Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
10,082 results • Latest
Repairing and Renovation of Government Hostel (Boys) building at Chhotaudepur Ta. & Dist. Chhotaudepur (Main Gate, Security Cabin, Compound wall, Retaining wall, House Master quarters)
Annual Rates for Maintaining and Repairing Various Roads Works under (R.&.B) Sub Division Kodinar, Dist. Gir Somnath (Road repairing by Supplying and Laying of Hotmix Materials and other Misc. work)
Providing and erecting Temp Sound System For Air Force band performance in Kachchh district, Dt.09/08/2026 with rehearsal day before an event.
Providing and erecting Temp LED Screen and Multi Media for Air Force band performance in Kachchh district, Dt.09/08/2026 with rehearsal day before an event.
Resurfacing and Strengthening Vadgam- Memadpur- Panchada- Sisrana- Mumanvas Road, Km 0/00 to 29/980 (MDR( (Work in Ch. 0/0 to 18/00) (5th Attempt)
Repairs to Street Light and Street Light Cable in Court Building Santalpur, Varahi, Dist. Patan.
Addition & Alteration to Light Fittings,Fan and Split A.C. Machine In Old Conference Hall,At Jilla Seva Sadan,Patan
Annual Rate of Gardeing and landscaping Work Under Road and Building Division Morbi
Providing outsourcing service of Wireman & Liftman for Nadiad R & B Electrical sub division, Nadiad. (For 11 Month)
S.R.to E.I. of Jilla Seva sadan,Nadiad,Dist.Kheda.
STRENGTHENING AND RESURFACING OF NANDANA MAHADEVIYA PINDARA ROAD (KM. 0/4 TO 6/3
Repairing and Renovation work at ITI Valod Ta. Valod Dist.Tapi
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra –Dungar-1, Ta.Rajula , Dist. Amreli (Second Attempt)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra –Dungar -5, Ta.Rajula, Dist.Amreli (Second Attempt)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Chanch 5 Ta.Rajula Dist. Amreli. (Second Attempt)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Kolivad-2 Ta.Jafrabad, Dist.Amreli (Second Attempt)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Khera-1, Ta.Rajula,Dist.Amreli (Second Attempt)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra –Dungar -6, Ta.Rajula, Dist.Amreli. (Second Attempt)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Morangi-2, Ta.Rajula, Dist. Amreli (Second Attempt)
Providing temporary Sound system for District level celebration of Independent day of kheda district on Dt:15/08/2026. (with rehersal)
Providing temporary Illumination and Roshni at various governemnt building for District level celebration of Independent day of kheda district. (From Dt: 14/08/2026 to Dt:15/08/2026,2 days)
Providing temporary E.I.and D.G.Set for district level celebration of independent day of kheda district on Dt: 15/08/2026. (with rehearsal)
Supply of Street Light LED Fitting for Street Light Maintenace Work at Street Light Store, Near Mahatma Mandir at Gandhinagar
Constructing a various C.C. Roads under Budget Lump Provision 2025-26 (Normal) in Taluka Bharuch Dist. Bharuch (Package No. 46/2025-26) (I) Rosako Flat to Narayan Avenue and Rangkutir to ROSKO Society joining road Ch. 0/0 to 0/70 village Bholav Ta. Bharuch Dist. Bharuch (II) Rosako Flat to Narayan Avenue and Rangkutir to ROSKO Society joining road Ch. 0/0 to 0/30 village Bholav Ta. Bharuch Dist. Bharuch
(Package No. 6) Resurfacing and Strengthening of Motali to Samor Road Ch. 0/0 to 2/0 Ta. Ankleshwar Dist. Bharuch under MMGSY-2026-27 (Tribal)
(Package No. 4) Resurfacing and Strengthening of Mandava Main Entrance Road Ch. 0/0 to 1/30 Ta. Ankleshwar Dist. Bharuch under MMGSY-2026-27 (Tribal)
