Loading…
Loading…
1,182 results • Latest
Procurement of Economiser and SH Tubes for 500MW/Unit-7/Boiler/Stage.IV/Dr.NTTPS
Replacement of damaged mother and liner plates, replacement of damaged seal sheets in MM-I&II/CHP/STG-IV/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Providing labor assistance for emergency coal clearing of coal heaps in Wagon Tipplers- 1to 4 , slurry coal, jammed coal and wet coal in M-1(conveyors)/CHP(M.M)-I&II/Dr.NTTPS as and when required during the year 2026-27(From 01.04.26 or from commencement of work to 30.09.26)
Providing labor assistance for upkeeping of conveyors & Stackers/Reclaimers in M-II & M-IV Sub-Divns./CHP(M.M)-I&II/Dr.NTTPS. as and when required during the year 2026-27(From 01.04.26 or from commencement of work to 30.09.26)
Labour charges for Rubber lining of Bulk Acid tank in Condensate polishing unit area of Stage-V
Dr.NTTPS - Clearing of choked underground drains & conveyance of collected debris from various locations and elevations of St-I,II and III areas of power house complex and attending carpentry assistance, health, retirement and other awareness camps conducted in service building during for the period from 01.04.2026 or from the date of commencement of work to 30.09.2026
Dr.NTTPS - Clearing the storm water drain, upkeeping of Stage-I storage godowns including sweeping of roads, drains cleaning and clearing of dustbins, miscellaneous civil works at Stage I,II,III RM Yard and stage-I godowns, and clearing of jungle inside and outside of the compound wall around godowns and offices of stage-I for the period from 01.04.2026 or from date of commencement of work to 30.09.2026."
Replacement of 6.6KV HT motors of CWPH, BCWPH, APH of Stage-3 for breakdown and periodical maintenance works & Rectification of Earth faults in HT cubicals and related maintenance works during the year 2026-27.
Gudur Municipality - Construction of CC Drain-1 From Jenda chettu to Greeshma Beauty Parlour at Masjid Street. Construction of CC Drain-2 From Jenda Chettu to pole no Gmc 13/1085 at Majid Street 10th ward 9th Secretariat.
SUPPLY OF LAMELLA COUPLING SETS FOR PA,FD AND ID FANS OF UNIT-IANDII BOILERS
SUPPLY OF SPARES FOR RC FEEDERS OF UNIT-IANDII BOILERS
a) Laying of CC Road from Epole no VN-1DF/VN-6B1/DF to Existing CC Road at NBT colony b -block, b)Laying of cc road from epole no VN-9/1A VN-1B9/1/8 to 25-6-546 at A block masjid back side, c) Laying of cc road from door no 25/1/2050/14 to 25-6-860/2 at ncc colony, d) Laying of cc road from door no 25-6-787 to 25-6-785 at Ncc colony 5th street, e) Laying of cc road at annam vivekha colony, f)Laying of cc road from 25-5-281 to Epole no SG3A12/1 and 25-5-249 to dead end at sanjay gandhi nagar 8th street, g)upgradation of CC Road beside Ratanam school at Nbt colony in division no 32 of Nellore Municipal Corporation. in Division no.32,h) Upgradation of CC Road from D.No:25-3-960 to D.No:25-3-958 and D.No:25-2-875 toD.No:25-2-854 in Pragathi Nagar A Block 2nd Line, from D.No:25-2-971 to D.No:25-2-956 in Pragathi Nagar A Block 4th Line and from D.No:25-2-1233 to D.No:25-2-1197 in Pragathi Nagar A Block 8th Linein Division No.35 of NMC.under 15th FC (2025-26) 1st Installment
Rennovation of Entrance Arch, Main Gate, Compound Wall and Balance Portion CC Road at Hindu Buriel Ground, Kummar Bazar in Div No.04 Under AE-7 Section.(10th call)
Construction of APARA KARMALA BHAVAN in Div no.04 Under AE-VII Section(10th call)
procurement of LT Pin insulators with GI Pins
Certain break down and repair works adjustment of eroded grinding rolls and other repair works for HP 1103 Bowl Mills
Rectification of boiler tube leakages in Unit 8 Stage V as and when required for a period of 06 months from the date of commencement of the work.
Labour charges to overhaul ADP, BAP Pumps and its connected auxiliaries, Slurry discharge lines I,II,III,IV maintenance works of Ash pump House section which is common for all 5 units of stage I,II and III during the period from 01.05.2026 to 30.09.2026.
Annual maintenance of pressure parts of Unit-1 and 2 Boilers Five months from 01.05.2026 to 30.09.2026.
Labour Charges for operation and clearing of Coarse ash hopper chokes and to carry out open deashing from coarse ash hoppers if necessary by poking around the clock in Unit I and II StageI during for Five months From 01.05.2026 to 30.092026.
