Loading…
Loading…
6,261 results • Latest
Providing, Fixing with installation of survacllance camera at Barna Dam House,Saddle Dam and O/c of EE Barna LBC Division Bair.
On Turnkey Basis Construction of Chipakhedi Barrage cum Causway, as per detailed scope of work but not limited to that.
Providing, Fixing with installation of survacllance camera at Barna main Dam Bair
On Turnkey Basis Construction of Dhavdiya Barrage, as per detailed scope of work but not limited to that.
Construction of Dondwada Barrage
On Turnkey Basis Construction of Borpada Barrage, as per detailed scope of work but not limited to that.
Regulation work on Heads and Cross Regulator (round the clock) at RD 12.581 of RWB, RD 58.00 of RWD (Kanwani Head), RD 77.000 (Sardarpura Head) of RWD and RD 97.500 of RWD for the year of 2026-27
Pre-mansoon oiling/greasing compounding work, repair of damaged floating shaft flange coupling, repair and painting of wlkway and railing and installation of barrier at Parasdoh medium irrigation project under WRD Division Multai District Betul
Hiring of Mahinfra Bolero Touring Vehicle for for Govt. Work Under Light Machinery and E/M. Sub-Division Harda ( for 12 Months)
Supply of Labour work for Sub-division No.1 Tawanagar