Loading…
Loading…
1,535 results • Latest
Mtc of road Mtc of road Sonamura Boxanagar road to IBB road via samar smriti Milanayatan (L 0.562KM) portion from 0.380 to 0.562km during the year 2025 26 SH construction of pucca drain and paver block etc and other allied works
Mtc of road Sonamura Boxanagar road to IBB road via samar smriti Milanayatan (L 0.562KM) portion from ch0.200km to 0.380km during the year 2025 26 SH construction of pucca drain and paver block etc and other allied works
P I T C of IVRF AC systems in replacement of existing old Blue Star make BVRF System in different areas including Court no 2 3 4 5 of THC Building Agartala along with dismantling of existing old machines to be replaced removing them from site taking
Providing installation commissioning of 02 Nos water Coolers along with water Purifiers at Ground Floor First Floor of PWD Composite Building Complex and 01No water Coolers along with water Purifiers at Ground Floor near the the EE Mech Division
Construction of C.C road and drain from House of Jantu Miah to House of Majul haque of Bitterban, Bhati Abhoynagar under AMC ward no_13 _SH_ Earth Work, Sand Filling, P.C.C, R.C.C work ,Brick Work, C.C work and other allied works.
Annual maintenance for office of the SDO PWD(RandB) and PWD Quarters at Sonamura within the jurisdiction of Sonamura PWD (RandB)Sub Division during the FY 2025 26
SH Grouting Carpeting with sand seal coat and other allied works
SH Grouting Carpeting with sand seal coat Road side pucca drain and other allied works
Construction of Veterniary Dispensary at Ushabazar under West Tripura District/SH Construction of Building for Veterianry Dispensaries including Doctor/Staff room with lavatory, Dispensing room medicine store, small laboratory, animal shed including
Maintenance of road from Burakha Mandwi via Kathiram (Length 6.00 KM) under PWD(R and B) Mandwi Sub-Division, during the year 2025-26 Length to be repaired from Ch 2.50 Km to 5.00 Km 2.50 Km) Group-II
Maintenance of road from Paschim Noabadi to Kobarkhola Lalmatia (L 1.50 Km) under the jurisdiction of PWD (R and B) Khayerpur Sub-Division during the year 2025-26 SH Patch metalling, grouting, 20 mm carpeting, bamboo palasiding and other..
Mtc of Road From Joynagar IS Road (Biswajit Das House) to Swapan Banik House (Ch 0.0 Km to Ch 0.100 Km, Length 0.10 Km) and Joynagar IS Road (Debu Bhattacharjee House) to Ajoy Banik House..under Jirania Sub-Division, PWD (RandB) during the year 25-26
Mtc. of approach road of Birendranagar H.S. School under Jirania Sub-Division, PWD (R and B) during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting, Road side pucca drain and other allied works. (L 0.26 Km, Ch 0.00 to 0.26 Km).
Maintenance of road from Khayerpur to patni(Length 15.372km) under PWD(R and B) Mandwi Sub-Division, during the year 2025-26 SH Patch WBM-3, Patch Grouting..(Length to be repaired from Ch 0.00 Km to 7.00km Km 7.00 Km) (Group No II)
Mtc. of road starting from T02 (US road) Madhyapara - Harpathari para road to IBB road (Near Bangamura BOP) (L - 0.450 Km.) SH - Construction of RCC road etc. during the year 2025-26
Construction of Boundary Wall of Boys Hostel, Girls Hostel and Staff Quarter at Gomati District Polytechnic, Fulkumari, Gomati, Tripura in connection with starting of new Kendriya Vidyalaya at Banduar, Udaipur Gomati District
Mtc. of road from Masterpara Chowmohani Kalibari to Hanuman Mandir under Matabari block, Gomati, Tripura / S.H Patch repairing, Carpetting allied works during the year 2025-26
Mtc. of different PWD roads within Mohanpur section under the jurisdiction of Jirania Sub-Division, PWD(R and B) during the year 2025-26 SH Grouting, Patch-carpeting, seal coat, palasiding, RCC Drainage, CD work etc.
Development of road during the year 2025_26_Maintainance of road from Satsang chow. ( GB_ITI road) to noagaon bazar during the year 2025_26 under the jurisdiction of CSD_III_ SH. Patch soling, WBM _2,WBM_3 , DBM and BC, Maintenanace of Drain etc.
Strengthening of road from Harijoy Chowdhury Para to TEC road (Food Godown) Via Binapani (L 1.20 Km, from Ch.2.030 Km to Ch.3.230 Km) under Jirania RD Block.
(1) Construction of One Gents Toilet and One Ladies Toilet with water facility in the Main Gate Near NCC P.S. (2) Construction of One Gents Toilet and One Ladies Toilet with water facility in the VIP entry of Secretariat.
