Loading…
Loading…
1,453 results • Best match
Common gravity main from WTP at Muthappankari to Service Reservoirs in Mangattidam, Trippangottur, Kunnothuparamba, Chokli and New Mahe Panchayaths
Eraction of Pump sets Construction of 20MLD WTP at Chowara Erection of transformer and allied works General Civil Work
AS PER BOQ AND TENDER DOCUMENTS
Conveyance of chlorine cyliner
TWSS-Replacing Damaged Sluice Valve and NRV of Pump No. 4 of 72 MLD WTP Clear Water Pump House, Aruvikkara.
UWSS to PiravomMunicipalityReplacement of damaged 250 mm ACgravitty mainfrom K akkad WTP to Pazhoor Sump by laying 250mm DI pipe
State Plan 2025-26 Optimization of Production Transmission -Maintenance work of WTP Chootakadavu under Mananthavady section( Revised)-General Civil Work
CONSTRUCTION OF BSL 3 LABORATORY BUILDING AT COVAS FOR KVASU, MANNUTHY CAMPUS, THRISSUR, KERALA. SH. CONSTRUCTION OF SINGLE STOREY RCC FRAMED STRUCTURE OF LABORATORY BUILDING (BSL 3) I/C INTERNAL EI, FIRE ALARM AND PA SYSTEM, FIRE FIGHTING SYSTEM, DG ... UPS, RO PLANT , ...
Jal Jeevan Mission 2023 24 Parassala Panchayath Supplying and Laying 200 mm DI K9 Pipe from WTP vandichira to Kodavilakom OHSR
Supplying and laying transmission main from WTP Urathur to Service reservoirs at Payyavur, Eruvassy and Naduvil Panchayath and road restoration works
JJM- WSS to Edamalakkudy Panchayath in Idukki District- Design and Construction of 0.25 MLD WTP,Clearwater Sump Cum Tank at Paarakudy
Supply erection testing commissioning of 45 HP clear water pumpsets for Melattur GP at WTP in Vettathur GP-General Civil Work
AMRUT 2 0 Piravom Municipality Providing new submersible pumpset at Kakkad WTP pumping to Kompanamala GLSR and allied works Pipeline Work
JJM -Thrprangodu Mangalam Purathur Thalakkad and Vettom Panchayaths- Laying Raw water Pumping Main from Colony Kadavu at Bharathapuzha to Annassery WTP
State plan 2024-25-UWSS to Shornur- Supply, erection, installation and commissioning of 5HP vaccum motor pump set for Shornur WTP.
Production Components-Raw water pumping main from Thottumukham intake well cum pump house to 25 MLD WTP at Varandarappally.-General Civil Work
DEPOSIT-URBAN AGGLOMERATION - FIRST STAGE - SUPPLY AND FIXING OF PANEL BOARD AT KUNDAMANKADAVU PUMP HOUSE FOR 16MLD WTP UNDER PTP SUB DIVISION
AMRUT 2 SWAP 3 Rectifying the leakage and repacking the Filter Bed medium of Bed No 7 at 36 MLD WTP Vellayambalam
Design and construction of Production components OHSR 9LL capacity at WTP site and providing pump sets and allied works General Civil Work
JJM)-JJM- WSS to Edamalakkudy Panchayath in Idukki District- Design and construction of 0.25 MLD WTP, clearwater sump cum tank at Nooradi
O and M 2022 - Urgent roofing work need to be done in various places in WTP of CARWSS to Idukki Kanjikuzhy scheme
Dialysis Machine, RO Plant 1000 LPH, Multiparameter Monitor, ICU Cot Electric or Dialysis Chair, Cardiac Table, Wheel Chair, Crash Cart, Fumigation Machine, Medicine Trolley, Weighing Scale 200 Kg Platform type, BP Apparatus Non Mercury, ETP Plant 2000 LPH, Washing Sink SS 5ft
State Plan-State Plan 2024-25-Construction of drain to disposal of wash water from 6MLD WTP of WSS to Kalpakanchery and Valavannur
repairing and replacing old and damaged panel board, fuse carriers and improving the capacity of armoured cables of 7 mld wtp at mangadikunnu
Supplying, laying, testing, commissioning and maintenance of distribution system, providing Functional Household Tap Connections (2191 Nos), Improving of 11 MLD WTP at Sreekrishnapuram -
State Plan 2025-26- Shifting of pumpsets in connection with the construction of new WTP at Water supply section office campus-Pipeline Work
State Plan-State Plan 2025-2026-Repacking of filter bed and Rehabilitation work at 3.3 MLD WTP at Vizhinjam in Thiruvananthapram Corporation-Pipeline Work
DEPOSIT-URBAN AGGLOMERATION - FIRST STAGE -Supply Erection Testing and commissioning of 2 Nos of Flash Mixer Units in 16 MLD WTP at PTP NAGAR
Mace of RWSS to-Pallichal( MKottamoodu Zone) Choozhattukotta WTP-Rectification of leakages of pipe line and allied works for one year RC-2021-22
Jal Jeevan Mission (JJM)-(2021-2024) Phase11- ARWSS to Krishnagiri Purakkadi and Ambalavayal Villages- -Construction of approach road and Renovation works in Krishnagiri WTP
Annual Maintenance Contract of Electrical Installations in Kerala House and attached quarters.
