Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,467 results • Latest
Constructing Inleting Structure and gabion wall at ch, 26940 m on Gada Sinjiwada Drain near village Kasbara.
Constructing Box type V.R.B. in place of damaged Pipe type VRB at ch. 24300 ft m on Sinjiwada Distry.
Constructing Barrel Type RCC Canal VRB in Place of Pipe Type Canal VRB at Ch. 7240 mt of Daheda Distributory.
Constructing New Pipe inlet in place of damaged pipe inlet at various chainage on limbali devataj Gada drain.
Construction new box type V.R.B. at ch. 585 m on Parallel drain Tarapur Rinza road near village Kanawada.
Constructing and providing gabion wall at ch. 5060 m of Tarapur Moraj Zhichaka Drain.
Constructing Protection wall in place of damaged protection wall at ch. 9960 mt on Jalsan Distry.
Constructing Box Type VRB in place of damaged pipe type VRB @ ch. 1110 m on Hariyan Malu emergent drain.
Constructing Box type VRB in place of damaged pipe VRB at ch. 0 mt on Baliya kaka kyari lateral drain.
Constructing and Providing gabion wall at ch. 6400 mt on RHS side of Alang 5 Drain.
Renovation and Restoration Of Ilol Minor No.2/2 Of D5R Distry Guhai Main Canal At-Ilol Ta- Himmatnagar
Providing the services of continuous monitoring, operation, functioning and vigilant inspection of Khatriba pipeline connected villages valve At Limb to Bhudasan Ta.Bayad Dist.Arvali For month July 2026 to march 2027
construction of Paver Block and Repairing of ISR Building, Construction work of Security Cabin Without Toilet Block At (1) Near Spillway (2) On Earthen bund and (3) Security Cabin With Toilet block at downstream Side near Existing of Room at Machhundri Dam site.(Third Attempt)
Construction Work of Compound wall at Section Colony of Rudramata Dam in Loriya Village of Bhuj Taluka of Kachchh District
Construction of Mekran Kotay Recharge Tank across Local Vokla near Village Kunariya in Bhuj Taluka of Kachchh District
Construction of Kunariya Pond across Local Vokla near Village Kunariya in Bhuj Taluka of Kachchh District
FDR Work of Kaila Big River Checkdam near Village Zura in Bhuj Taluka of Kachchh District
Providing Pipeline in watercourse near 10 No. Kundi of Gajod Medium Irrigation Scheme in Mundra Taluka of Kachchh District
Providing consultancy service for Lift Irrigation Project for feeding various tank of Khedbrahma Taluka from Dharoi reservoir Project Ta.Khedbrahma Dist.S.k
Providing and erecting LED Street light, Flood light, pole, Pole box, cable, cable tray, Stabilizer, Starter repairing, Magnetic Brake servicing and Dismantling of existing old material and other electrical works at Khedva Irrigation Project. (Dist.: Sabarkantha)
Constructing a Lift Irrigation Scheme at Lotarva-1. Ta. Vyara Dist. Tapi
Constructing a Lift Irrigation Scheme at Lakhali. Ta. Vyara Dist. Tapi
Constructing a Lift Irrigation Scheme at Ramkuva. Ta. Vyara Dist. Tapi
Consultancy work for survey investigation, design including necessary approval of DTS and DTP for Right Bank Main canal Network of Baldeva Irrigation schemes Di- Bharuch
Consultancy Services for Preparing techno economic Physibility report for filling the various tanks around Narmada Main canal based Watrak , Mazam Meshwo pipeline ( having length of 93km) up to range of 7 km both side in Aravalli , Kheda and Mahisagar dist hydraulic design with Estimation etc completed
Installation of gate across the approach road of Mazam Earthern dam
Consultancy Services for Preparing techno economic Physibility report for filling the various tanks around Narmada Main canal based New Lift Irrigation scheme upto range of 7 km both side in Aravalli and Kheda districts including surveying,planning with E hydraulic design with Estimation etc completed.
Restoration work of Magiyasar Pond of Village:- Ratnal
SUPPLY INSTALLATION TESTING COMMISSIONING OPERATION & MAINTENANCE OF REAL TIME STRUCTURAL HEALTH MONITORING INSTRUMENT SYSTEM AT UKAI DAM PROJECT.
Widening, Resurfacing and Strenthning work of Gundiwada to Rabarigoliya Rehabilitation and Peri-Feri Road of Sipu Dam project, Ta. Dantiwada, Dist. Banaskantha.
Providing consultancy services for Pipeline work for Amargadh and Bibar Villages From Nirona Left bank Main Canal Ta.Nakhatrana Dist.Kachchh.
Widening, Resurfacing and Strenthning Work of Rampura to Rampura (Panswal) Peri-Feri Road of Sipu Dam project, Ta. Dantiwada, Dist. Banaskantha.
Constructing checkdam across Uchh River near Pancheshwar Mahadev Mandir Taluka Sankheda District Chhota Udepur
Strengthening of pond at village : Chikhala Talav (Patiya Talav) Ta.ValsadDi.Valsad (Fifth Trial)
Improvement of village tank at village Bhagdavada,Ta.Valsad, Dist.Valsad (Fifth Trial)
Constructing a checkdam cum Causeway at Village:Biloniya (On Road to mulgam) , Taluka:-Kaprada, District :Valsad (Third Trial)
Constructing ovara at Village :Nargol Uplo Talav,Ta.Umargam Dist. Valsad. (Fifth Trial)
Repair to water harvesting structure Village :- Makadban Taluka : Dharampur , District :Valsad (second Trial)
Repair to water harvesting structure Village :- Astol, Taluka :Kaprada , District : Valsad (second Trial)
Constructing ovara at Village :Nargol Ovaniyu Talav, Ta.Umargam Dist.Valsad. (Fifth Trial)
Constructing a Flood Protection Wall at village :Surwada (Near Temple)Ta. Valsad, Dist. Valsad (Fifth Trial)
Construction of RCC ESR, Tubewell (Bore) , Pumping Machienary and Pipeline at Kaval Village Desai Faliya Ta. : Nanapondha, Dist. :-Valsad (second Trial)
Constructing a Flood Protection Wall at village: Sukhala (samshanbhumi) Ta-Kaprada ,Dist-Valsad (Third Trial)
Constructing ovara at Village :Nargol Kumbhar Talav, Ta.Umargam Dist. Valsad. (Fifth Trial)
Construction of RCC ESR at Karaya Village Barambed Faliya Ta. : Nanapondha, Dist.:-Valsad (second Trial)
Constructing a Flood Protection Wall at village :Balda, Ta.Pardi, Dist.Valsad (Third Trial)
Constructing a Checkdam cum causeway at Village:Nadagdhari Tal.Dharampur, Dist. Valsad (Third Trial)
Constructing a Flood Protection Wall at village:Ambheti (Rohit f.) Ta-Kaprada ,Dist-Valsad (Second Trial)
Construction of RCC ESR, Tubewell (Bore) and Pumping Machienary at Nanitambadi Village Brahman Faliya Ta. : Nanapondha, Dist. :-Valsad (second Trial)
Constructing a checkdam at village : Sondhalwada, Taluka:-Pardi, District :Valsad (Third Trial)