Loading…
Loading…
1,535 results • Latest
Periodical Repair of the road starting from K K road near S E Office to Red Rose Club road via P M G S Y SE office in c internal roads L 600 00 200 00 800 00 mtr during the year 2025 26 SH GSB Metelling Grouting Carpeting etc
Periodical Repair of Old AA road to Old AA road via Kumarghat Municipal Council and Kumarghat Tehsil Kachari Length 1000 00 mtr during the year 2025 26 SH Patch metalling Grouting Carpeting etc
Periodical Repair of the road from AA road near Hotel Kalpataru Grand to AA road via Choudadebata Thali Length 1000 00 mtr during the year 2025 26 SH Patch GSB Patch metelling Grouting Carpeting etc
Periodical Repair of KN Road Length 400 00 Km during the year 2025 26 SH Patch Soling Patch metalling Grouting Carpeting etc
FDR and mtc. of different roads under 45-Kamalpur AC under the jurisdiction of PWD(R and B), Kamalpur Sub-Division during the year 2026-27.
SH- RCC drain and other allied works etc
SH - Grouting, Carpeting etc.
Development of Agartala Town Road during the year 2025-26 Different Roads within AMC Ward No. 32 in Melarmath, RMS Chowmuhani, Office Lane etc Area SH Pot hole repair, Re-carpeting, Cement Concrete Work etc.2nd Call
Resurfacing of Shantipara Internal Roads by Bituminous Concrete and Premix Carpet SH Bituminous Concrete work with other aliied items
Development of Internal Roads by Paver Block and C.C Road of Maharajganj Market Area SH RCC, PMC, Brick Masonary Work etc. L 1.95 KM
Mtc of road from Anandanagar 9 No Para to Radhamohan Sardar Para (Length _0point650) KM under Dukli Sub_Division, PWD(RnB), during the year 2025_ 26_SH_Construction of Protection Wall
FDR and mtc of different roads under 46- Surma AC under the jurisdiction of PWD(R and B), Kamalpur Sub-Division during the year 2026-27.
Improvement of road from Ayonamura to Debapur during the year 2025-26 /SH GSB, WBM-2, WBM-3, Carpeting, seal coat, box cell etc with allied work (L-1.0 KM).
SH PATCH WBM-III CARPETING WITH SAND SEAL COAT AND OTHER ALLIED WORKS
CONSTRUCTION OF ROAD FROM JOLAIBARI-KALASHI ROAD TO MAJUMDER PARA VIA DAS PARA AND JOLAIBARI-KOWAIFUNG ROAD TO MANIK PARA. (Under RIDF-XXXI of NABARD during year 2025-26)
Urgent mtc of road from Dasda to Anandabazar (L-12.570km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/S.H Construction of R.C.C drain at Gachirampara bazar(Gr-I).
Urgent mtc of road from Dasda to Anandabazar (L-12.570km) under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of R.C.C drain at Gachirampara bazar(Gr-II).
Urgent mtc of road from Dasda to Anandabazar road (L-12.57km) under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of CC drain portion from ch 0.00km to ch 6.00km
Mtc. of differents roads under PWD R and B Damcherra Sub Division, during the financial year 2025 to 2026, SH. Hiring of vehicle New Model Wagon R, Commercial for smooth running of the Sub Divisional Development work.
Mtc. of PWD staffs Quarter ( Type-II n Type-III ) at Dasda under Dasda Sub-Division PWD(RnB) during the year 2025-26/SH-Plastering,tiles work , water proofing treatment, ceiling,wood works, sanitary, plinth protection, painting etc.
