Loading…
Loading…
1,155 results • Best match
Supply of Repairing and Other Items for Mainenance of WTP, Chinki Plant and Water Supply Pipe Line of Nagar Palika Parishad Narsinghpur for FY 2024-25
Providing and fixing of capacitors and other equipment for improvement of power factor at WTP Moondla Intakewell Dahod and filter Mandideep IA Mandideep Distt Raisen MP
Repairing of Leakege in 800 mm dia D.I. Raw Water Rising Main Line From Raw Water Tighra To WTP Tighra File No. T-38/19x9/2 .
Operation and Maintenance of Pumping Station at River Anas, WTP and OHT/Sump well at Industrial Area Meghnagar Distt Jhabua for a period of 24 months
REPAIR AND MAINTENENCE OF 3HP6 STAGE VT PUMP IN FILTRATION PLANT OF 29TH BN ITBP JABALPUR (M.P.)
Supply of erection and testing mechanical clair flocculater serper unit at shyamla hills 4.5 MGD water treatment plant under Zone No. 05
Construction of Additional Room and Toilet Near Clear Water Pump House and Paving Block in Premises AT water treatment plant khatpura M.P
Construction of Valve Chamber and Repairing work of Various types of compont Madiyarass Group Water Supply Scheme Likes As Repairing, Painting of WTP as per required etc.
SUPPLY OF LIQUID CHLORINE WITH TRANSPORTATION FOR 20 MGD TP,95 MLD TP AND 363MLD WTP BHAKLAI AND BP TANK PHASE III NARMADA PROJECT MANDLESHWAR. THIRD CALL
Rewinding of 315 KVA and 500 KVA 33 KV line transformer including O and M work in Sarfa WTP substation in municipal council SHAHDOL Short term tender
Providing and Installation of 215 HP Motor Pump and Sluice Valve With Labor and Material at Site WTP Tighra Gwalior File No. 21/24X9/2, 2nd call
Repairing of Plasters of boundary wall, making main gate, path way and cement concrete flooring in open space at WTP Moondla, I/A Mandideep Distt. Raisen (M.P.)
Replacement of Filter media andand Lateral pipes for Filter beds of old 13.5 MLD capacity WTP at Mandsaur along with repairing of filter beds Walls if required.
Repairing and Maintenance 3.3 KVA Control Room VCV repair and renovation of 33 KVA sub station and Control room at WTP Motijheel file nO. C-13X21X9/2
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7082920 Dated : 07-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6792372 Dated : 16-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 147000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6854657 Dated : 04-11-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7046554 Dated : 26-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6854465 Dated : 04-11-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6865719 Dated : 07-11-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7027917 Dated : 20-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6722413 Dated : 24-09-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Potable water purification system Potable Water Purification System ( 2 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis ... Operated Reverse Osmosis based ...
Annual operation for Lifting and Lowering of submersible pump / motor (Existing 2 nos. boreholes for water supply to WTP) at Pinoura sub area of Johilla Area.(2nd Call)
CONSTRUCTION OF CEMENET CONCRETE ROAD AT WARD NO 04 AND 05 MARIMATA CHORAHA TO TEHSIL OFFICE AND WTP PLANT TO TRENCHING GROUND UNDER CM INFRA THIRD PHASE SCHEME.
REPAIR AND RUNNING AND MAINTENANCE WORK OF FLOCCULATOR WITH REPAIR OF DOSING PUMP AND MOTER SET ALSO CHANGE OF FILTER MEDIA OF WTP AT PAHAD KOTHI PANNA M.P
PROVIDING AND LAYING OF 300 MM DIA DI K-9 (RWRM) PIPE LINE FROM NIRPAT SAGAR INTAKE WELL TO WTP AT PAHAD KOTHI AT PANNA DISTT PANNA (M.P)
Supply of Repairing and Other Items for Mainenance of WTP, Chinki Plant and Water Supply Pipe Line of Nagar Palika Parishad Narsinghpur for FY 2023-24 - II Call
Construction work of new toilet (let-bath) including septic tank in the police barrack (behind R.O. plant) located in Police Line, Ujjain premises.
