Procurement of IBD drain line pipe
MTPS I BM Unit II Annual maintenance 2025 26 Hot primary air Ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and ducts etc
MTPS I TM Unit II Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2025 26
MTPS I BM Unit II Boiler Pressure parts AOH 2025 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes etc
MTPS-I ES Circle CI FSSS 1 2 Annual overhauling of retractor Assembly of HEA Ignitors, Flame scanners, Pr. Gauges switches , DP switches, Temp. gauges switches, Transmitters, SADC positioners, HAG solenoid valves etc., in Unit-II for the year 2025
MTPS I TM Unit II Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange, Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials for Unit II Annual overh
MTPS-I ES Circle EM-II CWPH - Repair and Servicing of 3 phase, 6.6KV,1175 KW, BHEL make, 494 RPM, vertical mounted HT motor of CWP 2B Sl.No 32126 A 404 016
MTPS I M I CA CWS I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of Clarifier II during AOH 2025 26
MTPS I TM Unit II Removal and Re insulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
MTPS I BM Unit II Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment etc