Loading…
Loading…
4,520 results • Latest
Spec.no.26-II/25-26,hiring of Vehicle to Assistant Executive Engineer/MRT/Metering for a period of three years from the date of receipt of award of contract under open tender
House keeping work at central office krishnagiri
Supply of TC Fuse wire 32 SWG
Supply of I_P Converter _without fail freeze along with pressure gauge _ 50 Nos
Supply of TC Fuse wire 18 SWG
Procurement of Lighting material 4 Items
SS Braided Hydrogen gas manifold hoses 20 Nos
Supply of TC Fuse wire 16 SWG
Procurement of True RMS Digital Multimeter 10 Nos
Supply of Various Types of Solenoid valves _ 4 Items _ 11 Nos
Supply of TC Fuse wire 14 SWG
Supply Of Refrigerant Gas and Cylinders R407C Gas 150 Kgs R407C Gas Cylinders 2 Nos
Supply of TC Fuse wire 12 SWG
Supply of Bolts and Nuts of size 88 x 16 mm
Supply of Sealed Lead Acid Battery under buy back of old batteries 2 Items
Re tender - Hiring of 01 No Diesel driven vehicle for AEE/SPL.MTCE/GOBI for the period 01 Year
Supply of Bolts and Nuts of size 75 x 16mm
Extension Works in Chinniyampalayam Subdivision of Ondipudur Division
Hiring of vehicle for the use of FOC VPM
Supply of Bolts and Nuts of size 63x16mm
Hiring of vehicle for the use of Ex Serviceman Squad Villupuram
Dindigul EDC - Supply of HT TI Fittings
Hiring of vehicle for the use of EE Gl cum MRT Villupuram
TTPS Mech II BM Unit I Replacement of boiler pressure parts tubes bends in II pass of Unit I Boiler during overhaul for the year 2025 2026
TTPS Mech II BM Unit I Replacement of boiler pressure parts tubes bends in I pass of Unit I Boiler during the year 2025 2026
TTPS Mech II BM Unit I Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2025 2026
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit I Boiler during the year 2025 2026
Sale of scrap materials available at Central Stores, Vellore, Ranipet Pole yard and Melpadi 33/11KV Old Sub-Station
Extension Works in Central Division
Extension Works in Urban Division
PMS and providing Ship insights by Live Tracking AIS and reporting of vessel positions and status at sea of TNPGCL chartered vessels engaged for coastal transportation of thermal coal in East Coast of India
Construction of New chain link fencing at North and West side of AEE OM Mallur Sub Division office and AE OM Rural Mallur Section at Mallur 110 22 KV SS premises
Procurement of Electro Pneumatic Positioner 4nos.
procurement of Large Video Screen and 22inch Monitor LED Backlit LCD Monitor
Procurement of Temperature Gauge, Transmitter and RTDs 4 Items
Gate Valve NRV Valve and Butterfly Valve for Fire Hydrant and Spray system 5 Items
MTPSIES circle CI Division FSSS 34 sub division- Rectification of Defective FSS System Electronic Modules Procontrol p13-42 System of Unit-III IV Short Tender
10/26-27 DT 21.05.2026 Hire vehicle for the use of AEE/Rural/Ramnad
Supply of MS Flange Suitable for 400 NB MS ERW pipes 100 Nos
Supply of 20000Nos of Aluminium Knob
Improvement works to the rear North side (VDR Division office and Technical wing area) window sunshades and allied Civil works in Central office building at Virudhunagar
Supply of 6000Nos LT 1Ph Angle X ARm
Improvement works by providing chain link fencing in the North side compound wall end towards East side 30m and at East side 85m and continuation East side 27m at 33/11KV Satchiyapuram SS premises in Virudhunagar EDC.
Improvement works of Re-constructing the fallen and damaged compound wall at North East side and colour washing and art works to the front compound wall outer side for the balance length of 14.00m from North end 110/11 KV Sattur SS
Improvement works of spalled and distressed RCC Pole structures 6 Nos. in Power Transformers 1, 2 and 3 in 110 KV Yard at 110/33-11 KV Aruppukottai SS premises.
Improvement works of Supplying and filling 10 to 20mm HBGS metal to 110 KV yard, additional yard base walls construction and replacement of damaged cable trench cover slabs at Virudhunagar 110/33-11 KV SS premises.
Hiring of vehicle for the official use of EE O M KVadamadurai
Improvement estimate for improving tailend voltage in Kolvel SS II 100 KVA DT by providing 1 no proposed 63 KVA Distribution Transformer under Urban Kulasekharam Section
MTPS II Steam Generator Cleaning of HFO HSD Guns operation follow up of soot blowers retracting of blowers manually if required and emergency breakdown works for a period of 365 Days from the date of taking over of the site
MTPSIES circle EMI Dismantling the defective Stator water cooler 4Nos, attending the defect in the released Stator water cooler and re-erection of the Stator water cooler in its bed for Unit I to IV for a period of 12 months from the date of commenc