Loading…
Loading…
822 results • Latest
Supply of Digital Multi function Meters
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1&2 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-1&2 as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-3 &4 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-3&4 as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Supply of 7 sets(1SET=148 Nos) Manganese toothed Ring hammers for crushers
Rectification, Refurbishment and Re erection of Gear boxes for various PTP drives used in WTP-I&WTP-II, Stage-II, SDSTPS
Providing Mesh, Flooring and GI profile sheet to the Vermicompost shed near skew bridge AE-11 section Work Division-III Swachh Survekshan-2026. 3rd Call General Funds
Removal re fixing of aluminum insulation sheeting on hot venture ducting of mills around soot blowers Hot air bus ducts Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit 7 during the year 2026 27
Dr.MVR RTPP-O&M-CHP - Providing CC Drain on both sides to the Road from JT#4 to JT#2A.
SDSTPS - 3X800MW - Attending miscellaneous Civil works in Swarnamukhi Colony of SDSTPS Township during the year 2026-27
SUPPLY OF BOWL FOR HP-1203 BOWL MILLS OF UNIT-2 OF SDSTPS
Procurement of CPEM 021 welding Electrodes
Procurement of 7C X2.5Sq.mm Copper cable for utilising at Chlorination plant
Procurement of HT Fuses and various types of MCBs /CHP
Procurement of G.I pipes and Fittings
Providing assistance to the Electrical shift operator and checking of healthiness of vibrating feeders of Wagon tippler 1 to 4 motors, 1A/1B/1C/1D, 6A/6B, 2A1/2B1, 2A2/2B2, 7/8 conveyor, 3A1/3B1, 9A/9B, 3A2/3B2, 4A1/4B1, 4A2/4B2 , 4C2/4D2, Belt feeders, crusher 's motors, Yard conveyors 10&11, Stacker/Reclaimer-1&2 electrical motors and Bunker trippers- 5A, 5B, 5C & 5D in Stage-I & II /CHP/ Dr NTTPS as and when required during the period from 01-04-2026 or from commencement of work to 30.09.2026
Charges for Critical repair works and movement of locos & dozers from railway marshaling yard to loco shed/Maintenance pit/dozer shed/Diesel bunk and return back to railway marshalling yard /pile, coal yard in L&EM/CHP/Dr NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Emergency repair works, DM water filling, lube oil fillings & etc. for locos and dozers as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Providing labor assistance for emergency coal clearing of coal heaps, slurry coal on all floors of crusher house and jammed coal and wet and slurry coal in crushers, vibrating screens& belt feeder chutes and clearing of heavy coal heaps during rainy season in M-1(crushers), /CHP(M.M)-I&II/Dr. NTTPS. as and when required from 01-04-2026 or from the date of commencement of work to 30-09-2026
conveyance of spilled coal and coal dust collected from various locations covering all the areas of MM/Stage-I & II/CHP by Lorry/Tractor as and when required during the period from 01-04-2026 (or) from the date of commencement of work to 30-09-2026.
Emergency Up-keeping in MM-I&II/CHP/STG-IV as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026.
Emergency Up-keeping of coal heaps in M-I Sub Division/MM/ CHP/ Stage-III/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026