Constructing a various C.C. Roads under MMGSY 2025-26 (Normal) in Taluka Ankleshwar Dist. Bharuch (Package No. 2025-26/44) (I) Construction of Andada village border to Motali village joining road Ch. 0/0 to 0/50 Ta. Ankleshwar Dist. Bharuch (II) Construction of Ashok vatika to Akshardham joining road Ch. 0/0 to 0/45 Ta. Ankleshwar Dist. Bharuch (III) Construction of Chhapra Patiya to N.H. Vagi vaga joining road Ch. 0/0 to 0/40 village Andada Ta. Ankleshwar Dist. Bharuch
(Package No. 85) Construction of Hanuman Temple to Mandava Veraimata Temple joining Road Ch. 0/0 to 1/40 Ta. Ankleshwar Dist. Bharuch under MMGSY-2025-26 (Normal)
(Package No. 84) Construction of Amaratpura village Panchayat to Airport joining Road Ch. 0/0 to 0/85 Ta. Ankleshwar Dist. Bharuch under MMGSY-2025-26 (Normal)
Kerwada village C.C. Approach Road Ch. 0/00 to 0/600 Taluka Amod Dist. Bharuch under Suvidhapath Year-2025-26 (Normal) (Package No. 92)
(Package No. 48) Construction of Amleshwar to Kothiya Road at Ch. 0/00 to 3/00 Ta. Bharuch Dist. Bharuch
(Package No. 14) Resurfacing and Strengthening of Thakor Talavadi Approach Road Ch. 0/0 to 0/800 Ta. Amod Dist. Bharuch under MMGSY-2026-27 (Normal)
(Package No. 5) Resurfacing and Strengthening of Naugama Navi Vasahat to Main Road Ch. 0/0 to 1/00 Ta. Ankleshwar Dist. Bharuch under MMGSY-2026-27 (Tribal)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Balapur, Ta.Bagasara Dist. Amreli (Second Attempt)
Construction a various C. C. Roads (Kahanva Bhagod to Kural Road and Kareli Macheravaga Machera Talavdi Village Road) under Suvidha Path 2025-26 (Normal) in Taluka Jambusar Dist. Bharuch (Total: - 2 Roads) (Package No. 59/20256-56)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Munjiyasar-2, Ta.Khambha Dist. Amreli (Second Attempt)
ProvidingTemporary Illumination for Celebration of Independence Day-2026 at Various Government Buildings of Dist. Anand from 14.08.2026 to 15.08.2026 (for 2 Days)
(Package No. 13) Resurfacing and Strengthening of Gajera-Rajwadi Road Ch. 0/0 to 0/600 Ta. Jambusar Dist. Bharuch under MMGSY-2026-27 (Normal)
Constructing a C.C. pavement on Ochchhan village C.C. Approach Road Km. 0/00 to 1/50 Ta. Amod Dist. Bharuch under Suvidhapath (Normal) Year-2025-26 (Package No. 65)
Construction of Anganwadi – Nandghar (Frame Structure) At Kendra – Padarshinga-3 Ta. Lathi Dist. Amreli (Second Attempt)
Construction a various C. C. Roads (Piludra Hathipura Village CC Road and Kava Village CC Approach Road) under Suvidha Path 2025-26 (Normal) in Taluka Jambusar Dist. Bharuch (Total :- 2 Roads) (Package No. 61/20256-56)
(Package No. 3) Resurfacing and Strengthening of Nava Kasiya Entrance Road Ch. 0/0 to 0/70 Ta. Ankleshwar Dist. Bharuch under MMGSY-2026-27 (Tribal)
(Package No. 1) Resurfacing and Strengthening of Andada to Kachalivadi Road Ch. 0/0 to 2/0 Ta. Ankleshwar Dist. Bharuch under MMGSY-2026-27 (Normal)
(Package No. 9) Construction of Gajera to Bhramanvasi joining Road Km. 0/0 to 0/70 Taluka Jambusar Dist. Bharuch under MMGSY-2025-26 (Normal).
Providing Temporary Sound System for Celebration of District level Independence Day-2026, Dist. Anand. (with rehersal)
(Package No. 93) Resurfacing and Strengthening of Ochhan-Sapa Road Ch. 0/0 to 2/00 (As per site Km. 0/0 to 1/0) Ta. Jambusar Dist. Bharuch under MMGSY (Normal) Year-2025-26.
(Package No. 49) Construction of Chaulad to Bhersam Road at Ch. 0/00 to 3/00 Ta. Bharuch Dist. Bharuch
(Package No. 12) Construction of Kareli Nathachar main Road to Lakhatiyavaga Road Km. 0/0 to 1/00 Taluka Jambusar Dist. Bharuch under MMGSY-2025-26 (Normal).
(Package No. 9) Resurfacing and Strengthening of Dora Approach Road Ch. 0/0 to 1/200 (As per site 0/00 to 0/600) Ta. Amod Dist. Bharuch under MMGSY-2026-27 (Normal)
(Package No. 86) Construction of Khodiyar Nagari to Samshangruh joining Road Ch. 0/0 to 0/40 Ta. Ankleshwar Dist. Bharuch under MMGSY-2025-26 (Normal)