Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
458 results • Latest
Construction of Boundary Wall for protection of encroachment of Govt. Land and Repair and Maintenance of Pump House at M-13/N, Gurpara MDTW Centre under Ranaghat-I (A-I) Sub- Division under Kalyani (A-I) Division Nadia under Core Sector 2025-26
Renovation of pipe Line including wiring at 518N, Hatsambhuganj (Block- Ranaghat-I, G.P - Anulia, Mouza-Hatsambhuganj, J.L. No - 127, Plot No - 1 ) DTW Centre under Ranaghat-I(A-I) Sub- Division under Kalyani (A-I) Division of Nadia under Core Secto
Renovation of pipe Line and Repair and Construction of Boundary Wall for protection of encroachment of Goverment Land including wiring at 539/N, Beliati HDTW Centre under Ranaghat-I Block under Kalyani (A-I) Division in the District of Nadia un
Lifting and Lowering of Vertical turbine,Submersible Pump Motor assembly of DTW,HDTW installation under Chakdaha(A-I) Sub-Division and Rewinding and repairing of Submersible Motor of different capacities and make with repairing of Submersible Pump Bo
E. Rewinding and repairing of Submersible Motor of different capacities (15HP -3nos) and make with repairing of Submersible Pump Bowl Assembly at Ranaghat-II (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the year of 20
D. Rewinding and repairing of Submersible Motor of different capacities (17.5-20 HP -10 nos) and make with repairing of Submersible Pump Bowl Assembly at Ranaghat-II (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the ye
Lifting and Lowering of Vertical turbine,Submersible Pump Motor assembly of DTW,HDTW installation under Chakdaha(A-I) Sub-Division and Rewinding and repairing of Submersible Motor of different capacities and make with repairing of Submersible Pump Bo
Lifting and Lowering of Vertical turbine,Submersible Pump Motor assembly of DTW,HDTW installation under Chakdaha(A-I) Sub-Division and Rewinding and repairing of Submersible Motor of different capacities and make with repairing of Submersible Pump Bo
A. Rewinding and repairing of Submersible Motor of different capacities (17.5-20 HP -6 nos) and make with repairing of Submersible Pump Bowl Assembly at Kalyani (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the year of
Installation of Solar operated LDTW (5 Nos) AT Mouza-Lakshmanpur, Hatilot and Gangadaspur in Salboni block in the District of Paschim Medinipur under Midnapore (AI) Division under Matir Shristi Programme for the F.Y- 2025-26.
Renovation of Gacha 384N DTW including Surging, Construction of New Pump House, Maintenance of Spout Chamber and RCC Pipe Line (WTA System) Internal Wiring Installation of Submersible ElectroMotor Pumping Set and M.S Connection, Restoration of Power
Repairing and Renovation of Sub-Divisional Store Building of Santipur (A-I) Sub-Division at Mouza-Udaypur, Block-Santipur under the Executive Engineer (A-I), Krishnagar-II (A-I) Division under Core-Sector Program for the Financial Year 2025-26.
Repairing and Rewinding 17.5 / 20 H.P, 3 Phase, 415/440 Volt, 1440 RPM 12 (Twelve) nos Induction Motor for different RLI Scheme under Berhampore (Agri-Mech) Sub-Division, Berhampore Murshidabad
Re-drilling against tubewell at Jabui D.T.W. (BN 158 ) including Repairing renovation of RCC pipe line Pump house with reconnection related works under Memari-II Development Block within Memari (AI) Sub Division under Burdwan(A-I) Divn
Construction of Solar Operated Pump Dug-Well (PDW 5nos.) Cluster at Mouza-Barghata, G.P.-Rupushpur under Khyorasole Dev. Block of Birbhum District under EE(A-I), Burdwan (A-I) Division under Core-Sector programme
Repairing Rewinding of 25 HP (15 nos.) 2800/2900/3000 RPM 3Phase 23/41 Amp 380/400/440 Volts 50 cycle A.C supply Submersible Burnt Motor Pump set of different make under Burdwan (A-I) Sub-Division under Burdwan (A-I) Division
Repairing Rewinding of 20 HP (15nos.) 2800/2900/3000 RPM 3Phase 23/41 Amp 380/400/440 Volts 50 cycle A.C supply Submersible Burnt Motor Pump set of different make under Burdwan (A-I) Sub-Division under Burdwan (A-I) Division.
