Loading…
Loading…
1,535 results • Latest
Strengthening of Road from Belonia to Srinagar Ch1100 Km to 3950 Km Length 2850 Km on Engineering Procurement Construction EPC mode
FDR/Urgent construction of RCC Retaining wall on Ambassa-Gonda Twisa road to Kashorai para road (Length- 15.00 km) / SH- Retaining wall, Back filling etc. portion from 5.00 km to 10.00 km.
Periodical maintenance of road from Dangabari to Kupcherra road end (L - 6.00 km) under Gonda Twisa Sub-Division, PWD(RandB) during the year 2025-26/SH- Patch WBM-3, Carpeting, sand seal coating etc.
Mtc. of Govt. residential building during the year 2025-26 SH Repairing Maintenance of building portion(in and out) including wood work, painting, roof grading, water supply, sanitary installations and other allied works at different type quarters
PR of PWD Black top road from (i) T.K road (near Trishabari) to Khamarbari road (L-1.60 km), (ii) A.A. Road to DM Colony road (L-1.30 km), (iii) GM Road to Gopi Vallab School road (L-1.50 km) and (iv) GM Road to approach road of Fulbashi School (L-0
Renovation and Repairing ground floor of the old office building of Industries and Commerce Department of Tripura SH Construction of a Temporary Shed with GCI sheet roof including other allied work in the approach corridor of the western part at t
Development of roads (i) A.A road to T.A Road Via Bazar (L-1.00 KM) portion from 0.00 to 0.50 Km (ii) A.A Road to Fish Market (L-0.25 KM) under Teliamura Municipal Council during the year 2026-27./SH- GSB, Laying of Paver block,Pucca drain etc.
RCC work , Brick work, Plaster, Painting etc
Mtc of road from KCP to Dasda (L-13.30km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH- Providing, placing and laying of Brick Soling and edging etc portion 6.54km to ch 8.72km.
Mtc of road from KCP to Dasda (L-13.30km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH- Providing, placing and laying of Brick Soling and edging etc portion 4.36km to ch 6.54km.
PR of road from i) TK road to Bishnu master Para (L-1.00 km) ii) Baramaidan Road to Bashi Kobra Bazar(L-1.30 km) / S.H- Metalling, carpetting, drain and Protection work etc. under kalyanpur RD Block/ SH- Patch Metalling, GSB, Paver Block, Carpetting
Improvement of road from Choreibung to Kanajuri, Handurai para to Khagendra Para n Padmaluchan (TD road to Handurai Para PMGSY road junction to Padmalochan Para) under Damcherra Block. (Under RIDF-XXXI of NABARD)
Development of road from NH-08 near Chakmaghat CRPF camp to NH-08 near rice mill of Sri Parimal Das (L- 1.30 km)
Periodical repair of road i) Champlai to East laxmipur Ward No.1(L055) (L-1.08),(ii) Chakmaghat Bazar to Champlai(L054) (L-1.15), (iii)Dhukhiapara to Laxmi Narayan para(L051) (L-1.10km) under Mungiakami R.D Block during the year 2026-27./SH-WBM-3,car
Annual Repair and maintenance of residential Govt. quarters buildings during the year 2026-27 SH Cement concreting of undressed surface of Type-II_Block to Type-III_G Block, Rabindrapally incl plinth protection at Rabidrapally Quarter Complex under t
brick work drain during the year 2025-26
Pot hole repair through Grouting, Patch Carpeting, Seal coat, Shoulder maintenance etc during the Year 2025-26.
RCC work, Brickwork, steel work etc.
under PWD (R and B), Rupaichari, Sub-Division during the year 2025-26
SH - GSB, WBM Gr-III, Carpetting, seal coat, road marking etc.
Barbed wire fencing, Brick work, Re-plastering, flooring work, painting, Aluminium work, wood and PVC work, sanitary works etc
Improvement of road from Chowkider hour para to Tulashikhar Brindaban ghat road length 1.50km from Ch 1.00Km to Ch 1.50 Km under Tulashikhar RD Block during the year 2025 26 SH GSB, WBM 2 and WBM3, Carpeting, Seal coat, Retaining wall and protection
Mtc. of road Rajnagar to Subhasnagar (L- 3.00 km) SH -Patch metalling, re-carpeting and seal coat during the year 2025-26. (Portion from 0.00 km to 1.253 km) Gr - I.
