Loading…
Loading…
1,535 results • Latest
DISMANTLING WORK BRICK WORK
Mtc. Of the road from Phuldungsei to Khantlang Ch.- 0.00 Km to 11.50 Km under Jampui Hill Sub-Division PWD(RnB) during the F.Y. 2025-2026SH-- WBMTack coat re-carpeting seal coating Pucca n Kacha drain etc.
Landslide clearance, kutcha drain, gunny bag placing, G.I wire crates, earth filling etc. Gr-II.
Periodical Repair of the road from i Old AA road to NH 08 via Kumarghat Block office Total Length 650 00 mtr and ii Kumarghat Buddha Mandir road L 350 00 mtr during the year 2025 26 SH Patch metalling Grouting Carpeting etc
Periodical Repair of the road from Bhati Dudpur School to Chandpuri Para via Sarkar Para and Upa Zela Sabhadhipati house Length 1100 00 mtr during the year 2025 26 SH Patch GSB Patch metelling Grouting Carpeting etc
Periodical Repair of the road from AA road at 82 Miles to Nandadulal Das house via 82 Miles SB School in c School internal road Length 1150 00 mtr during the year 2025 26 SH Patch GSB Patch metelling Grouting Carpeting etc
Periodical Repair of the road from NH 08 to NH 08 via Atal Sarani L 600 00 mtr during the year 2025 26 SH Patch Soling Patch metalling Grouting Carpeting etc
Construction of mini open Community hall for public use at East Dudpur GP Ward No 03 under 50 Pabiacherra AC under BEUP Scheme during the year 2025 26
Construction of mini open Community hall for public use at East Kanchanbari GP Ward No 02 under 50 Pabiacherra AC under BEUP Scheme during the year 2025 26
Periodical Repair of road i Geetanjali Lane L 150 00 mtr ii Shibsakti Lane L 150 00 mtr iii Old AA road to Bhabatarini Mandir L 150 00 mtr under Kumarghat Municipal Council iv NH 208 to NH 208 via Nikhil Namasudra house L 450 00 mtr
Clearing of debris, dismantling of damaged boundary wall on eastern side of IDTR, Jirania
Maintenance of road from Kairai Chowmuni to Mahanta Shikari (Length 3.85 Km) under PWD(R and B) Mandwi Sub-Division, during the year 2025-26 SH Patch WBM-3..(Length to be repaired from Ch 0.00 Km to 0.95 Km 0.95 Km) (Group No-I)
Mtc of different Bailey Bridge under Khumulwng Sub Division during the year 2025-26 SH Strengthening of existing Bailey Bridge by providing fitting fixing of transom clamp, nut bolts, welding, painting and other allied works etc (2nd call).
Improvement of Birchandra thakur para to Birendra para Gr-II under Belbari R.D. Block (L 0.893Km) during the year 2024-25.
Comprehensive Annual Maintenance Contract for 02 No Ducted type AC system installed at Administrative Building and 02 No Packaged type AC systems installed at NTI Building IGM Hospital Agartala West Tripura for a period of 03 years
FDR Maintenance of Joykrishna to Dasharambari road via Kalasathi para (Total Road Length 2.70KM) under Khumulwng Sub-Division during the year 2025-26 SH Construction of RCC Box Cell (1x4.00 mx4.00 m) Culvert at Ch 1.90Km (2nd Call).
Maintenance of road from Kairai Chowmuni to Mahanta Shikari (Length 3.85 Km) under PWD(R and B) Mandwi Sub-Division, during the year 2025-26 ..(Length to be repaired from Ch 2.85 Km to 3.85 Km 1.00 Km) (Group No-IV)
Mtc of approach and internal road of SDM Office Jirania under PWD (R and B) Jirania Sub-Division during the year 2025-26 SH GSB, WBM, Carpeting and other allied works.
Maintainance of road from Purba Noagoan Milk Co-Operative to Paschimpara (L 1.00 km) under the jurisdiction of PWD (R and B) Khayerpur Sub-Division during the year 2025-26 SH Grouting, re-carpeting, sand seal coat and road side pucca drain etc.
