Loading…
Loading…
6,017 results • Recent activity
MTPS I Mill Plant Unit IV Dismantling the eroded 90degree Ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system during Annual overhaul
MTPS I BM DM Plant Overhauling of Boiler Fill Pumps Hot well make up Pumps Effluent Water Transfer Pumps Degassed Water Transfer Pumps DM Water Transfer Pumps Stator Water Pumps Acid and Alkali unloading pumps in DM Plant Stage I and II and CST
MTPS I BM Unit I Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I Mill Plant UNIT IV Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4A
MTPS I BM Unit I Boiler pressure parts AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate
MTPS I Mill Plant Unit IV Patch Welding of eroded portion of Hot Air ducts 4A to 4F worn out portion of hot air duct joints and providing guard plates for the expansion joint areas of hot air ducts 4A 4B 4C during overhaul 2025 26