Providing and fitting fixing of wooden decorative glazed doors, chairs, table along with floor carpet, inside painting of house etc of Tripura Legislative Assembly building under Capital Complex Sub-Division-I, Kunjaban Extension, Agartala during the
Mtc. of road from Kalachara to Bhuratali Kalibari road via Ekalavya School. (L - 3.100 km) SH - Wedining, metalling, carpeting and seal coat. during the year 2025-26. (Portion from 0.00 km to 0.595 km)
Hiring of vehicle 1(one) no. Maruti (EECO) Van not before manufacturing year 2019 in good working condition run by CNG with commercial Registration of the vehicle along with 1(one) driver for the official use of the Engineering Officers and Deputy Se
Improvement of road at Tulashikhar Twibaglai road to Rabicharan para Length 1.5 from Ch 0.00Km to Ch 0.50Km under Tulashikhar RD Block during the year 2025 26 SH GSB,WBM 2 and WBM 3, Carpeting, Seal coat, Retaining wall, CD and protection work etc.
Repairs and Maintenance of different units of Medicine Building at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Construction of boundary wall along with RCC retaining wall in the allotted land of Lok Bhavan in RS plot No. 2132/p, Mouja Kunjaban under Capital Complex Sub-Division-I, PWD (B), Kunjaban Extension, Agartala.
Patch repairing, Land slide clearance, Pallasiding, gunny bags filling, brick soling, Wire Crates etc. (Group-1).
Special Repair and water tightness of terrace at NTH Block-I AGMC and GBP Hospital, Agartala, Tripura(W) during the year FY2025-26
Repair and Maintenance at Nurse Hostel of AGMC and GBP hospital Premises during FY - 2026- 2027
Repairs and Maintenance of different units of Type-I quarter at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Renovation of old labour room for shifting of service laboratory at AGMC and GBP Hospital during the year 2025-2026 (2nd Call)
Repairs and Maintenance of different units of Type-II quarter at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Patch soling, Patch WBM, Carpeting, potholes repair, palasiding, gunny bag, shoulder mtc. C.C Block etc._2nd Call
Site clearance, Patch Soling, Patch WBM, Pot holes repair, GSB, Bituminous Concrete, carpeting, RCC Drain, 3 cell Box Culvert 01 No., Single cell Box culvert 01 no., Traffic Signs, Road marking etc. (L-4.05 Km)
Urgent maintenance of all official buildings along with government quarters (Bhallukiya Tilla) at Kunjaban Extension, Agartala under Capital Complex Sub-Division No-II during the year 2025-26.
Development of roads (i) A.A road to A.A. road via Fish Market (L-0.800 KM) under Teliamura Municipal Council during the year 2026-27./SH- GSB,Laying of Paver block,Pucca drain etc.
Providing installation testing and commissioning of water Purifiers water coolers and Iron removal filters at different locations of AGMC and GBP Hospital Agartala with 1One year warranty period and 1 year Comprehensive Annual Maintenance Contract
Modification of baby feeding room and installation of dedicated platform of changing of Napkins within toilet area at Kamalpur Court Building, Kamalpur, Dhalai ,Tripura.
FDR of road from Kurma Bazar to Gobindabari road(L-0.765 Km) under Kurma VC of Amarpur RD block during the year 2025-26.SH/ WBM-III, PMC etc
Flood damaged repair (FDR)/mtc. of various roads under the jurisdiction of Teliamura PWD Sub-Division No.I, during the year 2026-27.
Maintenance of Government residential building during the year 2026-27 / SH Repair / Maintenance of Type -IV (51 nos.) quarters under Central-IV Sub- Division PWD (Buildings) at Kunjaban Township Qtr. complex, Agartala.
Running maintenance of different works related to building maintenance at New Secretariat Building at kunjaban extension , Agartala under the jurisdiction of Capital Complex Subdivision No-II, PWD building under Capital complex Division durin
SH- WBM III,Carpeting, Recarpeting ,seal coat, Pucca drain , CD Culvert, Toe Wall.
Strengthening improvement of Riding Quality for Dharmanagar to Kadamtala Leftover NH208A Length 1550 Km
IMPROVEMENT OF BRICK SOLED ROAD FROM NH08 TO HOLYCROSS SCHOOL ROAD, MUSHYA PARA VIA DASHAMI REANG PARA, MUSLIM PARA UNDER SANTIRBAZAR (ST) Assembly Constituency. (Under RIDF-XXXI of NABARD)