Loading…
Loading…
1,308 results • Recent activity
Urgent mtc. of road from KCP Bazar to Dasda Bazar ( L-13.30km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH- Patch WBM-3, patch Carpeting, Seal Coat etc portion from Ch. 0.00km to Ch. 13.30km.
SH - metalling, carpeting and sand seal coat during the year 2025-26.
Construction of Paver block road from Madhya Boxanagar Girls School to IBB road via Gani Miah house (L-0.480 km) portion from 0.315 km to 0.480 km under Boxanagar block during the FY 2025 26(2nd Call)
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Construction of R.C.C Box drain on left side of NH 08 in Gomati district of Tripura under RIDF i.e. Construction of RCC covered drain on left side of NH 08 from ch.52.20 km at Brahmabari Tri junction to ch.54.70 km at Matabari, Udaipur to drain out