Loading…
Loading…
1,211 live5,566 closing this weekmost from Local Self Government Department and PWD
1,211 results • Best match
Manbazar-Bandwan-Kuilapal Road (SH-5), from 31.00 Kmp to 33.00 Kmp, Maintenance and repair of road surface in stretches under Purulia Highway Division in the district of Purulia.
Up-gradation of B.T. Road, R.C.C. Surface drain, Street light & D.I. Pipe line at I/A Bhanpuri, Distt. Raipur (C.G.)
Road Marking and laying of thermoplastic compound with Reflectorising Glass Beads on Bituminous surface in all interchangers at Kolkata side flyover of Vidyasagar Setu.
Restoration of damaged road surface on Dum Dum Road within ch. 2 140 km to 3740 km, caused by excavation carried out by CESC for laying repairing of their HT LT electrical cables during the year 2026 27
... surface including clearing of road surface and spraying primer using ...
Construction of Concrete Road with Covered Surface Drain at Paikpara near H/O Azaruddin Mondal in Ward No- 26 under Rajpur Sonarpur Municipality.
Construction of Concrete Road with Surface Drain and Earth Filling near Sabuj Sangha, Natun Diara in Ward No. - 03 under Rajpur-Sonarpur Municipality
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Sallar on emergency basis by way of Snow Clearance (Stage 13) for year 2026-27
Ladhurka-Gamarkuli Road, from 0.00 Kmp to 7.00 Kmp, Repairing of road surface with premix carpet, seal coat, fog spray in stretches under Purulia Highway Division in the district of Purulia.
REPAIRING OF ASPHALTUM ROAD SURFACE AND CONCRETE, I.P.S PASSAGE AT 15/8/1, M.P. ROAD, 39/2/A, B.B. GHOSH SARANI AND ITS SURROUNDING AREAS IN WARD NO-14 DISTURBED BY C.E.S.C
Development of road from Promodnagar Mairung Kwrwi road to Mayung Bekreng TSR Camp Ch. 0.00 Km to Ch. 2.50 Km under Tulasikhar Block during the year 2026 27 SH WBM 3, Carpeting, Seal Coat and surface drains etc.
Maintenance of bituminous surface road using Jhama brick aggregate ...
S/R to Siba Das Chhack to Mahalaxmi Club via Praharajpur Tarini Chhack Road from 0/000 Km to 0/700 Km for the year 2026-27. (Such as surface repair with BUSG and SDBC)
... &materials after cleaning the road surface and rolling with PRR including ...
Integrated Development Works including Construction of Roads, Sewer Lines, Surface Drains and Boundary Wall at Pandit Din Dayal Dham Panjreh Residential Scheme, Singrauli, Madhya Pradesh
Integrated Development Works including Construction of Roads, Sewer Lines, Surface Drains and Boundary Wall at Pandit Din Dayal Dham Panjreh Residential Scheme, Singrauli, Madhya Pradesh.
Construction of Concrete Road , Surface Drain and RCC Slab casting at Natunpally Purbo, Natunpally Paschim R.G.Pally in Ward No. - 12 under Rajpur-Sonarpur Municipality
Restoration of Road surface below Airport Flyover (Kolkata flank) from Ch. 7.81 K.M. to Ch. 7.9 K.m. of K.N.I. Avenue (V.I.P. Road) under Baguihati Highway Sub Division under Barasat Highway Division No. - I in the District of North 24 Parganas
Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres
Restoration of Road surface from Ch. 7.20 km. to 7.80 km. (Kolkata flank footpath side) and Ch. 7.50 km. to Ch. 7.80 km. (Airport flank median side) of K.N.I. Avenue (V.I.P. Road) (RVNL constructed zone) under Barasat Highway Division No.-I, in the
Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres
Restoration of BT Surface to EB UG Cable cut Road at East Andal Street NSB Road Nandhi Kovil Street Nborth Andal Street Nepala Lane and Pathayakadai land in ward No.13 and 14
Restoration of road surface under the jurisdiction of PWN RnB Sub Division Pahalgam on emergency basis by way of Snow Clearance Stage 2 for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Seer on emergency basis by way of Snow Clearance (Stage 9) for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Seer on emergency basis by way of Snow Clearance (Stage 5) for the year 2026-27
Restoration of road surface under the jurisdiction of PW RnB Sub Division Pahalgam on emergency basis by way of Snow Clearance Stage 3 for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Sallar on emergency basis by way of Snow Clearance (Stage 11) foryear 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Sallar on emergency basis by way of Snow Clearance (Stage 14) for year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Sallar on emergency basis by way of Snow Clearance (Stage 15) for year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Seer on emergency basis by way of Snow Clearance (Stage 7) for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Seer on emergency basis by way of Snow Clearance (Stage 8) for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Sallar on emergency basis by way of Snow Clearance (Stage 10) foryear 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Sallar on emergency basis by way of Snow Clearance (Stage 12) for year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Pahalgam on emergency basis by way of Snow Clearance (Stage 4) for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Seer on emergency basis by way of Snow Clearance (Stage 6) for the year 2026-27
Restoration of road surface under the jurisdiction of PW(RnB) Sub Division Pahalgam on emergency basis by way of Snow Clearance Stage 1st for the year 2026-27
Jackpushing required for road crossing of distribution main and restoration of road for damage portion due to newly laid secondary rising main within Hasnabad Surface Based Water Supply Scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte.