Supply of Alumina Ferric Grade-4 IS 299/2012 at water Treatment Plant Khatpura including transportation, loading unloading Under Narmada Water Supply Project, Bhopal
Complete Remaking, Supply, Erection and testing of mechanical cloriflocculator serper unit at Bairagarh water treatment plant Under Zone 01 Bhopal As per Schedule/BOQ
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6686058 Dated : 17-09-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
SPL REPAIR TO BLDG NO T-8 AND T-29 (RECREATION HALL) OF 54 COY ASC (SUP) AND PROVN OF RO PLANT SYSTEM NEAR BLDG NO P-116 PH-I (OPD COMPLEX) OF MH AND CERTAIN MW WORKS IN THE AREA OF AGE B/R-II UNDER GE (WEST) JABALPUR
P/F of 200 kw 960 rpm 440 Volt Frame 55/50 C/S/D/it Motor and P/F of 300 kw VFD Control Panel at WTP Tighra.
Supply of Liquid Chlorine Gas IS- 646 1970 in a Tonner and its Accessories Require For Chlorination in Various WTP of Jabalpur Municipal Corporation including Transportation, Loading and unloading.
P/F of Split Casing Pump 45 KW 1500 RPM 415 Volt HZ50 TEFC WTP and Repair Control Panel Transformer AB Switch 11 KVA Motijheel.File No.T- 17/19X9/2.
P/F 36/33 KVA out door VCB with panel earthling work in 33 KVA in 33 kva ele. yard at wtp tighra file no. T-06/21X9/2
Invitation of Quality Control and Supervision work Of Construction of Nallah, Service Road from Water Treatment Plant, Ramnagra to Old NH 7. Over Shahnallah, Jabalpur
Manning, Operation and Maintenance of 13.62 MLD comprising Water Treatment Plant at Budhakheda, Bairagarh and Intake well pump House Borevan Bairagarh, Zone No. 01, Bhopal
Manning, Operation and Maintenance of 13.62 MLD Comprising Idgah water treatment plant at Idgah and Intake well pump house Karbala Under Zone No. 02, Bhopal
Supply of 1000 MT Ferric Alum Grade-IV in loose slabes as per IS 2992012 with up to date amendment Including loading unloading stacking transportation and all Duties andTaxes up to WTP Khatpura Under NWSP Water Works Dept Municipal Corporation Bh
HIGH VACUUM TYPE OIL PURIFYING EQUIPMENT OF CAPACITY 6000 LPH, OIL FILTRATION PLANT OF CAPACITY 10000 LPH, ELECTONIC VACUUM GUAGE
Providing and fixing of RCC sewer pipe to drain out of wash water from WTP of Moondla to out fall in Betwa river at I/A Mandideep Distt. Raisen (M.P.)
Repairing of FRP lining on alum Solution Tank and overflow, Drainage channel of Chemical house at water treatment plant Khatpura Under Narmada water supply project, Bhopal
Manning, Operation and Maintenance of 13.62 MLD Comprising water treatment plant at Budhakheda, bairagarh and intake well pump house, Borevan under Bairagarh Zone No. 01, Bhopal
Consultant for the Providing services for the Preparation of DPR including Survey, Design, Drawing, Soil Classification and Contouring of Water Supply Scheme Part-II (From Kewai River to WTP at Bijuri).
Repairing of Leakages and Strengthening of 2 units of 1.2 Million Litre Brick Masonary cum RCC Clear Water Tank at WTP Tarpura Industrial Area Pithampur Sector 2, Pithampur Distt. Dhar M.P.
Repairing work of various types of component MadiyarasGroup Water Supply Scheme likes as D.I. pipe line leakage , its specials including civil work of WTP as per required etc.in District Dindori (M.P.)
Requirement of Labour, Electrician, Machine for Operating and Maintenance work of 34 MGD Water Treatment Plant, Clear water pump house and Raw Water Pump House Kolar, Bhopal
Construction of Boundary Wall in Ward No. 9 and 10 Water Treatment Plant, damaged due to CMWS Project Water Supply Pipeline laying work at Sultanpur, Distt. Raisen