Loading…
Loading…
1,182 results • Latest
Removal re fixing of aluminum insulation sheeting on hot venture ducting of mills around soot blowers Hot air bus ducts Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit 7 during the year 2026 27
Dr.MVR RTPP-O&M-CHP - Providing CC Drain on both sides to the Road from JT#4 to JT#2A.
SDSTPS - 3X800MW - Attending miscellaneous Civil works in Swarnamukhi Colony of SDSTPS Township during the year 2026-27
SUPPLY OF BOWL FOR HP-1203 BOWL MILLS OF UNIT-2 OF SDSTPS
Procurement of CPEM 021 welding Electrodes
Procurement of 7C X2.5Sq.mm Copper cable for utilising at Chlorination plant
Procurement of HT Fuses and various types of MCBs /CHP
Procurement of G.I pipes and Fittings
Providing assistance to the Electrical shift operator and checking of healthiness of vibrating feeders of Wagon tippler 1 to 4 motors, 1A/1B/1C/1D, 6A/6B, 2A1/2B1, 2A2/2B2, 7/8 conveyor, 3A1/3B1, 9A/9B, 3A2/3B2, 4A1/4B1, 4A2/4B2 , 4C2/4D2, Belt feeders, crusher 's motors, Yard conveyors 10&11, Stacker/Reclaimer-1&2 electrical motors and Bunker trippers- 5A, 5B, 5C & 5D in Stage-I & II /CHP/ Dr NTTPS as and when required during the period from 01-04-2026 or from commencement of work to 30.09.2026
Charges for Critical repair works and movement of locos & dozers from railway marshaling yard to loco shed/Maintenance pit/dozer shed/Diesel bunk and return back to railway marshalling yard /pile, coal yard in L&EM/CHP/Dr NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Emergency repair works, DM water filling, lube oil fillings & etc. for locos and dozers as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Providing labor assistance for emergency coal clearing of coal heaps, slurry coal on all floors of crusher house and jammed coal and wet and slurry coal in crushers, vibrating screens& belt feeder chutes and clearing of heavy coal heaps during rainy season in M-1(crushers), /CHP(M.M)-I&II/Dr. NTTPS. as and when required from 01-04-2026 or from the date of commencement of work to 30-09-2026
conveyance of spilled coal and coal dust collected from various locations covering all the areas of MM/Stage-I & II/CHP by Lorry/Tractor as and when required during the period from 01-04-2026 (or) from the date of commencement of work to 30-09-2026.
Emergency Up-keeping in MM-I&II/CHP/STG-IV as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026.
Emergency Up-keeping of coal heaps in M-I Sub Division/MM/ CHP/ Stage-III/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Erection of 2 nos 33 KV feeder bays at 220 KVSS Palamaneru in O and M Circle Tirupati to avoid over loading of existing 33 KV Industrial feeder on Semi-turn key basis
Construction of drainage from Dondapati Ragesh house to Manne Sukumar's house in Arundathipeta Valivarthipadu village of Gudivada mandal
Procurement of Shock bars for ESPs of Unit-8
Providing Shifting of Drainage Crossing Drinking Water Lines & Repairs to Drinking Water Pipe Lines including leakages in Divisions of AEE-II Section (10-12 & 28-36 Divisions) in Ongole Municipal Corporation
REMOVAL OF WET SILT AT CIRCLE-9 (31, 32 WARDS) IN RAILWAYS DRAIN JANATHA GARAGE TO MALIKARJUN STREET, COMMUNITY TOILETS TO RAILWAY TRACK, SADIVARI STREET TO TENNIS COURT BACK SIDE (RAILWAY DRAIN) OF KAKINADA MUNICIPAL CORPORATION.
Improvements to the road (a) AC Road to AS Road (via) Marturu, Ch.N.Agraharam Km 3/0 to 7/00 (b) Thummapala -Bojjanakonda road from Km 0/0 to 2/0 in Anakapalli district
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the year 2026-27 for Unit-1 Boiler including T&P and consumables
Reconditioning of coal nozzle castings and coal nozzle tips for Unit-3 and 4 Boiler, required for 2026-27 annual overhaul
SUPPLY OF SPARES FOR ECP NEUTRALIZED SOLUTION DISPOSAL PUMP FOR REGULAR AND BREAKDOWN MAINTENANCE OF THE EQUIPMENT IN SD-III, CAM DIVISION
SUPPLY OF WELDING ELECTRODES FOR AHP/STAGE-II
SUPPLY OF DUST FILTER BAGS REQUIRED FOR SILO AHS SYSTEM OF AHP/STAGE-I
Hiring charges for the hired vehicles for the use of Deputy Executive Engineer R and B North Sub division Rajamahendravaram for the period from 01 05 2026 to 31 03 2027
Procurement of Lighting material for Ash plant of Stage-II
Establishment of New Nutrition Rehablitation Centre (NRC) at CHC, Munchingiput in ASR District.
Request for Proposal (RFP) Selection of Consultancy Firm as Project Monitoring Unit (PMU) for Visakhapatnam Economic Region (VER)
Hiring charges for the hired vehicles for the use of Superintending Engineer, (R&B) Circle, Kakinada for the period from 01.04.2026 to 31.03.2027 (2nd call)
Hiring charges for the hired vehicles for the use of Superintending Engineer, (R&B) Circle, Kakinada for the period from 01.04.2026 to 31.03.2027 (2nd call)
SUPPLY OF GENERAL ITEMS UNDER STOCK ITEMS FOR THE STORES DIVISION
SUPPLY OF BOILER FILL PUMP FOR REGULAR AND BREAKDOWN MAINTENANCE OF THE EQUIPMENT IN SD-III
Dr.MVR RTPP-M12-CAM-Stage-i-Procurement of 100NB ash discharge valve with double acting register-reg.
Site levelling and Sectioning for VMC open site at EWS 9th line in UDA Colony 63rd Division, Works Division-II
Clearing of Spilled over Coal of all Conveyors
SDSTPS- 3X800MW - Removal of Debris and Silt from Internal Drains and Fire Trenches near to Power House Area of Unit-I & II of stage-I for the period from 01.04.2026 to 31.03.2027.
Break-down works and Repair works for Dampers, Gates of all ducts as and when required during running and the overhaul period of Unit-3 in 2026-27 including T&P and consumables.
Procurement of Drinking Water Coolers
PROCUREMENT OF GEARED COUPLING, BZWG3000 FOR CONVEYORS 1A/1B & 2A/2B
Periodical maintenance of Refrigeration type H2 Gas Dryer M/s Span make, Type: HD-2016A, for the period from 01.04.2026 to 31.03.2027.
Replacement of MS line drains & HPT stop valve warm-up drain valves at Unit flash tank in Turbine maintenance division/Stage-II/ SDSTPS for the year 2026-27.
Construction of Office building to Coffee Eco Pulping unit at G.Madugula
Construction of Anganwadi building at Iskapalli Harijanawada in Iskapalli GP, Allur Mandal