SH PATCH WBM 2 PATCH WBM 3 CARPETING WITH SAND SEAL COAT PUCCA DRAIN AND OTHER ALLIED WORKS (Job No TP COM 267 25 26)
Maintenance of Agartala Town Road during the year 2026-27 Maintenance of the Different road at Kalyan samiti, Sathlakhi bari road, Steel bridge road and Master Para road etc SH RCC and Brick Masonary work
Maintenance of all Internal Roads of Khosbagan, Surjya Chowmuhani and Hawkers Market Area SH RCC, PMC, Brick Masonary Work etc
Repairing and renovation of western side of building up to the Conference Hall of Birchandra State Central Library excluding sanitary works, Agartala
Maintenance of Government residential building during the year 2025-26 SH Repair Maintenance of Type V and Type VI Quarters at Kunjaban Township Qtr. Complex, Agartala.
Renovation of new Secretariat building by exterior painting works at Kunjaban extension, Agartala under the jurisdiction of Capital Complex Sub-division No-II (Building) under Capital Complex Division during the year 2025-26 ( Phase-I).
FDR/Mtc of different roads under Ampi PWD (RandB) Sub-Division under Ompi R.D. Block/SH- Patch repairing by WBM-3, Carpeting, Sand seal coat, protection work etc. during the year 2025-26 (Group-IV)
Construction of B plus G plus 5 storied Court building at District and Session Judge Court Complex, Agartala_SH_ Building portion including Internal water supply, Sanitary Installation, Sewage and Drainage works, Internal Electrification Works, Firef
SH- WBM-III, Repairs of potholes, Carpeting, Re-carpeting, Seal coat etc. during the year 2025-26.
Improvement of road from Chandrapur to Aralia Bridge Embakment RoadL1200.00 mtr SH Construction by GSB, WMM, BM, BC and retaining wall under ward No 25 of AMC under Scheme of Special Assistance to states for Capital investment for 2024 25 Re surfacei
Construction of boundary wall around MBB University Administrative Building and MBB University Academic Building during the year 2025_26
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 3.20 Km to 3.95 Km. (2nd Call)
Vertical extension of first floor second floor over existing ground floor Providing Installation and commissioning of Hiwall Split type Air Conditioning Machines at Tribal Research Cultural Institute Govt of Tripura at Lembucherra Mohanpur
Renovation the infrastructural facilities at The Netaji Subhash State Homoeopathic Hospital, Renters Colony, Agartala during the year 2024-25 SH Wood and PVC Work, Repairs to buildings, Water proofing treatment ,Aluminum works, Finishing Works etc.
Construction of 2 nos 300 seated temporary class rooms for AGMC and GBP Hospital during 2025-26
SH Grouting Carpeting with sand seal coat and other allied works
External painting of Muktodhara Auditorium and boundary wall including varnishing, aluminium door etc
Maintenance of Non-Residential buildings during the year 2025-26 SH Mtc. Of different offices of Netaji Complex incl Govt. quarters under the jurisdiction of Central-II Sub-Division, Agartala
Repairing of roof ceiling of 2nos Type-II High Court Staff Quarters at 3rd block, Old complex, Eastern side, Ground and 1st floor and repairing of slope at doorstep of balcony of 2nos T-II Staff Quarters New complex at Ram Nagar Road No.3, Agartala,
Maintenance of road from Kalisankar thakur para to Baidhya kobra under PWD(R and B) Mandwi Sub-Division, during the year 2025-26..(Length to be repaired from Ch 0.00 Km to 0.50 Km 0.50 Km) Group - I.
Improvement road from Kamalnagar School to Bijoynagar via Mijanur Rahaman House ( L- 1.005 KM ) under Boxanagar Block SH GSB WBM 3 Carpeting Seal coat RCC Boxcell RCC Retaining wall pucca drain Protection Wall and other allied works
Mtc of road from Manaipathar Bazar to Karolapara(L 5.00 km) under the jurisdiction of Kathalia PWD(RandB) Sub Division during the year 202526 SH Soling repair missing soling Palasiding and other allied works
SH Grouting Carpeting with sand seal coat and other allied works
Improvement. of road from Narayanbari Ration Shop to Office Tilla under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting and other allied works. (L 0.38 Km, Ch 0.80 to 1.18 Km) Gr-III.
Improvement of road from Kali Chowmuhani to Kaiyachanbari via Natunbari under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH GSB, WBM-3, Carpeting and other allied works. (L 0.38 Km, Ch 0.00 to 0.38 Km). Gr-I
Maintenance of different roads under the jurisdiction of PWD(R and B) Jirania Sub-Division during the year 2025-26 S.H Repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil..(Group IV)
Mtc. of road at Uttar Ramnagar near Kali Mandir, during the year 2025-26/ SH-Construction of RCC drain
Improvement. of road from Narayanbari Ration Shop to Office Tilla under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting and other allied works. (L 0.40 Km, Ch 0.40 to 0.80 Km) Gr-II.
Maintenance of road side berm / drainage system from Gomati DM office to Bramhabari / Construction of RCC cover Drain during the year 2025-26