Attending Running Maintenance and overhauling of soot blowers in boiler of unit-8 stage-V for a period of 06 Months during the year 2026-27
Replacement of bearings of Dynamic classifier main drive assembly, Pre- assembling / replacement of Journal shafts, Journal bearings with Journal housing assemblies, Grinding rollers for HP-1103 Bowl Mills of Unit- 8 as and when required for a period of 6months from date of commencement of work
Rectifications of lighting circuits at higher elevations, maintenance of welding TB circuits of boiler 5&6 all floors, ESPs, TG floor, '0' meters, '5' meters elevation, Tranformer yard and compressor house , Annual Up keeping of Switch gear rooms and cable galleries,soot blowers of Unit 5 & 6, as and when required during the year of 2026-27.
Replacement of bearings of Dynamic classifier main drive assembly of HP-1103 Mills of Unit-3 as and when required during the year 2026-27
Regular maintenance & Breakdown works and clearing of coal rejects jams in various locations of the Mill Rejects System in Unit-3 as and when required during the year 2026-27
Reconditioning of coal nozzle castings and coal nozzle tips for Unit-3 and 4 Boiler, required for 2026-27 annual overhaul
Annual maintenance of pressure parts of Unit-3 and 4 Boilers from the date of awarding work to 30.09.2026.
Providing of patch repairs, carrying out of belt jointing works, edge repairs, relagging of pulleys and belt replacement works for the conveyor systems 1C,1D,3C,BFC,3D,3E,3F,4C,RSFD,6C, UC2 and JT-2 to JT-9 (Except JT-7&JT-8) ,RBF-1, 2&3 , Conveyor -5C, 5D,5E in MMSD-II of CHP/ Dr.MVR RTPP for the period upto 30.09.2026 from the date of issue of LOI
Replacement of Radiators of Generator Transformer during the Annual Overhaul of Unit-3 for the period 2026-27.
Repairs of flue gas duct (APH outlet and to ESP inlet) at the boiler of unit- 1 including T@P and consumables during the running and annual overhaul period 2026-27
Laying of 12 Nos spare 11 KV 500 Sqmm Aluminium XLPE power cables from 11 KV Kiosks at Substation to incomer at pump house at 220 KV SS Settypally to meet emergencies under RMI
Construction of CC drain from Tanniru Venkateswarlu house to Gattu Bhavani house at Jawahar nagar in ward No.29
Complete VPI rewinding of the 3450KW, 11KV, 372RPM, Frame: 1000, Type: HRN31007-78Y, Sr.No:20092097RMH744002, Make HHI (Hyundai)- of SDSTPS for the FY 2026-27 with Class H insulation during the year 2026-27
Different types of mechanical maintenance works as and when required in MM-IV sub division of CHP-III/ Dr.NTTPS from 01-04-2026 or from the date of commencement of work to 30-09-2026
Providing of 110mm Dia HDPE pipeline to North side 1st line and South Side 4th line of Siddartha vari Street in Nandamuri Nagar 58th Division
Construction of Plinth and Supply, delivery and fixing of 2000lts Syntax tank with 5.00HP 8stage Submersible motor pump set with necessary accessories at D.no 4-51 in Zero cross in 44th Division. Anantapuramu Municipal Corporation.
SDSTPS - 3X800MW - Removal of deposited ash, ash mixed with silt with in the drains (D47, D48, D49, D50, D51, D52a, D52 & D52b, D128, D77, D78a, D78, D79, D127) from ash silos of stage I & II to Outfall 1 & 2 respectively for the F.Y. 2026-27.
SDSTPS - 3X800MW - Removal of spill over ash on road between 1st and 2nd stage from work shop to ECCS switch gear room via stores and Wetting of road from coal gate to required areas with water tanker for the period from the month of April- 26 to March 27.
AOH Works Dismantling, Inspection, dewatering and re- arrangement of ACW spools connected to TG & SG PHEs after replacement of damaged PU coating with new one inside the spools for Unit-3 during the year of 2026-27
Breakdown and repair works of ESP i.e., works pertaining to EERM, CERM & GD rapping gear boxes, shaft bearings & drives as and when required during running and overhaul of the Unit-3/Stage-II/SDSTPS for the year 2026-27.
PROCUREMENT OF GI AND MS FITTINGS OF THE VARIOUS SIZES REQUIRED FOR MAINTENANCE OF SERVICE WATER, POTABLE WATER, SERVICE AIR, INSTRUMENT AIR, ETP SYSTEMS IN SD-III / CAM DIVISION,STAGE-II, SDSTPS
SUPPLY OF CLINKER GRINDER ROLLER CHAINS AND CHAIN LINKS REQUIRED FOR AHP/STAGE-I
Construction of CC drain from P.Siva Ramesh house D.No.7-427 1 to V.C.Reddy house D.No.7-411 near Vanta mestri Ramarao house in 11th ward of AGK Nagar in Vuyyur Municipality.
Supply of Digital Multi function Meters
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1&2 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-1&2 as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-3 &4 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-3&4 as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Supply of 7 sets(1SET=148 Nos) Manganese toothed Ring hammers for crushers
Rectification, Refurbishment and Re erection of Gear boxes for various PTP drives used in WTP-I&WTP-II, Stage-II, SDSTPS
Providing Mesh, Flooring and GI profile sheet to the Vermicompost shed near skew bridge AE-11 section Work Division-III Swachh Survekshan-2026. 3rd Call General Funds