Repairing Rewinding of 15 HP (8 nos.) 2800/2900/3000 RPM 3Phase 23/41 Amp 380/400/440 Volts 50 cycle A.C supply Submersible Burnt Motor Pump set of different make under Burdwan (A-I) Sub-Division under Burdwan (A-I) Division
Repairing and rewinding of 20 H.P. Submersible Motor - Pump set (10 nos.)of different make under Kalna-II (A-I) Sub-Division under Burdwan (A-I) Division
Repairing and rewinding of 17.5 H.P. Submersible Motor - Pump set (05 nos.)of different make under Kalna-II (A-I) Sub-Division under Burdwan (A-I) Division.
Repairing and rewinding of 20 H.P. Submersible Motor - Pump set (05 nos.)of different make under Kalna-I (A-I) Sub-Division under Burdwan (A-I) Division
Repairing and rewinding of 17.5 H.P. Submersible Motor - Pump set (05 nos.)of different make under Kalna-I (A-I) Sub-Division under Burdwan (A-I) Division
Repairing and rewinding of 4 nos 25 H.P Submersible Motor - Pump set of different make under Katwa (A-I) Sub-Division under Burdwan (A-I) Division
Repairing and rewinding of 10 nos 20 H.P Submersible Motor - Pump set of different make under Katwa (A-I) Sub-Division under Burdwan (A-I) Division
Repairing and rewinding of 10 nos 15 H.P Submersible Motor- Pump set of different make under Katwa (A-I) Sub-Division under Burdwan (A-I) Division
Drilling and installation of New Heavy-Duty Tube Well including Construction of Pump House and WTA Scheme at Mouza-Bamankhana, Block-Khanakul-I in the District of Hooghly at Mouza-Bamankhana, J.L No-04, Plot No-468, 469, 470 of Champadanga (A-I) S/D
Renovation of Water Transmission Arrangements from Old Damaged PVC Pipe Line to New UPVC Pipe Line of Tagra HDTW (HG-328) Scheme at Mouza Tagra, J.L.No.-32, Plot No.-788, Block-Tarakeswar under the Champadanga (A-I) Sub-Division under Chinsurah
Renovation of Water Transmission Arrangements from Old Damaged PVC Pipe Line to New UPVC Pipe Line of Belpara HDTW (HG-344) Scheme at Mouza Belpara, J.L.No.-109, Plot No.-582, Block-Jangipara under the Champadanga (A-I) Sub-Division under Chinsurah
Supply of MS shaft for Pump, Valve Spindle with wedge, GI top cover plate, gland packing etc.for smooth running of Major RLi Scheme Gazole (A-M) Sub-Division within Malda-I(A-M) Division under Non-Plan maintenance.
Supply and Transportation of GI top cover plate, valve spindle with wedge, M.S hose clamp and hexagonal head bolt and nut for maintenance of Major RLI Schemes under Malda-I (A-M) SD within Malda-I (A-M) Division under Non-Plan maintenance.
