standard make APFC panels Raw water pump house II under HPWW I
Replacement of studs, nuts, bolts, washers of flanges of delivery valves, dismantling joints of individual pump sets at Delhi Cantonment BPS.
Procurement of gear boxes for bridge and flocculators at Filter House, HP I.
Replacement of Fix manual bar screen installed at CLC intake of Raw Water Pump House phase II of HPWW
Renovation of Domain make Static Capacitor panels installed at Khyala BPS. ReInvited
Replacement of 1000 AMP. Air Circuit Breakers Installed in LT panel at Raw Water Pump House Ph I, HPWW I.
Improvement of Lighting arrangement for Filtered water Channel Inspection Box with allied works at North and South Filter House, HP I.
SITC of High Mast Lighting at RWPH Bawana.
Repairing of Backwash Pump No.1 and 4 with other allied works installed at south filter house HPWW-II.
Renovation of HT static capacitor banks for motors at South pump house at CWPH HP I
Deployment of staff for Operation and Minor maintenance at Khyala BPS,Phase I, W.E.F. 1 May 2024 to 29 July 2024
Overhauling servicing of oriental make penstock gate valves installed at RWPH Bawana
Refilling and procurement of fire extinguisher of various capacity and other safety equipments at RWPH HP I and II.
Supply and laying of cable for Flash Mixtures No. 1,2,3,4,5 and 6 at Filter House, HP I.
Removal of floating material manually by labour at different bar screens installed at twin main point under HPWW I.
SITC of LT Panel 415 volts at Pkt. B2, A and C BPS at Loknayakpuram Bakkarwala.
Repairing / Servicing of 3.3 KV HT Panel installed at RWPH Bawana