... towards Murarisha and Taki PWD road within Hasnabad Surface Based Water Supply Scheme, ...
S/R to NH-5 to Ardalua Road From 14/200 Km to 14/850 Km and 15/090 Km to 18/000 Km for the year 2026-27. (Such as surface repair with WMM, BUSG,PMC and SC in stretches)
Cleaning road surface with mechanical broom and ...
Restoration of road surface under the jurisdiction of PW(R B) Sub Division Bijbehara on emergency basis by way of Snow Clearance (Stage 7) for the year 2026-27
Restoration of road surface under the jurisdiction of PW(R B) Sub Division Bijbehara on emergency basis by way of Snow Clearance (Stage 9) for the year 2026-27
Necessary repairing and painting internal surface of (Ground and 1st Floor) Posta Police Station at 67/50, Strand Road, Kolkata-700007, during the year 2026-2027.
Restoration of road surface under the jurisdiction of PW (RnB) Sub-Division Pulwama on emergency basis by way of Snow clearance (Stage contract-01) for the year 2026-2027
Restoration of road surface under the jurisdiction of PW(R B) Sub Division Anantnag on emergency basis by way of Snow Clearance (Stage 1) for the year 2026-27
CERTAIN REPAIRS TO PATH, SEWAGE DISPOSAL, SECURITY WALL AND OTHER MISC REPAIRS AND REPAIR/RE-SURFACING OF ROADS AT ICGS KAKINADA UNDER GE (I)(CG) VIZAG
Flank restoration and surface dressing from chainage 7.00 km to 8.00 km of Barrackpur Barasat Road in the District of North 24 Parganas during the year of 2026-2027.
Restoration of road surface under the jurisdiction of PW (RnB) Sub-Division Pulwama on emergency basis by way of Snow clearance (Stage contract-04) for the year 2026-2027
Restoration of road surface under the jurisdiction of PW(R B) Sub Division Anantnag on emergency basis by way of Snow Clearance (Stage 3) for the year 2026-27
86231 SPECIAL REPAIRS TO ROAD AT SOUTH CAMPUS AFMC IN FRONT OF PROJECT QTR NO. 01 AND 05, BLDG NO. 178, 179, CCM BLACK TOP SURFACE, DHANVANTARI AUDITORIUM HARD STANDING AND ALLIED WORK IN THE AOR OF AFMC UNDER GE (CENTRAL) PUNE.
... mud water scoring sunken surfaces in roads, paths, etc. cutting around ...
S/R to Pankapal to Military Chhaka (Bijupattanaik Marg) Road from 2/000 Km to 5/500 Km and 7/500 Km to 12/000 Km for the year 2026-27. (Such as surface repair with WMM, BUSG, PMC and SC in stretches)
Cleaning road surface with mechanical broom and ...
Providing Gravel Surface to the road from Karavadi village Railway gate to SC Colony Railway Gate in Karavadi GP of Ongole(M)Grant ZPGF Est cost 10.00L
RESTORATION OF BITUMINOUS ROAD SURFACE AND ALLIED CIVIL WORKS FROM 1/1D TO 11 GANGAPRASAD MUKHERJEE RD AND OTHERS DIFFERENT LOCATIONS DISTURBED BY W.S DEPT OF K.M.C IN WD NO-70.
Refer to BOQ
... experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, ...
Refer to BOQ
... experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, ...
Maintenance work of ( Surface dressing, Jungle cleaning, Drain cleaning and repairing, Kerb stone repairing white washing, painting and other miscellaneous work) of 60m wide road between sector-36/37, Sector-36/31/32 T-Junction to 130m wide road Holy
Annual clearance of road berm upto premix top level, removing of un-wanted excavated earth wet silt from berm, deep drains (having road length of different carriage way 15Km., surface drains offices including green belt/parks at IE Khonmoh
Development of road from Nolongbari to Tulabari L 5.00 KM under Padmabil Block 24 Ramchandraghat Constituency during the year 2026 27 SH Patch metalling, Re carpeting, seal coat, surface drain, Pucca drain, Toe wall, CC Block etc. Gr I from Ch.
Maintenance of bituminous surface road using Jhama brick aggregate ...