Installation of 01 No clustered (2) Sprinkler Irrigation system (Solar) at Buri Pukur WHT Scheme
Installation of 01 No clustered (2) Sprinkler Irrigation System (Solar) at Moyra Pukur WHT Scheme
Repair and Maintenance of External Elevation including Sanitary and Plumbing works od WRDD Administrative Building at Jl No 105 Plot No 1492 Mouza Dakra G.P Sukdevpur of Balurghat Block under Balurghat AI Sub Division of Balurghat AI Division
Renovation of Pump House and Pipeline with Spout Chamber Harishpur (B.N.-12) MDTW at Mouza- Harishpur, Block-Purbasthali- II, G.P.-Nimdaha, Mouza-Harishpur, JL No-10, Plot No.-127, Latitude-23.514608 Deg. N. and Longitude-88.235415Deg. E in the Distr
Installation of 03 (Three) Nos of Light Duty Tube Well (Solar Operated) of size 150 mm X 150 mm (PVC pipes, Depth 100 metre) at Mouza -Shibpur, JL No-112, Plot No-745, 677, 872, G.P.-Bilati within Illambazar Dev. Block in the district Birbhum under
Maintenance of Sub-Divisional Stores and Sub-Division Office at Mouza - Chandni Sahebgunj, J.L. No. - 07, Plot No - 09 (LR) of Suri (A-I) Sub-Division within Birbhum district under Burdwan (A-I) Division under Core-Sector Programme
New-Excavation of Dhanara Hapa - II at Mouza - Dhanara, J.L. No - 36, Plot No. -1625 Block - Ranibundh, Dist - Bankura under the Executive Engineer (AI), Bankura (AI) Division under Matir Shristi programme
Re-excavation and Allied structure of Kendbana Boner Bundh SFMIS at Mouza - Kendbana, J.L. No - 44, Plot No. - 75 Block - Indpur, Dist - Bankura under the Executive Engineer (AI), Bankura (AI) Division under Matir Shristi programme
Re-Drilling of Tube Well at Dakshin Krishnapur Govt. Owned and Operated DTW (BN-238) Scheme at Mouza-Dakshin-Krishnapur, Block-Kalna-II, Mouza-Dakshin-Krishnapur, GP-Badla, JL No.-202, Plot No.-1192, Latitude-23.1315Deg.N, Longitude-88.29596Deg.E. in
Special Renovation of Bahirranagachi (state own and operated) Major RLI Scheme under Sarasari Mukhamantri (core sector) Programme 2025-26 under Chinsurah (A-M) Sub-Division under Chinsurah (A-M) Division in the district of Hooghly
Construction of Kathuriapara New Handed Over Midi RLI Scheme (Electrified) at Mouza-Kansra, Block-Jamalpur under Memari(A-M) Sub-Division in the District of Purba Bardhaman, under the E E (A-M) Burdwan (A-M) Division under SSM CS 2025-26
Re-Excavation of Gowala Bandh Water Detention Structure (WDS) at Mouza-Domohani, Block-Barabani in the District of Paschim Bardhaman under the Executive Engineer (A-I), Burdwan (A-I) Division under JALATIRTHA (Phase-XI) Program.
Installation of 01 No clustered (2) Sprinkler Irrigation system (Solar) at Chasa Pukur WHT Scheme
New-Excavation of Dhanara Hapa - I at Mouza - Dhanara, J.L. No - 36, Plot No. -1951of1626 Block - Ranibundh, Dist - Bankura under the Executive Engineer (AI), Bankura (AI) Division under Matir Shristi programme
New - Excavation of Kalipahari Hapa - 2 at Mouza -Kalipahari, J.L. No - 3, Plot No. - 19 , GP-Hatgram, Block - Indpur, Dist - Bankura under the Executive Engineer (AI), Bankura (AI) Division under Matir Shristi programme
New - Excavation of Kalipahari Hapa - 1 at Mouza -Kalipahari, J.L. No - 3, Plot No. -50 of 101, GP-Hatgram, Block - Indpur, Dist - Bankura under the Executive Engineer (AI), Bankura (AI) Division under Matir Shristi programme
Re-Excavation of Dumda Tank - 2 at Mouza - Dumda , J.L. No - 172 , Plot No. -140 , 142 , 149 under Chhatna Block in Bankura District under the Executive Engineer (AI), Bankura (AI) Division under Matir Shristi programme
Rewinding and Repairing of 22.5 H.P. A.C., 3 phase, 2800-2900 RPM 50 Hz submersible motor of different make with repairing of submersible pump bowl assembly under Raghunathganj (A-I) Sub-Division under Berhampore-II (A-I) Sub-Division under NON-PLAN.
Rewinding and Repairing of 20 H.P. A.C., 3 phase, 2800-2900 RPM 50 Hz submersible motor of different make with repairing of submersible pump bowl assembly under Raghunathganj (A-I) Sub-Division under Berhampore-II (A-I) Sub-Division under NON-PLAN.
Rewinding and Repairing of 20 H.P. A.C., 3 phase, 2800-2900 RPM 50 Hz submersible motor of different make with repairing of submersible pump bowl assembly under Lalbagh (A-I) Sub-Division under Berhampore-II (A-I) Sub-Division under NON-PLAN.