Loading…
Loading…
5,803 results • Latest
NCTPS I SE MI circle AMC 25 26 BM Dn Unit III Routine Maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning boiler structure I and II pass in Boiler
SUPPLY OF 3.5 FEET V CROSS ARM AND 4.5 FEET V CROSS ARM
SUPPLY AND ERECTION OF 90 Deg in addition to 90 Deg FABRICATED CERAMIC COAL BEND FOR ZGM 133 G II MODEL VERTICAL ROLLER COAL MILL 4 ITEMS As per the drawing enclosed
NCTPS I SE MI circle AMC 25 26 BM Dn Unit II Routine maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning Boiler structure I and II pass in Boiler pressure parts areas
NCTPS I SE MI circle AMC 25 26 BM Dn Unit I Routine Maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning Boiler structure I and II pass in Boiler pressure parts
ICHP- Cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure alongwith the Conveyors-54,49,