4,829 results • Latest
TTPS Operation Circle MPM I Unit I Removal of all the damaged insulation in the Hot Primary Air ducts from Air preheaters to mills and insulating the ducts with LRB wool mattresses and cladding with G.I sheet of 0.63mm thickness and removal of ash an
TTPS Operation Circle MPM I Unit I Machining or reconditioning of R.C feeder spares
TTPS Operation Circle MPM I Unit I Inspection, overhauling and commissioning of actuators for both manual and electrical operation in Hot air dampers during the forthcoming overhaul.
TTPS Mech II TM I Unit I Overhauling of steam and condensate valves of Turbine Regeneration system during forthcoming overhaul
TTPS Mech II TM I Unit I Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves during forthcoming overhaul
TTPS Operation Circle MPM I Unit I Replacement of eroded Coal pipe lines, bends and fittings between Mills A, B and C and Boiler during the forthcoming overhaul
TTPS Mech II TM I Unit I Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets i
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
TTPS Mech II TM I Unit I Reconditioning of Lub oil Seal oil cooler cooling water butterfly Gate valves of various sizes during forthcoming overhaul
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 and 2 during the forthcoming overhaul