Development of road (i) from Kabarkhola to Raju Shop (Vivekananda road) at AMC Ward no_13(Length is 0.175 km) (ii) From the House of Nitu Acharjee to Raju Saha house (Length is 0.10 km) at AMC ward no_ 12 during the year 2025_26_SH_ Brick Work ,Sand
1 Providing installation and commissioning of 02 Nos. 21 TR and 01one no 165 TR Air cooled Ducted packaged air conditioner in the Hall No1 of Pragna Bhavan Capital Complex Agartala
Providing Installation commissioning of air Conditioning System in the different residences of ministers and VVIPS in and around Agartala as an when required 2026
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 0.80 Km to 1.55 Km.
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 1.60 Km to 2.35 Km.
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 0.00 Km to 0.75 Km.(2nd Call)
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 4.00 Km to 4.75 Km.(2nd Call)
SH Grouting Carpeting with sand seal coat and other allied works
Development of road from Mangalpada to Pushpapada Para(link no 027) (Ch- 2.0km to 2.78 km L- 0.780 km)within Mohanbhog RD Block during FY 2025 26 SH Patch Metalling Grouting Re carpeting and allied works
Maintenance of Court building at Sonamura within the jurisdiction of Sonamura PWD (RandB) Sub Division during the FY 2025-26(3rd call)
50 BEDDED DRUG DE-ADDICTION CENTRE AT DHALAI DISTRICT HOSPITAL KULAI/ PROVIDING INTERNAL ELECTRIFICATION THEREOF.
Modernization_Up-gradation of Sukanta Academy for Science, Arts and Culture_SH_ (i) Wall cladding, ceiling works, renovation of gents and Ladies toilets. Innovation Hub and In Charge room, Internal walls etc. (ii) brickwork with finishing, repair of
Providing Installation Testing and Commissioning of IVRF AC Systems at 3 no medicine ward in first second and third floor of Old Super Specialty Block AGMC GBP Hospital Agartala along with Operation CAMC Operation for 3 years after installation and
Renovation Mtc of MBB College quarter complex near river side 2 nos building at College tilla during the year 2024-25 Providing internal electrification work thereof
Providing IE works at newly renovated Medicine Store of ABV_RCC Hospital_ Agartala_ Tripura(W)
Renovation of Office buildings under Gonda Twisa Division, PWD (G), Gonda Twisa, Dhalai Tripura.
Soling, WBM, paver block, carpeting, 2 nos. box culvert, drainage work etc
WBM, BM, BC, Drainage work, Paver Block, CC, Road markings etc (L-3.55 Km)
RCC Drain, Retaining Wall, Paver Block, WBM, Carpeting etc.
Drainage work, CC, PMC, WBM _ Paver block etc.
Hiring of Vehicle 1(one) Maruti Omni/ECO manufacturing year 2024/2025,( Preferably white), in good working condition, by the fuel with commercial registration of the vehicle along with 1(one) driver for the use of The SDO, PWD (RandB), Sub-Division
Outside painting alongwith inside corridor of Tripura Legislative Assembly building under Capital Complex Sub-Division-I, Kunjaban Extension, Agartala during the year 2025-26.
Repairs and Maintenance of different units of Proffesor Quarter and Principal Quarter Building at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Repairs and Maintenance of different units of Blood Bank and DRTB Center Building in FY 2026-2027 under AGMC and GBP Hospital, Agartala
Repairs and Maintenance of different units of Girls and Girls Intern Hostel in FY 2026-2027 under AGMC and GBP Hospital, Agartala
SH-Earth work, P.C.C Work, R.C.C. work, C.C. block pitching, Brick soling, WBM-3 etc (2nd Call).
Mtc. of Road from Anandanagar main road (Sonali Sangha) to Dias Coria via Kali Das Para ADC Village Council (Length_2point30 Km) under Dukli Sub_Division, PWD (RnB) during the year 2025_26_SH_Construction of road side drain
Construction of pucca drain in Sulptanpur L 440.00m SH Earthwork in excavation, PCC, RCC weepholes complete during the year 2025 26
SH- Pot holes repairing, PMC and surface drain etc.(Gr-III)
Improvement Strengthening of road from Burighat to SermunII in Tripura Length 15 862 km under NESIDS Roads
Construction of mini open Community hall for public use at Ambedkarnagar GP under 50 Pabiacherra AC under BEUP Scheme during the year 2025 26 2nd call