Loading…
Loading…
224 live89 closing this weekmost from Integral Coach Factory and Indian Railways
224 results • Latest
KIT ITEMS FOR UNDER FRAME, FRAME WORK (VB SLEEPER DTC)
SET OF MOUNTING BRACKET FOR BIO TOILET TANK (VB SLEEPER MC, TC, NDTC)
S,I,T&C OF EMERGENCY TALK BACK UNIT FOR LSCN/PANTRY CAR COACHES, LSLRD COACHES AND LWS/ OF AMRIT BHARAT RAKES
S & I BODY SHELL ITEMS & PARTITION FRAMES (VB SLEEPER NDTC)
Supply & Installation of SAP Certified Hardware, Upgradation of SAP S/4 HANA1809 to 2025 version, Migration of existing SAP System, on turnkey basis,including Post- implementation Hardware & Software Support, at Integral CoachFactory, Chennai - 600 038
C/S of Frame work, Welding parts and Carline (VB Sleeper DTC)
BODY BOLSTER ASSEMBLY (VB SLEEPER MC, NDTC, TC & DTC)
SHELL KIT (EMU D RAPID METRO)
DOOR CUT OUT (VB SLEEPER DTC)
IGBT BASED 3 PHASE PROPULSION EQUIPMENT FOR EMU AIR-CONDITIONED (ON BOARD - 15 CAR RAKE)
IGBT BASED 3 PHASE PROPULSION EQUIPMENT FOR EMU AIR-CONDITIONED (ON BOARD - 12 CAR RAKE)
1.2mm thick CO2 solid coil wire