Loading…
Loading…
1,535 results • Latest
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Construction of R.C.C Box drain on left side of NH 08 in Gomati district of Tripura under RIDF i.e. Construction of RCC covered drain on left side of NH 08 from ch.52.20 km at Brahmabari Tri junction to ch.54.70 km at Matabari, Udaipur to drain out
SH -Patch metalling, re-carpeting and seal coat. (Portion from 0.00 km to 1.50km).
Different developments works in newly constructed 14 plus 1 Nos Government Quarter Complex at Bhallukya Tilla Agartala under the jurisdiction of Capital Complex Subdivision No II under Capital complex Division building during the year 2025 26.
Maintenance and Modification of Water supply system , existing roof of Green House Shed with Galvalume sheet and Residence Name Board etc. including other ancillary works in the Bungalow of Hon ble Chief Justice, the High Court of Tripura at Ne
Construction of Coffee board building under Jampui Hill RD Block during the year 2025-2026/SH-- Construction of single storied residential building in/c construction of Toilet sanitary works etc
Mtc. of Bhelianchip village approach to Airtel Tower road under Jampui Hill Sub-Division PWD RnB during the year 2025-2026/SH-- Paver Block Earth work PCC n RCC work etc.
Urgent mtc of road from Dasda to Anandabazar road (L-12.57km) under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of CC drain portion from ch 6.00km to ch 12.57km
Urgent Mtc of road from DSD-ABZ to Helenpur HSCL road via Dasda SPO camp (L-0.500 km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH. WBM-2, WBM-3, Carpeting, Seal Coat etc.
Urgent maintenance of all official buildings along with quarters of Kunjaban extension, Agartala under Capital Complex Sub-Division No-I during the year 2025-26.
near Sepahijala School under Bishramganj PWD
Building portion including internal Water supply and Sanitary installation, Sewage and Drainage works, Electrification works, Fire Fighting and Fire Protection System, Medical Gas Pipe line system, Lift, HVAC Works etc
Mtc of I Fulbarikandi Bangaon Barkhala rd via Panchayat Office L0.450km n Madani Masjid L0.350km ii KLS Rangauti rd to IBB rd via Devipur School Ch1 1.63 km iii Latiapura rd Ch1. 2.30km iv Ichabpur rd L1 km v Bongaon rd Ch.1. 2.30km SH patch metallin
S.H- Construction of Temporary building. Gr- II.
S.H- Costruction of Temporary building. Gr- I.
Providing internal electrification of all rooms at Dwarkai Kalai Bari JB School Jampuijala and Krishna Sangha SB School Charilam Sepahijala Tripura
Improvement of road including construction of RCC Cover drain on the road from N.S road to steel bridge road Town Bordowali Road no 3 SH RCC Cover drain with footpath
Special Repair, Retrofitting and Water tightness of different government quarters at Rabindrapally, Gandhighat and Melarmath including the VIP quarters at SPM lane, Agartala, Tripura
Development of Agartala Town Road during the year 2025-26 i) SPM Lane and ii) VIP Road from Haradhan Sangha to Bidurkarta Chowmuhani SH BC, Road Marking with other allied items
Development of Agartala Town Road during the year 2025-26 Different Roads within AMC Ward No. 32 in Netaji Chowmuhani to Forest Office Embankment Area SH Pot hole repair, Re-carpeting, Cement Concrete Work etc
Providing internal electrical installation in the Laxman Kwapra JB School Maa Saradamani J.B School Sonamani Siphai Para J.B School Manti Girls Residential school English Medium under Mandai Block West Tripura
Widening of road from Dasda to Anandabazar (L-12.57km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH Providing, placing , laying of Brick Soling and edging etc portion from ch 10.90km to ch 12.57km
Renovation of electrical panel board of Old Physical Science Building of Maharaja Bir Bikram College Agartala Tripura West
Widening of road from Dasda to Anandabazar (L-12.57km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH Providing, placing , laying of Brick Soling and edging etc portion from ch 8.175km to ch 10.90km.
