Loading
Loading…
Loading…
5,832 results • Recent activity
MTPS I BM Unit I AOH 2025 26 Strengthening of the eroded portions of ESP hopper FG duct from ESP outlet to chimney and other related works in both A and B sides
OT003
MTPS-I ES CI Unit Turbine Area Replacement of gaskets for displacement type level transmitters and level switches. Removal and refixing of transmitters gauges and switches after calibration. Cleaning of all impulse lines and catch pots replacement o
Supply of LT Shackle Hardware
Protective Maintenance Works to the TG Column between EL 0.00m to EL 15.50m of Unit 5
004/25-26