Supply and laying 250 mm pumping main from Kakkad WTP to Koorumala OHSR, Supplying and laying of the Distribution system and providing FHTCs Package I
DRW-2022-23-UWSS to Tirur -Repair of Clarifier no 1 of WTP Tirur including electro mechanic works providing flocculator system and rail for clariflocculator
Supply, installation, testing and commissioning of Floating intake structure and motor Pump set at Peechi reservoir for pumping to 36MLD WTP at Peechi- Pipeline work.
Maintenance of RWSS to Pallichal (Mottamoodu Zone) Choozhattukotta WTP - Rectification of leakages in various pipe lines and allied works - one year RC for 2020-21
JJM Aryanadu and Uzhamalakkal panchayaths Supplying laying testing and commission of 450 mm DI K9 pumping main from Eliyavoor pump house to WTP at mangattupura
JJM- WSS to Chelakkara, Mullurkara and Panjal Panchayaths Productioncomponents.-Supplying, Laying, Testing and Commissioning RWPM from intake well to WTP and Road restoration works-Pipeline Work
Jal Jeevan Mission -RWSS to Parassala Supply Erection and Testing of new CF pumpset at Clear water pumphouse of WTP Vandichira Substituting pump with lower discharge-
Construction of 100 MLD WTP at Peruvennamuzhi with upward flow sludge blanket technology and laying transmission Main- Construction of Steel Bridges, Land Scaping and Protection Works
Maintenance of RWSS to Pallichal Mottamoodu zone and Choozhattukotta WTP - Rectification of leakages in various pipe lines and allied works - One year RC for 2022- 23
State Plan-(2024-25) - Energy efficiency improvement-WSS to Mananthavady, Edavakka and Naloornadu Villages - Supply and installation of Priming motor and allied works at WTP-Pipeline Work
Construction of 12 MLD WTP, 10LL OHSR, 10M dia Well cum Pump house at Pookatta, Supplying, Laying, Commissioning of Raw Water Pumping main, Clear water pumping main
State Plan-State Plan 2024-25-State Plan - 2024-2024 - RWSS to kottakkal -Parappur- Maintenanace of existing 3 MLD WTP at Kottakkal Parappur scheme-DPR Preparation Work
JJM Aryanadu and Uzhamalakkal panchayaths Supply laying testing and commissioning of 300mm DI K9 Clear Water Gravity Main from WTP to 9LL OHSR at Pallivetta Pipeline Work
Construction of 25 MLD WTP, OHSR , Clear Water Pump House, Sump, Clear water pumping main, Supply and erection of clear water pump sets, Transformer and Transformer Room
State Plan 2019 20 TWSS Mace of Head Works Division Aruvikkara Reconstruction of damaged portion of the wash water channel of 72MLD WTP outside the JICA quarters
Improving Production capacity of 100MLD WTP-Allied works in connection with the Replacement of Existing 804 HP , 3 Nos VT Pump set at RWPH Pazhoor-General Civil Work
Pipeline extension, Providing 1716 Nos. FHTCs in Kuthannur Pt., Filter media replacement at Manimala WTP, Supply, Erection Commissioning of C/W Pumpsets 160 KVA Tranformer and connected works.
JJM Aryanadu and Uzhamalakkal panchayaths Supply laying testing and commissioning of 200mm DI K9 Clear Water Pumping Main from WTP to 5.5 LL OHSR at Vettichankunnu Pipeline Work
O M Water Supply Schemes TWSS Periodical washing and cleaning of Sedimentation Tank and Flocculation Tank at 36 MLD WTP for the year 2026 2027 General Civil Work