Providing Supply installation testing and commissioning of Outdoor lighting highmast including necessary arrangements for highmast lighting illumination at the main college campus area hostels Quarter area in the College of Agriculture Lembucherra Ph
Supplying installation and commissioning of 140 Nos 12V 65 AH SMF VRLA Battery of 02 nos 40KVA 01 No 20KVA and 02 Nos 15KVA UPS in Sushruta and Charaka Building of ABV-RCC Hospital Agartala Tripura West
Construction of 100 bedded capacity shelter house within the campus of Agartala Govt Medical College SH Providing IE Work thereof
Building portion including Internal Water Supply, Sanitary Installation and Sewage and Drainage Works.
Hiring of vehicle ECCO/Maruti Van(OMNI) or equivalent (Petrol Engine)(Not earlier than 2020) four wheel drives for office of the Sub-Divisional Officer, Rajnagar Sub-Division,PWD(RandB),Belonia,South Tripura District under Belonia Division.......
Hiring of vehicle ECCO/Maruti Van(OMNI) or equivalent(Petrol Engine)(Not earlier than 2020) four wheel drives for office of the Sub-Divisional Officer, Hrishyamukh Sub-Division,PWD(RandB),Matai,Belonia,South Tripura District under Belonia Division...
Patch metalling, Grouting, Re-carpeting, and other allied works
Patch metalling, Bituminous grouting, Carpeting and other allied works.
Patch metalling, Bituminous grouting, Carpeting and other allied works
Stone grouting, Patch metalling, Carpeting and other allied works.
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Pot hole repairing, Re-carpeting, Tack coat, Seal coat etc.
Site Clearance, Earthwork, Protection Work (Retaining Wall and Toe wall), Drainage works, Granular Sub-bases, Bases (Non-Bituminous) and Shoulders, Bases and Surface Courses (Bituminous), Traffic Sign, Markings and other Appurtenances, Box Culvert.
Maintenance of road from Damcherra Khedacherra road to Jalidhanpara via Gangajoy and Laichak para. from CH.1.50KM to CH.4.70KM Total Length 3.20KM under Damcherra Sub Division, PWD R and B during the year 2025 2026 SH Patch metalling, Patch Carpet
PR of Khantlang BSF Camp Approach Road Ch-0.00 km to Ch-0.240 km Length-0.240 km under Jampui Hill Sub-Division PWD RnB during the year 2025-2026/SH-- Roadway cutting GSB WBM-3 Tack coat carpeting seal coat etc.
Maintenance of Road from Damcherra Khedacherra Road to Lalmohan Para from CH.0.00KM to CH.1.01KM Total Length 1.01KM under Damcherra Sub Division, PWD R and B during the year 2025 2026 SH WBM III, Re Carpeting, Seal coating,Surface Drain,Pucca drai
PR of Premtala-LaljuriPetrol Pump road to Hemsukla Ch-1.290 km to Ch-1.600 km Length-0.310 km n RCC Protection Wall Length-17.50 mtr. under Jampui Hill Sub-Division PWD RnB during the year 2025-2026/SH-- Repair pot holes Tack coat carpetin
Urgent mtc of road from Shantipur to Bhandarima (L-3.80km) under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of R.C.C Retaining wall and pucca drain etc. at Ch 1.50 km.
PR of Kanchanpur-Jalabassa road to Kanchanpur Sub-Jail Ch-0.780 km to Ch-1.20 km Length-0.420 km nSukramani para road to Sub-Jail Ch-0.00 Km to Ch-0.650 Km under Jampui Hill Sub-Division PWD RnB during the year 2025-2026/SH-- Repair pot holes
Round the clock watch ward and Trial run ic Jungle cutting cleaning of the ADM Plant related machineries at Damdamia, Agartala under Mechanical Sub Division No I Agartala West Tripura during the year 202627
Bituminous concrete, metalling, GSB, laying of paver and construction of RCC road side cover drain including road markings and sign boards during the year 2025-26. (Under RIDF-XXXI of NABARD).
Re-Carpeting, metaling, grouting, seal Coat etc
Maintenance and construction of road side Pucca drain and allied works etc
Development of approaches of box culvert on Nal Depha Cherra at Khupilong Panchayet during the year 2026-27.
Improvement of road from Mohanpur Bamutia road to Rangamura during the year 2025-26 /SH GSB, WBM-II, WBM-III, Carpeting, seal coat, box cell etc with alied work (L-0.70 KM).