Loading…
Loading…
4,829 results • Latest
TTPS Mech II TM I Unit I Condenser Repairing and arresting the leak points in the longitudinal bellows and side walls of LPT Exhaust hood during forthcoming overhaul
TTPS Mech II TM I Unit I Inspection overhauling and commissioning of condenser butterfly valves and steam line valves actuators during the forthcoming overhaul
TTPS Mech II AHP Unit I Annual overhauling works of pumps valves in sea water Booster Pumps during the forthcoming overhaul
TTPS Operation Circle CAD CWPH I Unit I Annual Overhauling of internal and external assembly and Reconditioning of C.W.P Internal spares 1A, 1B, 1C and 1D of Unit I
TTPS Mech II AHP Replacement of Regular make up jetting assembly connected pipe Lines flushing header assembly overhauling of valves cleaning and welding of seal trough in unit I BAH during forthcoming overhaul
TTPS Operation Circle CAD ACWPH Unit I A.C.W System Annual overhauling of valves, strainers and NRV s of A.C.W pumps and inlet and Outlet valves of Cooling Tower
TTPS Operation Circle CAD Annual Overhauling DG Set I Attending minor repair works, Dismantling and cleaning of Heat exchanger, DM water tank and Replacement of coolant
TTPS Operation Circle CAD Unit I CW pump 6.6KV, 500 KW Jyothi make CW Pump Motor Top Bearing Oil and Water Chamber and side Air Cooler Pipes cleaning, and complete cleaning of Converging and Diverging type Fan and Fan cover by using Soap Oil and Pain
TTPS Operation Circle CAD CWPH I Unit I Annual overhauling of TW screen 1A to 1D complete silt removal from pump suction end to TW screen channel entry gate for the year 2025 to 2026
TTPS Operation Circle CAD CWPH I Unit I Annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of Unit I