Providing installation and commissioning of Air Conditioning System in the newly Constructed Integrated Public Health Lab IPHL under PMABHIM at Sonamura SubDivisional Hospital at Melaghar Sipahijala Tripura
Providing Internal Electrification inside the Publication Unit and the surrounding area of SCERT at Kunjaban Agartala Tripura West
Providing Annual Internal Electrification maintenance work in Agartala Government Medical College Boys Girls Nurses Intern Girls l Intern Boys Resident Doctors PG Hostel of AGMC and GBP Hospital for the one year March 2026 to Feb 2027
Mtc of 1. road from NH 208A to Unakoti L1.00 km 2.Old K.K road L3.5 km SH jungle cutting Patch metalling, grouting, recarpeting, seal coating including road sinage, painting, and protection work etc complete during the year 2025 26
Round the clock watch ward of the ADM Plant related machineries and also time to time Trial Run of ADM Plant Paver Finisher etc including preventive maintenance by servicing oiling greasing etc at Garadtilla Kamalpur under Mechanical Sub Division
1 Round the clock watch ward of the ADM Plant related machineries and also time to time Trial Run of ADM Plant Paver Finisher Excavator JCB cum Loader Tipper etc including preventive maintenance by servicing oiling greasing etc at Pathartilla Pan
Providing Installation and Commissioning of 1one No of 06 passenger 408 kg Machine Room Less MRL lift serving up to G3 level at residential quarter for Grade II Judicial Officer Dharmanagar North Tripura during the year 2025263rd call
Strengthening of road from Laljhuri PWD road to Demdum Laljhuri PMGSY road via Akhil Gope House under Kumarghat R.D Block of Fatikroy Assembly Constituency Under RIDF XXXI of NABARD during the year 2025 26
Improvement of road from Kali Bazaar-Barjush road at Akhali Mandal house to Achal Mani Biswas house (L 1.10 km) during the year 2025-26/SH- Flat soling, edge soling, WBM-3, carpeting, seal coat and construction of retaining wall.
Maintenance of black top road from Maikhor Para Baptist Church to Sambhu Debbarma Dullan Chowmuhani(L-535.00 Mtr) during the year 2025-26/ SH WBM-III, Carpeting, tack coat, seal coat, flat brick soilng, etc.
Maintenance of road from A) Damdomiya to Lembucherra police station(Old NH 108B) and Fatik Cherra to Mohinipur B) Old NH 108B to Kamalghat H.S. School during the year 2025-26/SH Patch grouting , WBM-III, Carpeting, seal coat etc.(L-13.00KM)/Gr-II
Maintenance of Birmohan Bailey Bridge on the road from Birmohan Chowmuhani to Barkathal Bazar during the year 2025-26/SH Deck nut, Transom clamp, panel pin, bracing bolt, raker nut, wire crates and wood work etc./Gr-II
Improvement of road from Kopali para to Industry Bazar-Mantala raod during the year 2025-26/SH GSB, WBM-II, WBM-III, Carpeting, Drain , CD, Retaining wall etc(L-1.50 KM)
Maintenance of road near Auto Stand opposite side of Mohanpur Girls School of Ward No.5 under Municipal council during the year 2025-26/SH Flat brick soling, WBM-III, Paver Block, Toe Wall etc.
Patch soling, metalling, repair to pot holes, PMC, drain mtc, etc.
Improvement of road from Agragati Club to Housing board via Ambedkar High School (L-0.75 Km) in AMC Ward No. 51, 18-Surjamaninagar Assembly Constituency during the year 2025-26
SH Site clearence, Patch Soling, Patch WBM, Pot holes repair, GSB, Bituminous Concrete, carpeting, RCC Drain with cover slab, Single cell Box cell culvert 01 no., Traffic Signs, Road marking etc. (TL- 3.71 Km)
Improvement of road from Maloynagar (Near Gandgi Datta house) to Jogendranagar Raliway Station (near car wash centre) (L-0.55 Km)
Soling, WBM, carpeting, Drainage work etc
Patch soling, metalling, repair to pot holes, PMC, paver block, drain mtc, etc. (Gr-II).
Soling, PCC, RCC and etc.
Construction of 1000 seated Capacity Auditorium building at Ramthakur College Campus at Badharghat, Agartala, West Tripura_ Balance works. _ 2nd Call
Demolition and disposal of dismantle materials of existing old buildings of Ancillary Buildings Structure situated at Pushpabanta Palace Complex, Kunjaban, Agartala.
SH Patch Metalling Grouting Recarpeting and allied works