Loading…
Loading…
4,890 results • Latest
Removal and refixing of hanging G I sheet with providing scaffolding arrangements in front of bottom side economizer slope area 20 mtr width in boiler 2nd pass at 43 mtr elevation and CRH vertical line at 42mtr elevation in-between boiler and bunker
Supply of TC Fuse Wire 24SWG
Manufacturing and Supply of Flash Tank I with steam collectors for 210MW LMW Design Turbine as per drawing 1 No
Supply of TC Fuse Wire 22SWG
Axial piston pump along with the bell housing unit to mount over the existing flange for HP LP bypass system Oil supply unit Make BOSCH Equivalent
Supply of Silicagel
Supply of LT Pin Insulator
Various Spares suitable for 210 MW LMW Design Turbine 4 items as per the specification
Supply of LT Shackle
Supply of Spares For Boiler Feed Pump MAKE WEIR Model FK6D30 10 Items as per specification